Report on RACM – POP & CICE components

Slides:



Advertisements
Similar presentations
GEMS Kick- off MPI -Hamburg CTM - IFS interfaces GEMS- GRG Review of meeting in January and more recent thoughts Johannes Flemming.
Advertisements

R4 Dynamically loading processes. Overview R4 is closely related to R3, much of what you have written for R3 applies to R4 In R3, we executed procedures.
1/1/ / faculty of Electrical Engineering eindhoven university of technology Introduction Part 3: Input/output and co-processors dr.ir. A.C. Verschueren.
CORE-II HYCOM Science application and test cases
CCSM Testing Status Tony Craig Lawrence Buja Wei Yu CCSM SEWG Meeting Feb 5, 2003.
Getting Started with Cadence Prepared by Ryan Johnson, 2002  Open Orcad Capture under Engineering Software  Under FILE, choose NEW, PROJECT  The following.
Departamento de Física
WRF-VIC: The Flux Coupling Approach L. Ruby Leung Pacific Northwest National Laboratory BioEarth Project Kickoff Meeting April 11-12, 2011 Pullman, WA.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks gLite Release Process Maria Alandes Pradillo.
CESM/RACM/RASM Update May 15, Since Nov, 2011 ccsm4_0_racm28:racm29:racm30 – vic parallelization – vic netcdf files – vic coupling mods and “273.15”
Ten Ways to Mess Up Your Financial Upgrade Maria BalluchMarch 25, 2014 How to Increase Conversion Success.
How to Multiply: Distributive x 62 x 60 x = 2790 Step 1: Multiply 45 by the expanded form of 62 (60+2). Step 2: Add together.
ROMS in Alaska Waters Kate Hedstrom, ARSC/UAF Enrique Curchitser, IMCS/Rutgers August, 2007.
ROMS as a Component of the Community Climate System Model (CCSM) Enrique Curchitser, IMCS/Rutgers Kate Hedstrom, ARSC/UAF Bill Large, Mariana Vertenstein,
Muon commissioning status and plans G.P. C. De Plano.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
NCEP ESMF GFS Global Spectral Forecast Model Weiyu Yang, Mike Young and Joe Sela ESMF Community Meeting MIT, Cambridge, MA July 21, 2005.
On the Road to a Sequential CCSM Robert Jacob, Argonne National Laboratory Including work by: Mariana Vertenstein (NCAR), Ray Loy (ANL), Tony Craig (NCAR)
An Overview of ROMS Code Kate Hedstrom, ARSC April 2007.
CCSM/RACM Update May CCSM Schedule April 1, 2010, CCSM4.0 Release June 15, 2010, CESM1.0 Release – adds ecosystem + glc (glimmer) + ? June 28.
Report on POP & CICE of RACM components Jaromir Jakacki, IO PAS.
Report on POP & CICE of RACM components Jaromir Jakacki, IO PAS Boulder, CO, 2010.
ARSC/IARC Report DOD/RACM Workshop, December Juanxiong He 1,2 Greg Newby 1 1. Arctic Region Supercomputing Center 2. International Arctic Research.
Slide 1 Running NEMO at ECMWF Slide 1 NEMO under Perforce at ECMWF Kristian S. Mogensen Last revised:
Guards1. 2 Let’s test this function. Main> maxi Here is a trace of the function: n m maxi 3 2 Guards or conditions are used to express various cases.
Practice Array Web Process By Shengli Hu. Wads Practice 1 review wads everyday morning. mail assignment everyday. keep the status of wads reflect.
CWB Midterm Review 2011 Forecast Applications Branch NOAA ESRL/GSD.
Software Design– Unit Testing SIMPLE PRIMER ON Junit Junit is a free simple library that is added to Eclipse to all automated unit tests. The first step,
16-1 PC-HYSPLIT WORKSHOP Workshop Agenda Introduction to HYSPLIT Introduction.ppt Model Overview Model_Overview.ppt Meteorological Data Meteorological_Data.ppt.
HOW TO FIX MSVCR100. DLL IS MISSING ERROR? missing-error.
1 14th June 2012 CPass0/CPass1 status and development.
Coupling ROMS and CSIM in the Okhotsk Sea Rebecca Zanzig University of Washington November 7, 2006.
WP11 Model performance assessment and initial fields for scenarios. Objectives and deliverables To determine, how well biogeochemical ocean general circulation.
How To Troubleshoot Internet Connection In HP Computer?
Towards development of a Regional Arctic Climate System Model ---
Development Environment
How is Clicklearn licensed
A Brief Introduction to CRU, GHCN, NCEP2, CAM3.5
Experimental tag for cesm1.5
or Call Toll-Free for help.
fields of possible improvement
Eclipse Navigation & Usage.
WinCC-OA Upgrades in LHCb.
Contact us to fix AVG Error Code 0xe001f921
Regional and Global Ramifications of Boundary Current Upwelling
Call to Fix QuickBooks has Stopped Working
Some Important Techniques For Regression Testing That You Must Know.
Call to Fix Canon Pixma MX340 printer Error 5200
iTunes ERROR
How To Solve Software Failure Issues By I FIX PC
Call to Fix Dell Printer Error Code
Quick Solution Dial Now 1(800) QuickBooks Payroll Support
gWRF Workflow and Input Data Requirements
Performance of the VIC land surface model in coupled simulations
ARSC & IARC Report Juanxiong He1,2 Greg Newby1
Initial Implementation of VIC within CCSM System through CPL7
COAPS, Florida State University
Sub-seasonal prediction at ECMWF
Adding Decimals.
HOW TO FIX AOL 5 ERROR CODE AOL ERROR 5 MAY APPEAR DURING THE INSTALLATION OF THE PROGRAM OR SOFTWARE RELATED TO AOL INSTANT MESSENGER IS RUNNING DURING.
Unit 2: Editing and Review Tools
Aerosol Production in Lead-protected and Flibe-protected Chambers
CPL7/CCSM4 (J.Jakacki/G.Jost)
POPCICE - numerical experiments.
L8-2 Notes: Adding Integers
Current status Minjung Kim
Interesting Integers!.
Learning Intention I will learn about the standard algorithm for input validation.
Validation Activities in the ESS What you will hear today…
Adding integers without number line 2 digit.
Presentation transcript:

