BEAM LOSS MONITORS The BLM system Status of the monitors

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

LHC Commissioning WG 27/03/ Commissioning of BLM system L. Ponce With the contribution of B. Dehning, E.B. Holzer, M. Sapinski, C. Zamantzas and.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Vegard Joa Moseng BI - BL Student meeting Reliability analysis summary for the BLEDP.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
BIW May 2004 LHCSILSystemsBLMSSoftwareResults Reliability of BLMS for the LHC. G.Guaglio, B Dehning, C. Santoni 1/15 Reliability of Beam Loss Monitors.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
The Stripping Foil Test Stand in the Linac4 Transfer Line
E.B. Holzer Chamonix XV workshop, Divonne-les-Bains January 24, BI Group Commitments and Major Issues for Distributed Systems E.B. Holzer, J.J.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
LHC Radiation Day, B. Dehning1 Beam Loss Monitors B. Dehning.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
ELENA installation progress F. Butin / ELENA collaboration.
Phase Feed-Forward Piotr Skowroński (CERN)
The TV Beam Observation system - BTV
2007 IEEE Nuclear Science Symposium (NSS)
BEAM LOSS MONITORING SYSTEM
Instrumentation for Accelerators Technologies for the HL-LHC
Installation of an Instrument on a CERN machine
Injectors BLM system: PS Ring installation at EYETS
Overview of the project
Ideas and design concepts, and challenges
Ewald Effinger, Bernd Dehning
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
CMS November Upgrade Week
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Beam Loss Monitor System Reliability and False Signals
LHC BLM system: system overview
Disabling Rules.
Calorimeter Upgrade Meeting - News
BEAM LOSS MONITORING SYSTEM
Remote setting of LHC BLM thresholds?
Beam loss monitoring requirements and system description
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
BEAM LOSS MONITORS DEPENDABILITY
C.Octavio Domínguez, Humberto Maury Cuna
Test and start‐up procedures
BLM changes HV software interlock (SIS)
Sensitivity tests of BLM_S chamber in PSB dump
Commissioning of BLM system
Status of muon monitor R&D and construction
LS1 status 28/04/2014.
Why do BLMs need to know the Quench Levels?
Beam Loss Simulations LHC
Machine Protection System Commissioning plans
Report on Beam Loss Monitors
LCLS Undulator System Status and Schedule
Report from the LHC BLM System Audit1
LCLS Undulator System Status and Schedule
Presentation transcript:

BEAM LOSS MONITORS The BLM system Status of the monitors B. Dehning, G. Ferioli, J.L. Gonzalez, G. Guaglio, E.B. Holzer, V. Prieto, C. Zamantzas AB-LTC Technical Review November 19, 2003 The BLM system Status of the monitors Status of the electronics Delivery schedule, Integration, Installation Summary

THE BLM SYSTEM Purpose: Machine protection against damage of equipment and magnet quenches. Setup of the collimators Localization of beam losses and help in identification of loss mechanism Machine setup and studies Challenges: Reliable (tolerable failure rate 10-7 per hour) High dynamic range (108) Fast (1 turn trigger generation for dump signal)

Families of BLM’s Recent changes in the functional specification for BLMS* and BLMC (LHC-BLM-ES-0001.00 rev2.0) Description Number of detectors BLMA Quadrupoles along the ring (6 per quadrupole), ionization chambers attached outside of cryostat, time resolution 2.5 ms. ~3000 BLMS Critical aperture limits or positions, ionization chambers, time resolutions 1 turn. ~400 BLMS* Critical positions for injection losses, extended dynamic range: BLMSI (ion. ch.) + BLMSS (SEM), time resolution 1 turn. ~100

Description Number of detectors BLMC Collimation sections, BLMCI (ion. ch.) + BLMCS (SEM), time resolution 1 turn, used to set up the collimators. ~110 BLMB Primary collimators, not part of baseline scenario, for beam studies, bunch- by-bunch resolution. 10

Inside view of an ionization chamber from SPS, Volume: ~ 1 Liter, Gas: N2, 30 Al disks of 0.5 mm, Typical bias voltage: 1500 V. Installation of BLMAs on a SSS quadrupole

The Readout Chain

~3400 ionization chambers of 1 dm3 volume STATUS OF THE MONITORS BLMA and BLMS ~3400 ionization chambers of 1 dm3 volume Status of: Technical Specification: ongoing, mostly done Size (length, diameter) Material (chamber, gas) Production procedure (construction, cleaning, filling) Design: Dec ’03 - Feb ’04 Prototyping: June/July ’04 Manufacturing Contracts: contract in preparation (to be produced in Protvino)

Difficulties and possible consequences: Ageing of chambers (investigate SPS chambers at next shutdown) Schedule does not leave time to test different chambers (gases, cleaning, filling procedures) for ageing. Consequence of ageing is an increased need for calibration. Size of chamber to be coordinated with the requirements for transport space along the magnets.

