Oral statements or discussion during the pre-bid meeting today will not be binding, nor will it change or affect the terms or conditions within the Plans.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Historically Underutilized Business Program Texas Department of Insurance Special Deputy Receiver Program January 2008.
Welcome to Durham County’s M/WBE Program Review M/WBE Program Review.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Doing Business with Department of Enterprise Services for General Contractors and Subcontractors June 19, 2013.
2009 CDBG/CHIP Recipients’ Workshop CDBG LABOR STANDARDS.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
1 Doing Business with the University of North Texas System September 2015.
Washington Suburban Sanitary Commission Small, Local and Minority Business Enterprise (SLMBE) Program.
Advertising Agency Services Request for Proposal Pre-Proposal Conference February 22, 2012 Chad Johnson Strategic Sourcing Analyst.
Courier Services Request for Proposal Pre-Proposal Conference February 17, 2011 Chad Johnson Department of Administration.
Indiana State Personnel Dept. CDL/Non-CDL Controlled Substance and Alcohol Testing Pre-Proposal Conference September 24, 2012 Greg Moorman IDOA Strategic.
2013 CDBG Recipients' Workshop CDBG Labor Standards.
Office of Procurement Services.  Vendor Application Website: 
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
COMPULSORY BRIEFING SESSION Enterprise Wireless Solution (Wi-Fi) RAF /2015/00022 Date: 18 January 2016 Time: 11:00.
External Grantee Evaluation Services RFP Pre-Proposal Conference March 17, 2011 Kyle McClurg, IDOA Strategic Sourcing Analyst.
Submitting a Responsive Response Packet & Bid Waste Water and Water Treatment Chemicals ITB# CWCH.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
October 2, 2015 REQUEST FOR PROPOSAL (RFP) 7012 ADMINISTRATIVE SERVICES ORGANIZATION COUNTY OF SAN DIEGO, HEALTH AND HUMAN SERVICES AGENCY PRE-PROPOSAL.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
Vera Konstantinova, Procurement Contracting Officer July 16, 2015 REQUEST FOR PROPOSAL (RFP) 6922 IN-HOME OUTREACH TEAMS AND ASSISTED OUTPATIENT TREATMENT.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Disadvantaged Business Enterprise (DBE) Each Submitter’s Responsibility for Outreach Efforts.
Historically Underutilized Business (HUB) Requirements.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Procurement & Strategic Sourcing
Contract Compliance Training
Procurement & Strategic Sourcing
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
Metra Construction Contractor Prevailing Wage Workshop
Miscellaneous Property Insurance
RFP 12-58, Data Warehouse Pre-Proposal Conference
Submitting a Responsive Proposal
Procurement & Strategic Sourcing
RFP Health Education center furnishings
Introductions and aims of today’s briefing
Pre-Proposal Conference
Disadvantaged Business Enterprise (DBE) Each Bidder’s (or Proposer’s) Responsibility for Outreach Efforts.
Construction Oversight
Award Management Services
RFP EMISSIONS SOURCE VALIDATION
Procurement & Strategic Sourcing Charter Bus Transportation Services
Historically Underutilized Business (HUB) Requirements
TRAVEL SERVICES Request for Proposal
City of Norfolk Office of the Purchasing Agent
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
Managing Construction Projects
Contract Compliance Training
Procurement & Strategic Sourcing
State Aid Construction
Washington Metropolitan Area Transit Authority (WMATA)
Request for Proposal and Specifications for
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Introduction Sign attendance sheet Owner: Jeff Ray – Project Engineer
Request for Proposal and Specifications for
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
MANDATORY PRE-BID MEETING
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
Fasset Briefing Session
ENTERGY SERVICES, INC. February 23, 2006
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
State Aid Construction
Pre-Submittal Meeting As Needed Environmental Services RFQ
Diversity management system (DMS)
Oral Statements Oral statements or discussions during this Pre-Submittal Conference will not be binding, nor will they change or affect the RFQ or the.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Oral statements or discussion during the pre-bid meeting today will not be binding, nor will it change or affect the terms or conditions within the Plans and Specifications of these Projects.  Changes, if any, will be addressed in writing only via an Addendum.

SMWVB Program Aspirational Goal Industry SMWVB Goal Heavy Civil/Utility Construction 20%

Accepted SMWVB Certifications Minority Business Enterprise (MBE) (Includes AABE; ABE; HABE and NABE) Small Business Enterprise (SBE) Woman-owned Business Enterprise (WBE) Veteran-owned Business Enterprise (Tracked)

Accepted SMWVB Certification Agency South Central Texas Regional Certification Agency Texas Historically Underutilized Business (HUB) Program Minimum Qualifications for SMWVB recognition: **SBE-Certified (even MBEs and WBEs)** **Local office or local equipment yard**

Good Faith Effort Plan (GFEP) FAQs Q: Is the 20% SMWVB goal mandatory? A: No, but we ask primes to do their best with good faith outreach efforts. If the goal is not met, proof of outreach efforts is required with the bid. Q: What if I am having trouble finding SMWVB subcontractors? A: Please email the SMWVB Program Specialist with the scopes of work you are seeking. You will receive lists of local SMWVB-certified firms to contact. Q: What if my business is SMWB-certified? Do I need to find SMWVB subs? A: If your firm is SMWB-certified, you will most likely meet the goal. However, the GFEP is a required document, and a good faith outreach effort is still necessary. Q: What if I have questions about the GFEP? A: Please contact the SMWVB Program Specialist at 210-233-2950, or at Susan.Rodriguez@saws.org. GFEP questions can be asked at any time before deadline.

