1 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY DEKRA INDUSTRIAL.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1 A B C
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
David Burdett May 11, 2004 Package Binding for WS CDL.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 22 November 2012.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
Subtraction: Adding UP
: 3 00.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

1 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY DEKRA INDUSTRIAL

2 I N D U S T R I A L Our Services EUROPEAN DIRECTIVES THIRD PARTY INSPECTION AND CONTROL SERVICES WELDING AND BRAZING TECHNOLOGY CONSTRUCTION SUPERVISION & INSPECTION MATERIAL TECHNOLOGY TRAINING AND CONSULTANCY CERTIFICATION OF ADEQUACY DEKRA INDUSTRIAL TURKEY

3 I N D U S T R I A L European Directives -97/23/ECPressure Equipment Directive -2010/35/EU Transportable Pressure Equipment Directive -2009/105/EC Simple Pressure Vessels Directive -2006/42/EC Machinery Directive -95/16/EC Lifts Directive -94/9/EC Equipment and protective systems for potentially explosive atmospheres DEKRA Turkey gives inspection and certification services with different notifications of DEKRA Group companies for CE and π marking of pressure vessels, steam boilers and other products according to below mentioned European Directives. DEKRA INDUSTRIAL TURKEY

4 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY CE Marking According to 97/23/EC Pressure Equipment Directive for a Steam Boiler 31 Bar 7200 kg/h

5 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY CE Marking According to 97/23/EC Pressure Equipment Directive for a Steam Boiler 40 Bar 100 Ton/h

6 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY Marking According to 99/36/EC Transportable Pressure Equipment Directive for LPG Cylinders

7 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY Marking According to 2010/35/EU and ADR for Tankers

8 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY Marking According to 2010/35/EU and ADR for Cylinder Valves

9 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY CE Marking According to 87/404/EEC Simple Pressure Equipment Directive for Truck Air Tanks

10 I N D U S T R I A L Third Party Inspection and Control Services DEKRA gives project approval, hazard analyze, production control, assembly control and certification services independently on below mentioned facilities and equipments on the base of national & international regulations, norms and technical specifications - Power Plants -Petro - Chemical Facilities -Refineries -Pipe Production and Pipelines -Construction Sites -Steel Construction -Boilers -Pressure Vessels and Equipments -Pre-shipment -Material -Destructive and non-destructive tests -Casting and Forging -Mechanical and electrical installations -Occupational health and safety -Cranes and conveyors DEKRA INDUSTRIAL TURKEY

11 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 135 t/h, 427 0C, 62 bar Natural Gas Firing Steam Boiler and equipments

12 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 160 MW Thermal Power Plant With Circulating Fluidized Bed Boiler Manufacturing and Erection Control

13 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 2X600 MW Thermal Power Plant with Once-Through Π-type with Supercritical Boiler Manufacturing and Erection Control

14 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 919 MW Gaz Burned Combined Cycling Power Plant

15 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 220 MW Gaz Burned Combined Cycling Power Plant

16 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services Control of Renovation Works for the Biggest Refinery In Turkey (Tupras)

17 I N D U S T R I A L Project Follow-Up (Bank Engineering) DEKRA gives investment follow-up (abk engineering) control and certification services independently on below mentioned facilities and equipments on the base of credit agreement and investment plan. - Power Plants -Petro - Chemical Facilities -Refineries -Constructions -Industrial Facilities -Control of Feasibility Report -Monthly/Quarterly Project Progress Control -Cost Control of Project -Control of Project Permission Progress (exproportion, governmental license..etc) -Control of the Financial Inquiry of Investor DEKRA INDUSTRIAL TURKEY

18 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Bank Engineering for the 2X MW Thermal Power Plant in Zonguldak Project Follow-Up (Bank Engineering)

19 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 2X600 MW Thermal Power Plant in Iskenderun

20 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 50 MW Thermal Power Plant in Kutahya

21 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 60 MW Hydro Power Plant in Mugla

22 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 13 MW Hydro Power Plant in Katamonu

23 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the Biggest Wind Energy Power Plant 150 MW

24 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 140 MW Wind Energy Power Plant

