Scotland’s Shared Axis Energy Diagram

Slides:



Advertisements
Similar presentations
Engineering in business and the environment Lesson 5: Environmental legislation relating to noise and waste.
Advertisements

Scottish Freight Activity Survey. Proposal FTA would like to develop economic and freight indicators specific to Scotland to assist with lobbying on future.
An Introduction to CAN SLIM Investing Tim Dill.
The British Government
CEE NOIA’s meeting Bratislava, 20 April Gasoline - 1 January 2014 – 4.5 % in volume - 1 January 2018 – 8% in volume - 1 January 2019 – maxim oxygen.
Prudential Balanced Fund (PRUBF1) November 2011 Fixed information Licensed Date: 5 October 2006 Listing date: 4 December 2006 Base Currency: VND Tenure:
Engineering Salaries in Ireland RoleYears ExperienceDublin €Cork € Chemical Engineer 0-328,000 – 38,00025,000 – 35, , ,00035, ,000.
THE UNITED KINGDOM OF GREAT BRITAIN AND NORTHERN IRELAND.
Overview of ICTL Training UK (April 2001) Total No. staff undertaking NOF training 7303 No. staff completed NOF training 3940 Total no. of staff to be.
Welcome to the UK!.
M ULTI -S TATE A DVANCED M ANUFACTURING C ONSORTIUM _v001_msamc_sicc_example_industry_partnership _v001_msamc_sicc_example_industry_partnership.
What is the UK? It is the union of England, Wales, Scotland and Northern Ireland.
BRITISH LIFE GREAT BRITAIN (GB) OR BRITAIN It is the name for England, Wales and Scotland.
The United Kingdom.
M ULTI -S TATE A DVANCED M ANUFACTURING C ONSORTIUM _v001_msamc_courseware_quality_quiz _v001_msamc_courseware_quality_quiz2 found in Resources.
M ULTI -S TATE A DVANCED M ANUFACTURING C ONSORTIUM _v001_msamc_courseware_quality_quiz _v001_msamc_courseware_quality_quiz3 found in Resources.
Allocation of R&D expenditure in 2005 between chemical entity and biological or biotech active substances APRIL 2007 SOURCE: CMR INTERNATIONAL PERFORMANCE.
The secure site rendering issue (all navigation crushed together as a list at the top of the page) is a compatibility issue with Internet Explorer only.
The Flag of the UK.
BSI PAS 256: Buried Assets – Capturing, Recording, Maintaining and Sharing of Location Information and Data – A Code of Practice Institution of Civil Engineers.
Unit 4 Learning more about London
Great Britain’s Shared Axis Energy Diagram Daily resolution
Energy & Power Unit 5, Lesson 1 Explanation Presentation 5.1.1
Foundations of Technology Energy and Power
Transitional Exit Capacity Proposals -Update
Control of Hazardous Energy Lockout/Tagout 29 CFR
Single Electricity Market performance over the previous 12 months
Great Britain’s Shared Axis Energy Diagram
Summary of financial results for the period 1-12/2016
Assoc.Prof., Dr., Tran Viet Dung PhD Candidate, Pham Hoai Huan
Energy & Power Unit 5, Lesson 1 Explanation Presentation 5.1.1
Powering the grid in the face of increasing fleet electrification
Messaging in the Media TOP 10 AUDIENCES BY THERAPY AREA
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Tax & Deferred Tax IAS 12.
Great Britain’s Shared Axis Energy Diagram Daily resolution
Action 0002: Meter Error Notifications
2006 Revenue continued to depend on a relatively small number of products APRIL 2007 SOURCE: CMR INTERNATIONAL PERFORMANCE METRICS PROGRAM © THOMSON REUTERS.
, R&D expenditure showed 6% growth annually
2002–2006 Mid and Other sized companies continued to launch the majority of NMEs APRIL 2007 SOURCE: CMR INTERNATIONAL PERFORMANCE METRICS PROGRAM © THOMSON.
Consultant - Energy Regulation
Foundations of Technology Energy and Power
The United Kingdom of Great Britain & Northern Ireland
Horndon SMER 29th November 2011.
% of the projects in development in the leading therapeutic areas were considered to have a novel mode of action APRIL 2007 SOURCE: CMR INTERNATIONAL.
Energy & Power Unit 5, Lesson 1 Explanation Presentation 5.1.1
Saskatchewan Measurement Directive PNG017 DRAFT CHANGES
THE UNITED KINGDOM -THE GAME-.
Energy & Power Unit 5, Lesson 1 Explanation Presentation 5.1.1
Environmental protection expenditure - Supply-side estimates in the UK
energy and environment
Development time for new molecular entities first launched onto the world market between MARCH 2008 SOURCE: CMR INTERNATIONAL PERFORMANCE METRICS.
Cycle times decreased in larger but not smaller, companies
Rocket fuel to ignite your practice
The Economics of Proper Measurement
Energy & Power Unit 5, Lesson 1 Explanation Presentation 5.1.1
Investment update Limits to growth Oil Banks China What next?
Proportion of total R&D expenditure by function in 2005
Great Britain’s Shared Axis Energy Diagram
AQ Review System Calculation Overview
The 7 Myths of Environmental Liability
Meter Read Rejections ..
Physics 251 Dr. Gamble Thermodynamics Electricity Circuits Magnetism.
energy and environment
Weekly System Status week 34 (19/08/2019 – 25/08/2019) System Operator
Weekly System Status week 28 (08/07/2019 – 14/07/2019) System Operator
Weekly System Status week 37 (09/09/2019 – 15/09/2019) System Operator
Weekly System Status week 38 (16/09/2019 – 22/09/2019) System Operator
Environmental Issues in Europe
Environmental Issues in Europe
Presentation transcript:

Scotland’s Shared Axis Energy Diagram Daily resolution Data from: January 2015 to April 2018 Dr. Grant Wilson Updated slidepacks can be found: https://www.researchgate.net/project/Shared-Axis-Energy-Diagrams 19th April 2018

The underlying natural gas data are available at a geographical level of Scotland. The underlying electrical data are available at a geographical level of Great Britain, and the Scottish daily electrical demand is estimated from this. The liquid fuels data is available at a United Kingdom level that includes Northern Ireland, and the Scottish daily transport fuels data is estimated and calculated as 10% of this UK total. All data is sourced from National Grid, Elexon and the department of Business, Energy and Industrial Strategy.

The diagrams in this slidepack have been produced with a Creative Commons Attribution-NoDerivatives 4.0 International license to encourage their wider use in other presentations or reports. On rare occasions, there are errors in the data that have been manually corrected. For most erroneous zero values, the previous valid non-zero value is held until the next valid non-zero value. For a few other erroneous values, a straight line of values between the two valid values is calculated. The occurrence of the errors is rare enough to be negligible, and is generally an error with many of the values in a particular time period. Dr. Grant Wilson Teaching and Research Fellow Environmental and Energy Engineering Group Chemical and Biological Engineering The University of Sheffield grant.wilson@sheffield.ac.uk

Disclaimer The content of this work has been carefully prepared and reviewed. However, the University of Sheffield does not guarantee the accuracy, completeness or quality of the information provided, or that it is up-to-date. The University of Sheffield accepts no liability other than liability that can not be excluded by law whatsoever in respect of any claim or claims arising from the use of this work.

Scotland’s Energy Vectors – in GWh per day

Scotland’s Energy Vectors – in GWh per day

Scotland’s Energy Vectors – in GWh per day

Scotland’s Energy Vectors – in GWh per day

Scotland’s Energy Vectors – in GWh per day