Report on RACM – POP & CICE components Jaromir Jakacki IO PAS Sopot, Poland

Main problems which have been appeared and some of them were solved bug in pop related to use of the, regional mask that impacted salinty flux was diagnosed and fixed. After that models was tested and submitted in new release (racm01). Coupling time was fixed. In CCSM4 version was only option for 1 day for ocean model. Currently it works for any time bigger then 900 seconds. Should be submitted in next release. Main end extended grids was created for future development.

Negative ice area appered. The winds was dumped (for one year) Negative ice area appered. The winds was dumped (for one year). Before dumping winds it worked only for 15 days. After dumping winds the model stopped after about 30 days. In module ocn_comp_mct.F90 main routines to hold extended grid were added. Also, option 'cpl_grid_file' in pop2_in was added and the model was tested with normal and extended grid. In extended grid there are zeros everywhere (Tony) New release (02 and 03) was prepared (Tony) and tested. It consist of new datasets (for datm model). Works fine, but only 9 days. Models fail because of kinetic energy (> 100, POP). It suggests that some technical and parametrization problems has been fixed (this error is better then negative ice area).

Examples of results (based on racm01 release) – ocean and ice (respectively)

To do: Keep working on coupled ocean-ice model with datm and slnd – try to make spin up (if it will be possible) to have ready to run restart files Add restoring mask around domain to keep climatological at that places Check problems with kinetic energy (units, rearranging data … - can be a lot) Maybe wind should be dumped again in new data sets

To do (cont): Preparing extended mask Monthly data of temp and salinity (interpolated to extended grid) Creating mask for merging data from both domains Add some code to ocn_comp_mct.F90 to read, distribute, interpolate in time climatological data for extended domain. Some code merging domains