~ 200 locations with 1 ionization chamber (0.1 - 1 dm3) BLMS* and BLMC ~ 200 locations with 1 ionization chamber (0.1 - 1 dm3) and 1 SEM detector (10 cm2) Functional specifications: dynamic range increased recently (1011-1012) install two chambers with different (yet overlapping) response next to each other. Open questions on feasibility of the envisaged measurements might require reiteration on the functional spec.: Activation of the surrounding material (measurement of low level signals) BLMC: Background and cross-talk signals (from other collimators and the second beam) BLMSI & BLMCI: ionization chambers, same kind as BLMA & BLMS Difficulties and possible consequences: Activation, background and cross-talk Implications on setting up of the collimators > problems with disentangling the losses on each collimator, more beam-time needed

BLMSS & BLMCS: SEM detectors BLMSS & BLMCS: SEM detectors. Deadline for production now advanced by 1 year, because BLMS* probably needed for sector test. Status of SEM: Technical Specification and Design: throughout 2004, will try to find existing chamber design which matches our requirements. Manufacturing Contracts: Q4 ’04 Difficulties and possible consequences : Vacuum needs to hold for the whole lifetime. Test of chambers before installation (beam test). Calibration of installed chambers will not be possible. If no existing design can be reused, problem with schedule: BLMSS: for monitoring, not for machine protection BLMCS: scheduled one year later

BLMB 10 detectors Planned to use standard ACEM detectors (or photo-multipliers), and acquisition systems of LHC BCT. Not part of baseline scenario,for refined beam observation. Status: Detectors on stock Difficulties or trade-offs: Lower end of signal limited by background from activation (installed at primary collimators) Possible redefinition of functional specifications after simulation studies

STATUS OF ELECTRONICS Electronics in the tunnel: current to frequency converter + counter + optical data link ~600 cards Current design of current to frequency converter: Signals of 10 pA to 1 mA converted to frequencies of 0.05 Hz to 5 MHz. Status of: Technical Specification: done (W. Friesenbichler) Design/Prototyping: Current to frequency converter (CFC): choice of technology (dynamic range 108), design, prototyping and testing including digital data transmission done (W. Friesenbichler),

improvements pending (E. Effinger, 2004): Test and calibration procedure implementation Protection against high signal levels Increase mean time between failures (double the analogue electronics) Radiation hardness (change of components) Dynamic range (add ADC to get additional sensitivity below the one count rate - 2 pA) Operating conditions (temperature range) Counter and data link: to be done (2004) Manufacturing Contracts: to be done Pre-series to be delivered Q4 ’04 Series to be delivered Q2 ’05

Difficulties and possible consequences: Low signal limit (noise on up to 250 m long cables from monitor to current to frequency converter in LSS and DS) > more beam-time for machine set-up and tuning (loss minimization). Radiation hardness, ageing > Calibration Temperature dependence after irradiation > Calibration Protection against high signal levels > change electronics in tunnel Reliability: Taking the conservative assumption that the loss is seen by one detector only, the estimated failure rate of the current design is 10-100 times to high (2*10-6/h). That corresponds to 0.7% of dangerous losses passing undetected and resulting in magnet destruction.

At Surface: Threshold Comparator + data receiving ~340 cards (DAB with FPGA and VME64 interface) Status of: Technical Specification: done (C. Zamantzas) Design/Prototyping: Hardware developed together with BPM (J.L. Gonzalez) and collaboration with TRIUMF: First prototypes tested (SPS) done Prototype boards May ’04 Software (C. Zamantzas): Design + software simulation first version (Jan. ’04) FPGA implementation on test board Q1 ’04 on prototype board Q3 ’04 Data link (LASER/diode) selection of components: ongoing (test measurement at PSI)

Manufacturing Contracts: Digital analysis board (DAB): together with BPM Prototype cards: May ’04 Pre-series all cards: August ’04 Contract: Q4 ’04 Delivery of all cards Q4 ’05 LASER/Diode: off shelf Difficulties or trade-offs: Expected to fulfill the specifications

BLMCOM: Combiner and Interface to machine controls 24 cards Status of: Technical Specification: to be done (Q2 ’04) Design/Prototyping: to be done (Q3 ’04) Manufacturing Contracts: produced at CERN (Q1 ’05) Difficulties or trade-offs: Expected to fulfill the specifications

Delivery Schedule (Chambers and electronics) CtC: changes in func. spec., cost increase for 200 - 300 new channels to be analyzed (Q1 ’04) Installation schedule for LHC: to be finished Q4 ’06, no problems expected Cables: partly installed, according to schedule Crates: together with BPM (to be defined soon) Chambers + cables to tunnel crates or patch boxes (LSS): finished Q4 ’06 Electronics: to be finished Q4 ’06 Installation schedule for sector test: to be finished Q4 ’05 Storage: no difficulties Complete test at CERN before installation: foreseen Quality control/acceptance issues: no difficulties expected

Integration Interference with other installations: Machine protection and dump: tests of the combined system foreseen Services/cables already ordered: Cables: yes, except: Cables for the recent upgrade of the functional specifications Collimation region (positions not yet defined) Services for installation: 2 teams of 2 persons each, to be ordered Software services: yes

Planning for Installation in the Tunnel Difficulties of access or co-habitation: no. Needs for transport and handling: few pallets to each LHC point Hardware Baseline System is part of baseline Documentation in EDMS: technical specifications of: Ionization chambers: started, Feb. ’04 SEM: Q4 ’04 Current to freq. converter: Q4 ’04 Threshold comparator: Feb. ’04 MTF for manufacturing follow-up: to be done when production of components has started.

SUMMARY Schedule is tight: Analog electronics is late by about 1 year (lack of manpower). Digital electronics is late by about 3 months (DAB board 7 month late). Ionization chamber still on schedule, but problems with availability of technical designer. SEM: If no existing system can be adapted - problem with the schedule. Demands on system have recently increased - implications on the schedule (SEM detectors for sector test) and on cost (200-300 new channels not yet financed).

The BLM design is based on the functional specifications, which in turn rely on a provisional strategy for machine protection. Further changes in the BLM system will become more and more expensive. Identified possible conceptual and/or technical limitations. The main consequences, in case they cannot be solved will be higher need for beam-time for set-up and tuning of the machine increased number of downtimes. Apart from these limitations - production and installation of the BLM system can be in time for sector test and LHC.