Beam-Based Alignment Results

Slides:



Advertisements
Similar presentations
Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Advertisements

Tests of DFS and WFS at ATF2 Andrea Latina (CERN), Jochem Snuverink (RHUL), Nuria Fuster (IFIC) 18 th ATF2 Project Meeting – Feb – LAPP, Annecy.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
Ultra Low Vertical Emittance at the Australian Light Source Mark Boland on behalf of Rohan Dowd 1.
SCU Measurements at LBNL
Beam-Based Alignment with New Parameters Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
1 Heinz-Dieter Nuhn 1 Undulator Commissioning August 2009 FEL2009 Undulator Commissioning, Alignment and Performance Heinz-Dieter.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
Alignment and Beam Stability
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
Corrections for multi-pass eRHIC lattice with large chromaticity Chuyu Liu ERL workshop 2015 June 7, 2015.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
ILC Main Linac Beam Dynamics Review K. Kubo.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Effects of Accelerating Cavities on On-Line Dispersion Free Steering in the Main Linac of CLIC Effects of Accelerating Cavities on On-Line Dispersion Free.
From Beam Dynamics K. Kubo
Overview Preparatory work at the MML BBA to define the reference orbit
LCLS Commissioning & Operations High Level Software
Beam Commissioning Adam Bartnik.
ILC BDS Alignment, Tuning and Feedback Studies
Orbit Response Matrix Analysis
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ILC Z-pole Calibration Runs Main Linac performance
New algorithms for tuning the CLIC beam delivery system
Adaptive Alignment & Ground Motion
Magnetic Measurements For The LCLS Undulator System
Coupling Correction at the Australian Synchrotron
Linear and Nonlinear Lattice Correction Via Betatron Phase
Alternate Lattice for LCLS-II LTU Y
LCLS Commissioning & Operations High Level Software
Commissioning Status of the LCLS Accelerator and Undulator Systems
Phase II Commissioning
Linac/BC1 Commissioning P
Overview Pre-Beam Checkouts
High Level Physics Applications for LCLS Commissioning
Optics Measurements in the PSB
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
Linac Diagnostics Commissioning Experience
LCLS Undulator System Status and Schedule
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
BEAM REALISTIC ERROR ORBIT IMPACT ON SASE PERFORMANCE
Linear beam dynamics simulations for XFEL beam distribution system
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Beam-Based Alignment Results Henrik Loos, for the LCLS Commissioning Team

Undulator Trajectory Requirements Beam through undulator rms 2 μm per gain length Undulator with 33 segments total 100 m Not possible with conventional alignment Use beam based alignment using set of different energies RF BPM resolution < 1 μm

Undulator Configuration In/Out Scan Beam Undulator Quad RF BPM Girder BFW Corr Girder Movers K Undulator, Quad, BPM, BFW move with girder Beam Finder Wire (BFW) retractable Horizontal translation of undulator Complete retract (80 mm) Undulator K adjustment (± 5 mm)

Beam Based Alignment Principle BPM offsets unknown Magnetic fields (earth, quad kicks, etc.) unknown Correct field integrals with quad offsets or correctors for dispersion free trajectory at BPM position Trajectory between BPMs remains unknown Measure trajectory at different energies to extrapolate to straight line at infinite energy Fixed undulator quad fields BPM position is BPM offset at infinite energy

BBA Measurement Schematic Δq1 Δq2 Δq3 E2 x,x’ E1 Δy0 Δy1 Δy2 Δy3 Δy4 BPM Offsets Δbi Quad Offsets Δqi E1 < E2

BBA Procedure Model beam position (yj) at BPMs as function of initial launch at 1st BPM (xi), quad offsets (Δqi), BPM offsets (Δbi) y = [Rx Rq Rb] [x’ Δq’ Δb’]’ Rxj = Rj1,1:2 Rqj = [R1,jend - R1jbeg … Ri<j,jend - Ri<j,j 0 … 0]11 Rb = -I Fit solution for y arbitrary to adding linear function to quad and BPM offsets Add constraint equations for quad or BPM offsets 0 = Σi Δqi and Σi zi Δqi for linear quad offset constraint 0 = Δqi for minimum quad offset constraint

