1,000 MWH Selected Installations Off-Grid | Remote Off-Grid | Remote

Slides:



Advertisements
Similar presentations
Aditya Pavan Kumar.T (08FE1A0202) VIGNAN’S LARA INSTITUTE OF TECHNOLOGY AND SCIENCE 1.
Advertisements

TIME OF USE RATES AT THE UNITED ILLUMINATING COMPANY Presented at: Connecticut’s Energy Future December 2, 2004 James D. Lundrigan Pricing Manager The.
Gold Souk Visiting the renowned Gold Souk in Dubai is one of the best things to do in UAE. The souk is an area that is full of shops selling diamonds.
AL WADI Survey Report Conducted By: Green Line Company.
Samples of Projects which I participated in…
This is me My mom and I are in Ski Dubai. I'm in front of Burj Khalifa tower with my dad.
CUBA ELECTRIC INDUSTRY
Geography: The UAE Week 11 Lesson 1.
UAE National Day Ali Saeed Alshamsi.
Six Ways to make your Canvas Course more Accessible
Travel and Transportation Allowances
Assessing General Aviation Pilots' Weather Knowledge and Self-Efficacy
Developing Web-applications with Grails framework
East Hill Foundation.
Summary of 1st Visioning Conference
Dealing with Challenging Matches
How to Read a Song with Multiple Verses and Refrain
Title of Training Presentation
Marketing and Recruitment Peer Sharing Call
Empirical advances in studying relational networks
The Leadership Imperative for Operational Effectiveness
Case Clinic: Who Is the Leader?
Gallatin Gallopers 4H Helmet Safety
ActiveParent and CCSD Website Presentation
Kleeneze Browse Products screen walkthrough
Defining Decade of Canada
ELAC Meeting February 17, 2017.
Presented by Raji Arora, Founder STEM Shed
ELAC Meeting September 14, 2017.
Six Ways to make your Canvas Course more Accessible
Our Homestay Community
CS6604 Project Ensemble Classification
Accounts Payable Purchase Order Balancing
Title of Training Presentation
CASAS Reports: Assess, Analyze and Adjust
Intro to Services: Range, Threshold, & Order of Goods
Dulles Area Association of REALTORS®
By: Deniz Sevinc and Jonathan Luu
LinkedIn Basics Monica Dombrowski Technology Education Manager
National Mentoring Month Peer Sharing Call
Does the Charge (kW) or the Discharge (kWh) drive the Cost
SQL SERVER TRANSACTION LOG INSIDE
Graphic Organizers C3 Chart Edition!
ELAC Meeting February 11, 2016.
Ap human geography Industrialization and economic development
AP Human Geography Population and Migration Unit
Forging and machining equipment
ALASKA VILLAGE ELECTRIC COOPERATIVE Energizing Rural Alaska since 1968
The HDI: Measuring Development
AP Human Geography Population and Migration Unit
ELAC Meeting October 15, 2015.
Kids Who Come into the Playroom: AD/HD, Selective Mutism, Oppositionality, and More Dianna Green, MSW LCSW.
Session 5: Sexting.
Avery Smith BranchManager Tangipahoa Parish Library
RENEWABLE ENERGY USING HIGH-EFFICIENCY TURBINES
Fleet Electrification
PAWAWORLD: WHY KENGEN SHOULD EMBRACE BATTERY ENERGY STORAGE SYSTEMS
Mad Scramble for Africa
You can do it in an hour!
Mad Scramble for Africa
AP Human Geography Population and Migration Unit
World Geography Human Geography Unit
Session 3: Overexposure
Uniform Companies in Dubai
Civil Electronic Filing Q&A
Title of Training Presentation
Cost of Electricity & Energy Usage Energy Use Recall: Measured in Watts (W) Electrical power is the rate at which electrical energy is produced.
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Blockchain Mining Games
Come get a Taste of our PB & J: Positive Behavior Journey
Presentation transcript:

1,000 MWH Selected Installations Off-Grid | Remote Off-Grid | Remote www.qmega.ae Selected Installations Fastener Forging Factory | UAQ 200kW Primary Power Operating Working Hours Lube Oil Factory | Ajman 75 kW Primary Power - 24 | 7 Labour Camp| Ajman 50kW Primary Power - 24 | 7 Camel Farm | Dubai 45kW Primary Power - 24 | 7 Off-Grid | Remote Off-Grid | Remote Desert Safari Camp | Dubai 50kW Primary Power - 24 | 7 Private Residence | Dubai 50kW Primary Power - 24 | 7 GENERATING 1,000 MWH per YEAR Fish Cage Factory | Dubai 20kW Primary Power - 24 | 7

50kW System, Labour Camp, Ajman Solar Project of the Year, 2015 www.qmega.ae 50kW System, Labour Camp, Ajman Solar Project of the Year, 2015 Peak Load: 50 kW Storage: 307.2 kWh Operation: 24 hours/day 100% diesel elimination How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.

200kW System, Factory in Umm Al Quwain, UAE www.qmega.ae 200kW System, Factory in Umm Al Quwain, UAE Peak Load: 200 kW Storage: 346.2 kWh Operation: 9am – 6pm 100% diesel elimination How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.

75kW System, Lube Blending Factory, Ajman, UAE www.qmega.ae 75kW System, Lube Blending Factory, Ajman, UAE Peak Load: 75 kW Storage: 307.2 kWh Operation: 8 am - 12 midnight 100% diesel elimination How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.

50kW System, Desert Safari Camp, Dubai, UAE Peak Load: 50kW Storage: 76.8 kWh Operation: 4pm – 10 pm 100% diesel elimination How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.

45kW System, Camel Farm, Dubai, UAE Peak Load: 45 kW Storage: 153.6 kWh Operation: 24 hours/day 100% diesel elimination How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.

20kW System, Fish Cage Factory, Dubai, UAE Peak Load: 25 kW Storage: 76.8 kWh Operation: 9am – 5pm 100% grid elimination How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.

50kW System, Office Block, Karachi, Pakistan Peak Load: 50 kW Storage: 57.6 kWh Operation: 9am – 6pm 100% grid elimination How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.

50kW System, Office Block, Lahore, Pakistan Peak Load: 50 kW Storage: 57.6 kWh Operation: 9am – 6pm 100% grid elimination How presentation will benefit audience: Adult learners are more interested in a subject if they know how or why it is important to them. Presenter’s level of expertise in the subject: Briefly state your credentials in this area, or explain why participants should listen to you.