Lowermost Pajaro left-bank bench vegetation just downstream from Thurwatcher Bridge.

Slides:



Advertisements
Similar presentations
Maps Tell Us About Where We Live
Advertisements

6.5 River Stability and Bank Protection John Ratsey
Landforms of the Fluvial System
Redwoods National Park. Elk Camp Site. Looking from north toward south.
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Application of the Continuous Slope-Area Method for Determining Stream Discharge and Development of Rating Curves in Ephemeral Channels Navajo Nation Hydroclimate.
How Do Rivers Change the Land?
Cow Creek Pre-Project & Post-Project Comparison Oct. 15,
Engelsby Brook Final Project ENSC 285B Peter Dufault Burlington & South Burlington, Vermont April 29, 2005.
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012.
Brief Synopsis of Project Hickahala Creek Hickahala Creek Pipeline Protection Project at milepost Tate County, Senatobia, MS Designed by Submar,
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Project Slide Show. This 1893 photograph is of the Prather pump in the Shasta River Canyon about five miles upstream of the mouth of the river. Large.
Carlisle Case Study Using an Atlas, describe the location of Carlise.
RIVER FORMATION EARTH’S GRAVITATIONAL FORCE PULLS OBJECTS TOWARD IT’S CENTER OF MASS. WATER FALLING DOWN A SLOPE IS EVIDENCE OF GRAVITY. AS OBJECTS DROP.
River Severn Virtual Fieldtrip
Background: In the mid 18 th century a dam was built at E N for the E.N. Colton shingle and saw mills along the Mill Brook in the town of.
Rush Creek Watershed Road Stream Crossing Survey Survey conducted by Janice Tompkins and Mary Sievert, MDEQ during October and November of 2003.
CHARACTER OF RIVER CHANNELS
Nisqually River 2009 Source to Sink
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
Natural Riparian Resources Water Landscape & SoilVegetation.
Rocky I Bridge Installation Park Butte Trail June 2005.
The Lake of the Cross The Lake of the Cross is one of the biggest natural dam in Romania and it is located in The Stanisoara Mountains in the village.
San Simeon Earthquake Ground Deformation Photos by California Geological Survey.
Streams (Rivers). Runoff: H 2 0 that does not sink into ground Most ends up in streams.
Streams and Flooding Chapter 6  Water shapes the earth’s surface  Water also plays a role in human affairs  Floods are the most widely experienced catastrophic.
Streams and Flooding Chapter 6 Water shapes the earth’s surface
Streams (Rivers) Sci 6.1. Runoff: H 2 0 that does not sink into ground Most ends up in streams.
Landform Geography Fluvial Landforms.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
Stream Erosion and Transport
The hydrologic cycle. Running water Streamflow Two types of flow determined primarily by velocity –Laminar flow –Turbulent flow Factors that determine.
An Experience In Conducting A Longitudinal Profile… A Study of the Response of San Pedro Creek to the US Army Corps of Engineers (USACE) Flood Control.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Streams GLG Physical Geology Bob Leighty. These lecture notes are very similar to the ones I use in my traditional classes. You’ll find they are.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Rivers and Streams. River Systems A river or stream: any body of water flowing downhill in a well defined channel A river or stream: any body of water.
A Sediment Budget for Two Reaches of Alameda Creek (1900s through 2006) Paul Bigelow, Sarah Pearce, Lester McKee, and Alicia Gilbreath.
Looking upstream from the Main Street Bridge: left to right, top: June 2004 (plant dominated reach following a dry winter), June 2005 (algal takeoff after.
Lake Tahoe Stream Channel Load Reduction and Costs Virginia Mahacek Valley & Mountain Consulting September 2007 Focus Team Workshop 1.
VALLEY CROSS-PROFILES OF THE RIVER WYE. THE UPPER COURSE.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
(,rivers, brooks, creeks, etc.)
RIVERS THE MIDDLE COURSE.
1 Wallace Creek, USGS aerial view, about 1990 USGS Photo.
Bitter Creek Stream Restoration Preliminary Engineering Report Neighborhood Meeting.
Water Erosion Chapter 3 Section 2. Standard S 6.2.a – Students know water running downhill is the dominant process in shaping the landscape S 6.2.a.
The River. Natural flowing watercourse, usually freshwater, flowing towards an ocean, a lake, a sea, or another river A river could flow into the ground.
Introductions U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
January 2009 Phase IVB Construction Photographs by Brent Anderson.
Land and Water Formations
Yukon Conservation Society/LightHawk Organization Faro Mine Flight September 14, 2017 Gerry Whitley pilot Flight path was over the mine and the length.
RUNNING WATER.
Power of a Rain drop.
When should you fix a stream????
River Processes.
Sand Deposits and Flooding Along the San Jacinto River
What runs but never walks, Has a mouth but never talks, Has a bed but never sleeps, Has a head but never weeps?
Erosion and Deposition
River System Development
The hydrologic cycle.
Meandering Rivers.
The Work of Streams.
River Systems Part 2 Features of a Meandering River Levees
1ST YEAR OF ESO RIVERS PROFESOR TIERNO GALVÁN SECONDARY SCHOOL.
River Severn Virtual Fieldtrip
When should you fix a stream????
River Systems Chapter 15.
Laguna Creek Watershed Management Plan Hydrology and Geomorphology
Presentation transcript:

Lowermost Pajaro left-bank bench vegetation just downstream from Thurwatcher Bridge

Corralitos Creek above Salsipuedes ~ 1910?

Salsipuedes & Corralitos Junction

Murphys Crossing: view downriver

View upstream – big bend just west of Aromas Important flood storage area

Probably near Aromas ~1915 view upstream

View downstream at Aromas - quarry product spills from railroad r-o-w?

View Downstream over Chittenden - Soda Lake Meander Scars

Future site of Graniterock Wilson Quarry (left) - view downstream

Railroad Bridge at Chittenden with 1906 faulting repairs USGS photo

Upper Pajaro River joining lower San Benito River - view east

Upper Pajaro River (right) joining San Benito River (foreground) View west (downstream)

July 1952

Lower San Benito - pre-mining June, 1939

Hillsdale sand and gravel. View upriver

Bench height 142; river bed 132; berm height December 2000

View upstream Hillsdale quarry. February, 2004

View downstream Hillsdale Quarry

Crossing berm was 13+ ft high in December, 2000

Haul Road berm ~4-10 feet high - view south to San Juan Bautista

Channel isolated in old spoils disposal and mining area

Overview Dec 2000 (A = Abandoned flood plain segments) Hillsdale Quarry site - San Benito River

Gravel skimming and stream-bed mining - view south

Past stream-bed mining site, and present mountain-top removal site for Hillsdale plant. View northwest. Banks 10ft and stable.

View southwest (downstream) moving up into bank cutting areas

Lower Lucy Brown Lane reach. Bed of river here mined about ft below grade. Left bank erodes in floods (~15 ft high)

Lucy Brown lower reach view of right bank ft high

Lower Lucy Brown reach - left bank active bank cutting 20 ft high

Bank cutting and slumping just downstream from Lucy Brown Ln - View downstream

Bank cutting and slumping just downstream from Lucy Brown

Slump along right bank - lower Lucy Brown stream bed mining reach

Upper Lucy Brown Ln reach - operator shut down in 2002 View southwest of left bank 25 ft high

Narrowest point on lower San Benito River - excavated channel

Low berms do not protect closed plant site

Sod Farm site - view west. Floodplains being abandoned but carried floodwater in 1995 and 1998

Small berm protects sod farm from 1-10 yr events - view west

Mitchell Road 1 km wide reach - flow to left

View upstream (south). Hwy 156 bypass; and Hwy 156 commercial (background) with two sewage pond sites in historic floodplain.

New Highway 156 bridge near Mitchell Road reach and lower pond complex protected by berms in floodplain. View north.

USGS gauging site (rt bank) along old Hwy 156, Hollister

Upper Hollister sewage ponds stable channel

Same site of destroyed bridge

Same site in summer when a temporary crossing is built View upstream

Heavy vehicle use in channel - view downstream to Hollister

Union Rd. bridge, view north downstream. Cienega Rd, Hollister

Union Rd. bridge - view upstream. Banks ft high, actively cut.

Ditto - view downstream

Site of Cienega Road house site where 40+ feet of bank 25 ft high was lost in View upstream to Hospital Road seasonal crossing.

Cienega Road house site with two cutting left bank levels

Right bank material may be mining spoils - about 20 ft high

Basal left and right bank alluvium

Old quarry site with berms in the channel just above Hospital Road Seasonal crossing site. Gravel processing site was upper left

Failing banks at site of past river bed mining just downstream from Tres Pinos Creek tributary. View of right bank ~ 20 ft high.

Natural slump (reactivated in 1995) near Tres Pinos Creek - View South

Ditto - this is a source of gravel-sized materials - Left Bank

Tres Pinos Quarry, Tres Pinos Ck. Right bank terrace mining; floodplain disposal

Tres Pinos Creek, view upstream - disposal in floodplain of fine spoils