BBA Implementation Setup accelerator for one energy Calculate response matrix for this energy Measure N orbits at this energy and average Repeat for all energies Generate final matrix with separate launch parameters for each energy and selected constraints Fit quad and BPM offsets and implement Repeat BBA procedure

Simulation Fit Lin. Quad BBA Simulation Simulation Orbits Simulation Fit Lin. Quad

BBA Results: 1st Run First test: Energy range only 10 – 13.64 GeV 50 orbits each, averaged BPMs not well calibrated Large oscillation in fit of quad offset, 1mm error bar Assume BPM offset worse than quad offset Apply instead constraint for minimal quad offset Initial position rms 300 μm Measured Orbit

BBA Results: 1st Run Fit with Linear Quad Constraint Fit with Min. Quad Constraint Applied this to BPM offsets

BBA Results: 2nd Run Energy range now 7 – 13.64 GeV Still large ~1 mm oscillation on quad offset fit Apply relaxed minimum quad constraint, 100 μm error bar Orbits very similar after correction Position rms ~50 μm after Measured Orbit

Measured Orbit after Correction BBA Results: 2nd Run Fit with Min Quad Scale 20 Measured Orbit after Correction

Fit with Linear Quad Constraint BBA Results: 3rd Run Measured Orbit 4.3 – 13.64 GeV Fit with Linear Quad Constraint

BBA Results: 3rd Run Measured Orbit 4th Iteration Fit with Linear Quad Constraint Position rms 2 – 10 μm Offset Error Bar 10 μm

BBA Results: Best Orbit Carefully calibrated BPMs Energy range 4.3 – 13.64 GeV 4 different energies Undulator launch feedback on Average position rms 1 – 2 μm Betatron jitter ~20 μm

BBA Results: Girder Bump Test 58um bump @ 13.7 GeV & -58um BPM offset -48um bump @ 13.7 GeV BBA procedure finds both quad offsets and BPM offsets

Typical BBA After Several Months Observe mostly changes in BPM offsets ~ 10 – 30um Some quad & BPM offsets in end region of undulator from incremental orbit corrections (retracting undulators, changing of taper)

Quad Alignment Measurement Measure quadrupole offset from beam axis Vary quad magnetic field and fit offset to trajectory kick Verifies earth field compensation from BBA Earth’s field effect 8 mm rms undulators installed (with m-metal) Z (m) P. Emma

BBA User Interface Fit Options Simulation Measurement Corrections

Fast Linac Energy Change User interface to run an automated script Block/unblock beam Activate saved klystron configuration Trim saved magnet configuration Toggles feedbacks Enables one BBA run in 10 - 15min (at best), ~2 – 4 h (worst)

Orbit effects from undulator motion BBA & Undulator Taper Orbit effects from undulator motion No earth field shielding with retracted undulator Undulator translation (~80 mm) shifts entire girder by ~10 - 100 um (quad & BPM) Undulator field integral depends on taper Goal Straight trajectory for all undulator translations Strategy Do BBA at design taper, correct quad position Compensate field integral change for different taper with corrector coil Compensate girder shift for retracted undulator with corrector coils and BPM offset

Undulator Field Integral Measurement Apply 1st field integral to corrector coil

Summary Achieved To Do BBA procedure successfully implemented Converges to ~1 μm trajectory rms Important to have full energy range Errors on fitted quad offsets decreased from 1 mm to 10 μm with increasing energy range Fast energy switching 15 min BBA possible Complemented by measurement of quad offsets by varying quad strength To Do Fully automate energy change (Interface to energy management, orbit feedback in linac) Study BBA at low charge (< 250 pC) Implement orbit correction from undulator translation Compare girder position from BBA with alignment diagnostic system (ADS) Monitor and study BPM offset drifts