Ray Filip BEng (Hons), MSc, DIC, CEng, FICE Temporary Works Consultant 31 years temporary works experience: Concor Construction (Africa) John Laing.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Managing the Health and Safety of Contractors
A Joint Code of Practice Objectives and Summary Presentation
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Construction (Design and Management) Regulations 2007
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
MANAGING CONTRACTORS PERSPECTIVES FROM THE MHSA. copyright reserved 2003, department, company INTRODUCTION More work is being outsourced to contractors.
WHS Considerations for 2014 and Beyond Christian Frost Head of Workplace Health and Safety John Makris Partner – K&L Gates.
CDM 2015 Key Changes and Duty-Holder Responsibilities
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
Construction (Design and Management Regulations) 1994
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Temporary Works – What Needs to be Done
CDM Regulations 2015 The Practical Implications of the Changes for the Construction Industry 17th June 2015 Slide 1 They say a journey of a thousand miles.
Utilities Working on the Network Health & Safety Requirements.
The Construction (Design & Management) Regulations
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
WHS Management Plans.
Temporary Works.
CDM 2007 MAKING A DIFFERENCE Ken Logan. CDM 2007 : – Making a Difference The Challenge To change attitudes To change behaviours Achieve sensible risk.
The Rail Safety Summit  2015 RAIL SAFETY SUMMIT 2015.
UK’s CDM Regulations 2007 and its Applications in Singapore
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
Old Policy – which no one ever seem to have heard of.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
Health and Safety Executive CDM 2007, Construction clients and fragile roofs Russell Adfield Construction Sector.
Health and Safety Policy
DIRECT WORKS FORUM CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Aylesbury: Dunfermline: Belfast:
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
A European campaign on Risk Assessment Common errors in Risk Assessment.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
CDM 2015 What we’ve learnt so far 20 October 2015.
Health and Safety Everyone’s responsibility
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
CDM Construction Design and Management
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07.
CDM Client Briefing Tim Knowles
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Presented by Kevin Williams
ZZZZ Best Review: Limited assurance that the financial statements have been prepared in conformity with GAAP. A “clean” review report provides negative.
EIA approval process, Management plan and Monitoring
Maintaining Safety Standards
Health and Safety Policy
CONTRACTORS’ ACTIVITIES
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Maintaining Safety Standards
Temporary Works Co-ordination
Design Risk Management Spotlight on CDM 2015
Quality Management Systems – Requirements
CDM 2015 COSG Update.
Works and Services Supervisor
The Construction (Design and Management) Regulations 2015
Regulatory Oversight of HOF in Finland
Prevention through planning, control and monitoring Harold Chinogurei
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
Effective Construction Safety Management
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Frank Power Ergonomist (Inspector) Health and Safety Authority
Client duties on CDM Regulation 2015
Presentation transcript:

Ray Filip BEng (Hons), MSc, DIC, CEng, FICE Temporary Works Consultant 31 years temporary works experience: Concor Construction (Africa) John Laing Construction (UK) Kier Group (UK, Africa, Hong Kong) Dawson Contracting (UK, Europe, USA) Last 11 years my own consultancy (UK & Europe) Member of BS5975: 2018 drafting committee Also representing: Temporary Works Forum

www.twforum.org.uk

GUIDANCE FOR DESIGNERS (CDM) The PD’s main role is to: Plan, manage, monitor and coordinate H&S: 1. identifying, eliminating or controlling foreseeable risks. 2. ensure designers carry out their duties. 3. prepare & provide relevant information to other duty holders, that there is an appropriate process for designer coordination and co-operation when there is interaction between temporary works and permanent works. 4. provide relevant information to the PC to help them plan, manage, monitor & coordinate H&S in construction phase.

GUIDANCE FOR DESIGNERS (CDM) The PD should, so far as is reasonably practicable: 1. Ensure that PWD’s have considered the impact of their designs on H&S during construction 2. Ensure PWDs followed the ‘general principles of prevention’ within their design e.g. Designing steelwork that is purposely designed to accommodate safety netting to aid assembly; The PD should ensure PWD’s provide relevant information on their designs to inform TWD’s (especially risks or loads that could impact on TW or assumed sequencing to prevent instability)

GUIDANCE FOR DESIGNERS (CDM) PWD’s need to consider how something is to be constructed, cleaned, maintained and decommissioned. This involves ensuring that the overall design takes account of any temporary works needed including checking that consideration has been given to sufficient working space and sequencing.

BOOTLE 2000

TWO DEMOLITION WORKERS KILLED ONE SERIOUSLY INJURED Stanley Rd closed for 4 weeks Most ground floor beams removed without any temporary support provided No lateral support provided PC fined £173k, Planning Supervisor fined £68k, Demolition contractor fined £16k, Site agent received conditional discharge Total cost resulting from collapse around £7million

• Minimise chance of errors being made & maximise chance of errors being found • Needs to be effective communication of information between all parties, whether they are concerned with PW or TW. • An effective system of checking, both the design and implementation is needed

BS 5975: 2008 +A1 2011 PROCEDURES Precedence for procedures and Designated Individual Identify TW – Tender stage & schedule Appointments – TWC + ATWC + TWS – By whom, competence, in writing, acceptance, responsibility Classify TW according to risk – execution class Appoint competent designer Provide written design brief Design + Residual risks + Checking Design + Approval Site review Procurement + Equipment Inspection + Assembly (RA,MS) Significant on site modifications need designer approval Inspection by competent person Permit to __________ Inspection + Monitoring + Maintenance Review procedure, audit, feedback

DESIGN CHECK CATEGORIES CATEGORY SCOPE INDEPENDENCE Restricted to standard solutions Site issue – by another member of site team or design team 1 Simple design By another member of design team 2 More complex design By individual not involved in design and not consulted by original designer 3 Complex or innovative design By independent organisation