Subcontractor Payment & Utilization Reporting (S.P.U.R.) System Portal

Contract Requirements Prevailing Wage Rate and Labor Standards – Section 2.10 of the General Conditions Certified payroll to be submitted on weekly basis Wage decisions are included within the specifications Contractors to utilize LCP Tracker Site visits are random and unannounced Interviews will be Conducted and will be private & confidential Payroll records are subject to review All apprenticeship programs will need to be approved by Department of Labor prior to starting Contractors are responsible for sub-contractor payroll Late payrolls delay contractor payments from SAWS

Contract Requirements Insurance– Section 5.7 of the General Conditions Special requirements on insurance are: Installation Floater is required Compliant prior to executing the contract Will ask for insurance prior to Board award to expedite execution of the contract Selected contractor must be compliant with all other contracts in order for SAWS to award the contract.

Bid Packet Preparation Utilize the Bid Packet Checklist within the specifications SAWS is requesting that the company information packet, schedule statement, W-9, detailed baseline schedule, and Statement of Bidder’s Experience be completed and included by all bidders Double check all mathematical calculations and verify all extensions References and contact information must be verified prior to submitting bid(s) Addendums are now acknowledged on the Bid Proposals Check our website regularly for the addendum posting. It is possible to have multiple addendums during the time frame in addition to the scheduled final addendum.

Notification of Selected Firm IFB Schedule Questions Due June 29, 2018 By 2:00 p.m. CDT Answers Posted July 06, 2018 10:00 a.m. CDT Bids Due July 13, 2018 Until 10:00 a.m. CDT Notification of Selected Firm July 2018 SAWS Board Award August 2018

Key Reminders Questions regarding the SMWVB Program, the Good Faith Effort Plan or any DBE forms, may be sent directly to SAWS Program Specialist, Susan Rodriguez up until the submission deadline. All other questions should be sent in writing to the corresponding Contract Administrator by email or fax. Please identify the project by its associated solicitation number. Late bids will not be accepted and will be returned unopened. If mailing bids, ensure that sufficient time is allowed for the package to reach SAWS. If bids will be delivered in person to SAWS, Respondents should allow sufficient travel time, as well as time to check in at the guard station.

Additional Reminders Please register through SAWS Vendor Registration Program on the SAWS website at www.saws.org to ensure access to the latest information. To receive updates on specific projects, registered vendors must ‘Subscribe’ to the project by selecting the project, and clicking ‘Subscribe’ under the Notify Me box.

Contract Background (SAWS Project Engineer) Project Overview, including: Open cut construction of approximately 9,910 linear feet (LF) of existing 2–inch and 3-inch water main to be upsized to 8-inch water main. Project is required due to the undersized pipelines and number of main breaks. Contractor is to become familiar with the plans, specifications and the project site.

Project Map

Project Details Minimum depth for the waterline installation 5-feet in unpaved areas. Contractor to refer to Special Provisions To Technical Specifications for fire hydrant and gate valve operations Boring is required for all long services 10-inches of HMAC Type B required for all parkway backfill areas Cement stabilized backfill (6-inches) required in all areas less than four (4) feet from edge of pavement Mailbox replacements shall be accordance to TxDOT standards Coordination with US Post Office Coordination with Bexar County

Contract Requirements (SAWS Project Engineer) Supplemental Conditions Contractor shall perform the work with its own organization on at least 40% of the total original contract price. Liquidated damages will be assessed as follows for final completion extending beyond contract time: Any days tallied after 42 days will be assessed as a Tier 6 rate. Detailed baseline schedule required as part of bid – anticipated NTP is 9/7/18

Contract Background Special Conditions Final completion of work shall be achieved in 210 calendar days. Contractor shall ensure proper notification is given to stakeholders and the public within the project limits Contractor shall abide by all permits and the identified requirements. Contractor shall provide Sequence of Work Plan submittal prior to construction start. Water pipeline division valves shall remain closed at all times.

Contract Background Traffic Control Plan submittal and approval by stakeholders, is the Contractor’s responsibility. Detailed baseline construction schedule shall be submitted as part of the bid Submittals can be submitted as soon as receiving notification of contract award after CPMS training (if necessary) has been completed

Contract Background (SAWS Inspector) Prior to commencing work, contractor must submit and receive approval of the following: Traffic control plan Construction Schedule Pre-site video Lease agreement There will be one pre-construction meeting. Remaining submittals will be required Contractor must submit a Work Progress Schedule within 10 days of NTP and monthly thereafter Contractor will be responsible for obtaining additional ROEs

External Agency Permit Requirements (CoSA, TXDOT, etc.) Contract Background External Agency Permit Requirements (CoSA, TXDOT, etc.) Contractor to follow requirements identified in Bexar County permits Changes in field that are cited by a Bexar County Inspector will require concurrence and approval from the SAWS Inspector first. Tree Permit and Storm Water Pollution Prevention Plan will be reviewed and approved prior to construction; however, contractor is responsible to obtain (pull) these permits Contractor shall be responsible to coordinate and obtain Bexar County Right-of-Way Permits If contractor wants to work weekends, notification is required 48 hrs. in advance to SAWS Construction Inspections. Requests should be send to constworkreq@saws.org

Contract Background All RFI’s, RFP’s, submittals, and any other items related to construction must be uploaded and processed via CPMS No work can be performed by the contractor unless the cost for that line item is on the contract. All traffic control plans must be submitted and approved by engineer of record, permitting agencies and SAWS. Change orders, if any, will be based on negotiated prices not in the bid proposal Negotiated using RS Means

Contact Information Contact Name Title Telephone Number Email address Janie Powell Contract Administrator 210-233-2443 Janie.Powell@saws.org Susan Rodriguez SMWVB Program Specialist 210-233-2950 Susan.Rodriguez@saws.org Contractors should not contact the SAWS project engineer, the consultants for this project or any other SAWS staff except those stated above up until Board award.