07/07/2014 * status, all * AccTest framework

Slides:



Advertisements
Similar presentations
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Advertisements

LHC Commissioning WG 27/03/ Commissioning of BLM system L. Ponce With the contribution of B. Dehning, E.B. Holzer, M. Sapinski, C. Zamantzas and.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Barriere O, Le Roux P
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
Eva Barbara Holzer MPP, CERN July 31, Eva Barbara Holzer, CERN MPP CERN, July 31, 2009 PROCEDURES FOR CHANGES TO BLM SYSTEM SETTINGS DURING LHC.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Status of ZDC Yasa & Michael for ZDC group, KU, Iowa, UIC 20 th September 2008 Integration close Safe operation OK Grounding Tolerable Firmware Needs to.
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Collimation Activities during EYETS
Linac4-PSB 160 MeV connection readiness review
TOTEM Electronics Status
Cabling for LHCb Upgrade
Report on database work for INB in ATLAS
S.Movchan Straw manufacturing and QC
BA6 – crab cavity activities in EYETS
Injectors BLM system: PS Ring installation at EYETS
SPS - EYETS 2016/17 Vacuum systems planning
ProtoDUNE Installation Workshop - DAQ
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Injection region BLMs – ECR
Coordination of Hardware Commissioning
The MTF adjusted system to meet Vacuum Group needs
EN-STI activities in LHC during EYETS
WPs concerned by L4 connection:
Dose levels at the SPS, monitoring and calculation.
Beam Loss Monitor System Reliability and False Signals
Tuesday 11th September LHCb dipole presently fault off
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Disabling Rules.
GIS Portal Racks Project
Remote setting of LHC BLM thresholds?
BLM planning 24/02/2014.
BLM planning 03/03/2014.
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
Commissioning of BLM system
LS1 status 28/04/2014.
2003 test beam with 25 ns bunched muons
Process Flow For Electronic Component Prep
LS1 status 24/03/2014.
LS1 status 17/03/2014.
Re-Installation (days)
LHC BLM Software audit June 2008.
LS1 status 07/04/2014.
WSP-ATR Submission Process supported by.
BLM planning 03/02/2014.
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Configuration of BLETC Module System Parameters Validation
LS3 Study & Readiness Meetings
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
Rack installation and local tests for the MEBT Chopper Rack
Daniel, Gianluca and Belen (for the Collimator team)
CSC Electronics Installation and Commissioning Oct ‘06
SPS Planning meeting for LS2 #26 Vacuum sectors status
Presentation transcript:

From: Bernd Dehning Sent: 04 July 2014 17:27 Subject: meeting LHC BLM, 07.07.2014 in room 865 1-B03 07/07/2014 * status, all * AccTest framework * preparation for source measurements

ARC LHC matters Slava Sector 4-5: DS’s done, up to 30R4 done After He spill test - the mini-racks under the quads 12,13,14 L5, but not in 11L5 Sector 1-2 Mirko Pojer: Urgent to remove cable trays on QBQI.31R1; QBBI.B31R1; QBBI.A31R1; QQBI.29R1; QBQI.29R1; QBQI.34R1 LSS 3 weeks 11.07 – 04.08 re- and new installation, but at least 2 days out as 28.07 – whole day training and August 1st with sources Drawings, ECR… Patrick Fassnacht: the BLMs in the region of the ALFA RP at point 1 (A7L(R)1 and B7L(R)1). We have moved one of the stations by 4m… Stefano Redaelli : ”I would prefer if there was a visual inspection rather than relying on the database values, unless the BLM team is sure that these monitors were not moved. …not dismount the monitors in baking locations of A4R5 vacuum sub sector?

AccTest framework 1. The measurement follows to DCUM ( team in tunnel) BLMEI.C5R6 BLMEI.05R6.B2I10_MKD.M5R6.B2 16861.260184 BLMES.C5R6 BLMES.05R6.B2I10_MKD.M5R6.B2 BLMQI.B5R6 BLMQI.05R6.B2I30_MQY 16864.93 BLMQI.C5R6 BLMQI.05R6.B1E10_MQY 16868.898 BLMQI.D5R6 BLMQI.05R6.B2I20_MQY 16869.502 BLMQI.E5R6 BLMQI.05R6.B1E20_MQY 16870.702 BLMQI.F5R6 BLMQI.05R6.B2I10_MQY 16872.529 BLMQI.G5R6 BLMQI.05R6.B1E30_MQY 16875.684 BLMEI.8R6 BLMEI.05R6.B1E10_DFBLB 16932.407 BLMQI.A8R6 BLMQI.08R6.B2I30_MQML 16961.327 2. AccTest framework Data: expert name, DCUM, time, signal 3. AccTest framework Storage: measurement DB -> Logging DB, no link to MTF-Layout 4. AccTest framework Picture : as in timber, but no online analysis (noise, signal, stdev) 5. Possibility to get “automatically” ( except team in tunnel) measurements!

RSM- 2014 Arc and LSS: Sector 6-7 : 04.08 – 15.08  the load the sources to chariots at August 1st  + Internal transport type A for transfer to P6 and P7 + to lower of chariots to parking place at P6 and P7 the Safety manual, training and availability@Point of tractors, radiation training to controlled area Another jobs…

Sector 6-7 BLMs (including LICs)  from 4R6(MSD) to 4L7 (TCSM) : ARC and LSS Not done (LSS) HV dividers CFC cards Not done Check of the installation, the “space” location and pictures of monitors, mini-racks, B%boxes Database (Layout, MTF, LSA)   for ARC and LSS synchronized and uploading to the electronic Not done (Greg) Labels of monitors, HV divider, B%boxes ( BJLAP – BJLHT for LIC for example) Bar code reader Done Surface electronics  at P6 and P7 Done (Christos’s excel file) Measurement DB Ready for reparation ?