25 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 54,9 MW Poyraz Wind Energy Power Plant

26 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 30 MW Seyitali Wind Energy Power Plant

27 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 30 MW Kozbeyli Wind Energy Power Plant

28 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 30 MW Samurlu Wind Energy Power Plant

29 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 20 MW Sayalar Wind Energy Power Plant

30 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for Electricity Distribution Investment for 5 cities

31 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for Capacity Extantion project of Biggest Woden Product Manufacturer

32 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for Steel Manufacturer Investment

33 I N D U S T R I A L Welding and Brazing Technology -Checking of welding and/or brazing procedure specifications (WPS, BPS) -Testing and certification of welding and/or brazing procedures (WPQR, BPQR) -Testing and certification of welding and/or brazing personnel (WPQ, BPQ) -Inspection and certification of manufacturers on the base of welding and/or brazing adequacy (EN 729-ISO 3834) -Training and certification of welding coordination personnel (EN 719-ISO 14731) -Welding Supervision DEKRA gives training, consultancy, inspection and certification services according to relevant national & international norms (EN, ISO, ASME) for welding processes and personnel DEKRA INDUSTRIAL TURKEY

34 I N D U S T R I A L Welding and Brazing Technology DEKRA INDUSTRIAL TURKEY Welder and Welding Procedure Qualification Tests and Sertification acc. 97/23/EC Pressure Equipment Directive for 160 MW Power Plant Erection

35 I N D U S T R I A L Welding and Brazing Technology DEKRA INDUSTRIAL TURKEY Welder and Welding Procedure Qualification Tests and Sertification acc. 97/23/EC Pressure Equipment Directive for 20 MW Power Plant Erection

36 I N D U S T R I A L DEKRA gives inspection, project management, controlling and certification services for each stage of construction projects according to customer specifications and related standards -Project control and approval -Auditing of the construction companies and certification of the adequacy -Construction site control -Hazard Analyze -Mechanical installation (Heating, cooling, air conditioning and plumbing) control -Fire safety system control -Electrical installation control -Control of automation and communication systems -Occupational safety audits Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY

37 I N D U S T R I A L ECE Turkey m 2 Marmarapark Shopping Center Firefighting, Mechanical Electrical Systems Acceptance Control Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY

38 I N D U S T R I A L ECE Turkey m 2 Espark Shopping Center Electrical and Mechanical Systems Acceptance Tests Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY

39 I N D U S T R I A L Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY METRO Cash and Carry Antalya Hipermarket Steel Structure Alteration Works

40 I N D U S T R I A L Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY METRO Cash and Carry Karagandy-Kazakhstan Hipermarket Steel Structure Alteration Works

41 I N D U S T R I A L Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY Static Examinations and Soil Investigation for Carrefour Turkey

42 I N D U S T R I A L -EN Certificate -Batch acceptance tests and certification -Casting / Forging controlling -Optimization and inspection of forming processes -Preparation and inspection of heat treatment processes -Analysis and evaluation of macro and micro structures -Witnessing the mechanical and technological tests and reporting -Determination of remaining life of equipments and materials Certification of conformity of materials, which will be used for production of equipments according to European Directives and/or ASME, Material Technology DEKRA INDUSTRIAL TURKEY

43 I N D U S T R I A L Training and Consultancy -European Directives -Harmonize Standards -Pressure equipment regulations (AD 2000, CODAP 2000,…) -ADR -Welding and brazing technology -Welding coordination personnel -Material technology -DT and NDT tests -Occupational health and safety -Fire protection and safety DEKRA gives training and consultancy services with highly experienced experts to provide qualified personnel, which are in need by the industrial fields, about; DEKRA INDUSTRIAL TURKEY

44 I N D U S T R I A L Certification of Adequacy Our experts perform audits of production process and quality systems of pressure equipment manufacturers and their material manufacturers within taking into consideration the capability of them. If the results of audits are in conform with the related regulation and standard, certificates will be issued according to; -AD2000 HP0 -EN729 -AD2000 W0 DEKRA INDUSTRIAL TURKEY

45 I N D U S T R I A L YOUR RELIABLE PARTNER for QUALITY and SAFETY