SEM Implementation of Meter Data Reading Aggregation, Communication and Storage SIMDRACS 12th January 2005: IGG Hugh Mullany.

Slides:



Advertisements
Similar presentations
16/12/02GS/ALICE TB 1 Update on the ALICE Grounding Plan From draft document (June 02) The grounding plan for ALICE proposed in this document is based.
Advertisements

Infrastructure Planning Commission Workshop 2a Working with the IPC: Guidance and issues for statutory consultees.
The Design Process Step One Contact us to arrange a complimentary design meeting with no obligation.
Mod_03_12 Alignment of TSC with Revised VAT Arrangements 29 th May 2012.
Global Aggregation Working Group 15 th September 2010.
Global Aggregation Working Group 15 th September 2010.
Transition to air quality e-Reporting Introduction to e-Reporting: policy driver, IPR pilot activities, timeline, EEA resources, plans for B-G and update.
Systems Life Cycle 1.Project Idenification 2. Initial Investigation 3. Feasibilty Study 4. Analysis 5. Design 6. Development and testing 7. Implementation.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
© The Delos Partnership 2007 page 1 Vision and Strategy Workshop Organisation for the delivery of the vision and communication.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda 12 th October 2010 Minutes from Previous IGG Meeting.
Sila National Park participates in the European project Bioeuparks that is taking place in the natural parks of five EU countries - the project aims to.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – March 8 th 2007 Minutes from last IGG meeting10.00 – Review of Action Items10.10.
ESB Networks MCR0177 – DG4 for Local Authority Public Lighting 23rd April 2010.
Juliet Corbett, NIAUR. Regulatory Structure  Ireland  CER  Licenses Generators Suppliers ESBCS ESBPG ESB Networks Eirgrid Transmission License Eirgrid.
Systems Development Lifecycle Analysis. Learning Objectives (Analysis) Analysis Describe different methods of researching a situation. State the need.
The Commissioning Academy: Greater Manchester Outcome Based Commissioning in Practice: Cheshire West and Chester Jamaila Tausif Senior Manager: People.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Chapter 3: The Risk Management Process (Continued) 1.
ISCOM 424 Week 4 DQ 1 How does supply chain visibility benefit the operations of a global supply chain? What are some considerations that must be made.
Evolution of storage and data management
PMP Prepay Metering Project
Ensuring Value for Money Asset Management Project at American Samoa Power Authority By William Spitzenberg (ASPA) and Richard Taylor (Thomas Civil.
The inspection of local areas effectiveness in identifying and meeting the needs of children and young people who have special educational needs and/or.
Retail Market Assurance Services for the Irish Electricity Market
Terms and Conditions Review 2011
Retail Market Assurance Services for the Irish Electricity Market
Customer Service Update to IGG
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
ESB Networks AIP Programme
Admissions Tutorial for schools
Introduction to New Product Development (Documentation)
Identify hazards to the force
Harmonisation Working Group
IGG Agenda 23rd February 2011 Minutes from Previous IGG Meeting
WG69 Status Report to ETSI
Harmonisation Working Group Update on Harmonisation Project
Harmonisation Working Group
ESB Networks AIP Programme. Business Design
IGG Agenda 1st October 2009 Minutes from Previous IGG Meeting
SEM Implementation of Meter Data Reading Aggregation, Communication and Storage SIMDRACS 22nd February 2006: IGG Hugh Mullany.
IGG Agenda – 18th September 2008
مسئولیتهای پزشکی درانجام اقدامات تشخیصی و درمانی (رابطه حقوقی پزشک و بیمار)
دکتر سعید غلامزاده مدیرکل پزشکی قانونی استان فارس
Industry Governance Group 18th September 2008
NPA 306/639 (Area Code) Relief in Saskatchewan
The Commission Communication on implementation (COM (2012) 95) in relation to Water Industry Directives (Urban Waste Water Treatment, Drinking Water,
Item 6: Improving assessment of GES Draft conclusions and Way forward
Tom O’Donnell Market Services Co-Ordinator
NPA 450/579 (Area Code) Relief in Quebec
IGG Agenda 29th June 2011 Minutes from Previous IGG Meeting
IGG Agenda 3rd June 2010 Minutes from Previous IGG Meeting
F. Reid, P. Oakeshott, S.R. Kerry, P.E. Hay, J.S. Jensen 
NPA 403/587/780/825 (Area Code) Relief in Alberta
Интерпретация және зерттеу нәтижесін өңдеу
Dry Eyes – Lubricant Eye Drops
Meter Data Publication Timing
Capacity Market Code Modifications
Proposed Changes to UNC Section O
ESB Networks AIP Programme Update to IGG, June 22nd 2006
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Microgeneration 26th August 2010 ESB Networks
Long Term Consumption Adjustments
ESB Networks Update Tom O’Donnell.
ESB Networks AIP Programme Meeting of the IGG, November 1st 2006
Scene setter European Commission DG Environment
MRSO Update Frank Leetch – MRSO IGG 18/05/06.
Industry Governance Group 11th December 2008
Industry Governance Group 11th January 2012
Presentation transcript:

SEM Implementation of Meter Data Reading Aggregation, Communication and Storage SIMDRACS 12th January 2005: IGG Hugh Mullany

SIMDRACS Questionnaire Questionnaires have been returned NIE T&D, SONI, ESB Networks Collated responses have been produced Changes required for SEM initially agreed to be possible Cost estimates difficult at this early stage until detailed requirements are bottomed out

SIMDRACS Global Aggregation Following previous statements from the Commission and Authority ESB PES aggregation likely NIE Supply aggregation unlikely Treatment of the Irish residual will affect all suppliers Consultation necessary

SIMDRACS Next Steps Workshops between “primary users” of data communications Beginning next week Focussing on Project Initiation Document Decisions still outstanding on Global aggregation Communications Consultation on residual if required February