Tuesday 9th November 10:02 Fill beams dumped

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Saturday :12 Stable beams fill 3351 Initial luminosity
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Lost at 12:05 to power converter (RTQX2.R1) problem
Wed :40 Lost S78 - QPS controller.
LHC (SSC) Byung Yunn CASA.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Saturday – Morning 7:36 beams dumped
Yesterday morning Held 1647 for a while – SPS kicker problem
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Injection Studies: 50 ns ABT/BTP.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday morning / afternoon
Saturday 26 November 2011.
Tuesday
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Tuesday 9th November 10:02 Fill1483 - beams dumped Offset on the BPMs readings around IR3. Heating problem in the building were the BPM crates of IR3 are. The cooling system of SR3 was under maintenance and this inhibited the alarms going to TI (to prevent false alarms) In the meantime a real alarm "defaut gel" appeared and cut the ventilation of the building. The site manager switched on the system, the temperature went back to normal and the BPMs readings as well.

Injection LHCION2 was giving big longitudinal and transverse emittances, ~1.8-2 and 3-4 respectively. Tuned by SPS beam presence flag threshold tested by reducing intensity of B1 pilot

Injection Injected 4 bunches of ions and checked TL trajectory and losses and injection oscillations B1: Did steering in vertical plane with one corrector and saved new trajectory into the dataset catalog. B2: had first problems to get BPM acquisition in the ring, changed the reference and steered in the horizontal plane with one corrector, new trajectory saved in the catalog. Losses in the TL: max losses 1.6 mGy --> OK, no TCDI adjustments needed Losses in IP2 and IP8 look fine. No IQC latches seen. Copied settings from LHCION2 to LHCION1.

Tuesday evening 17:30 Inject for test ramp 4 x 500ns New collision beam process tested without problems Crossing angles, separation bumps, lumi scan knobs and orbit adjustments Alice’s crossing angle from +110 to -140 microrad IP6 interlock thresholds crate B tested will change BPMSB.B4L6.B2 horizontal, actual reading 1.2 mm B2 dumped when moving from 1.5 to 1 mm --> OK will change BPMSB.B4R6.B1 horizontal, actual reading 2.2 mm B2 dumped when moving from 2.5 to 2 mm --> OK

Tuesday eveing Bit of trouble injection (tunes, chromaticity) 22:50 Stable beams, fill 1485 500ns 17 bunches 16 colliding pairs/IP Initial luminosity around 3.5 x 1024 cm-2s-1

BCT after 4 h

Bunch length

Beam sizes

Today MD in PS until 14:00 Will keep this fill as long as reasonable PS RF cavity (80 MHz) will need retuning to go back to ions Fill for 69 bunches/ring, 66 bunch encounters/revolution for ALICE and 65 for CMS and ATLAS.