MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Eight Cohesion Fund (Regulation 1164/94) Monitoring Committee Sofia, Bulgaria 19 - 21 January 2011
Main Collector I – Stara Zagora
Strengthening after reinforcement of the excavation Main Collector I – Stara Zagora MPR 3 Excavation works for the trench of pipe D=2000mm December 2007 Strengthening after reinforcement of the excavation
Main Collector I – Stara Zagora Back fill acc. to Detail for pipes D=2000 mm Shuttering and reinforcement