Terminologies on On-site and Off-site Disasters Management

Slides:



Advertisements
Similar presentations
Dr Rakesh Dubey Director Disaster Management Institute Bhopal
Advertisements

Risk Analysis For: ES-317Y and ES Plant Design Project at UWO By: R.A. Hawrelak, P.Eng. - Lecturer Dept of Chem & Biochem Eng’g Dow Chemical –
Development of Tools for Risk Assessment and Risk Communication for Hydrogen Applications By Angunn Engebø and Espen Funnemark, DNV ICHS, Pisa 09. September.
Preliminary Hazard Analysis
MAJOR ACCIDENT HAZARD CONTROL ACTIVITIES in TAMIL NADU
FIRES, EXPLOSIONS, AND COMBUSTIBLE DUST HAZARDS
Disasters & Disaster Management By GS Saini, Director National Civil Defence College, Nagpur.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
1 TONGJI UNIVERSITY Institute for Hydrogen Energy Technologies Study on the Harm Effect of Liquid Hydrogen Release by Consequence Modeling Institute for.
Mike Hightower and Anay Luketa-Hanlin Sandia National Laboratories Albuquerque, New Mexico Sandia is a multiprogram laboratory operated by Sandia Corporation,
HISTORY. History of Emergency Management Within the DOE System The early years In the 1970s, DOE’s focus was on security and energy contingency planning.
GUIDING PRINCIPLES OF CHEMICAL DISASTER MANAGEMENT LEGAL: Indian Acts/Rules/Guidelines TECHNICAL: Risk Assessment IS:15656 (HIRA)/HSE (UK)/CCPS Guidelines/TNO,
1 Chemical Hazards. 2 Purpose of Lectures on Chemical Safety To understand the hazardous properties of chemicals prior to their use. To transport / handle.
HAZWOPER Awareness Level. Responsibilities v First responders must be able to recognize a hazardous substance release 1a.
Dr Rakesh Dubey Director Disaster Management Institute Bhopal Hazards Identification and Risk Assessment And On-site and off-site.
12 April 2007Senior Design Lecture 3 – SP07 Senior Design Guest Lecture 3 Process Safety Applications For Design Engineers CHEN 4470 Spring 2007.
“ Hard work and concern for the society is the key to success ” - O P Jindal On-site and Off-site Emergency Plans Based on Integral Risk Management – Key.
page 0 Prepared by Associate Prof. Dr. Mohamad Wijayanuddin Ali Chemical Engineering Department Universiti Teknologi Malaysia.
Theories in Environmental Risk Assessment
Application of Consequence Analysis and Risk Assessment in ERDMP
Pipeline Qra Seminar Title slide Title slide.
Presentation on the iDRM activities in Andhra Pradesh By G.Bala Kishore M.E., Director of Factories Andhra Pradesh, Hyderabad.
Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency management Plans Dr. R. Dubey - DMI.
EuropeAid/131555/C/SER/RS Safety Procedures in the Chemical Industry Ernst SIMON, Styrian Regional Government, Austria Belgrade, December 2013.
Hazards Analysis. The Next 55 Minutes... l Overview of Hazards Analysis l Scenarios for EPCRA and RMP l Resources.
MAJOR ACCIDENT HAZARD IN INDIA WITH GLOBAL PERSPECTIVES
Process Safety Incidents- Discussion of Hub Oil 1999 Accident
Ert 312 LECTURE 4 OSHA & DOSH.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Engineering Risk Assessments and Risk Communication Sarah Arulanandam, Hazard and Risk Group RWDI West Inc. DISCLOSURE OF MATERIAL ENVIRONMENTAL EXPOSURES:
Introduction to Risk Management C7 Slide 1. The Concept of Safety  ‘Safety’ refers to the reduction of risk to a tolerable level  Risk = Likelihood.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
1 Emergency Management and Risk Analysis for Hazardous Materials Transport Shashi Nambisan Professor of Civil Engineering Dept of Civil & Environmental.
HONR 297 Environmental Models
Explosion An explosion is a rapid expansion of gases resulting in a rapid moving pressure or shock wave. The expansion can be mechanical or it can be.
Risk management and disaster preparedness
REGULATORY FRAMEWORK ON CHEMICAL AND INDUSTRIAL DISASTER MANAGEMENT IN INDIA -AN OVERVIEW By G.Bala Kishore M.E., Director of Factories Government of Andhra.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
SRA-E-06: Innovation and Technical Progress – Benefit without risk? Ljubljana, 11 – 12 Sep 06 Land Use Planning in the Context of Seveso II establishments.
1 Emergency Preparedness Answer Key. 2 What types of emergencies could occur? List 3 categories of emergencies: Natural Hazardous Material Intentional.
Risk Assessment: A Practical Guide to Assessing Operational Risk
By: AL-Shammari, A O Zuluf GOSP-1. The offshore oil and gas industry This industry employs more than 500 people in a range of activities. Although there.
Salient Features of NDMA Guidelines Medical Preparedness & Mass Casualty Management Surgeon Rear Admiral VK Singh VSM (Retd.) Director, IIHMR, New Delhi.
Yokohama National University
Environmental Safeguards
2. Hazards Survey Suitable for identifying hazards for equipment design, layout, storage etc. Can be as simple as survey of inventory/stock of hazardous.
What you will learn in this session
Risk Assessments.
CONTROL OF HAZARDOUS ENERGIES (LOCKOUT / TAGOUT)
Occupational Radiation Protection during High Exposure Operations
Gasunie is one of the biggest gas infrastructure companies in Europe
BEST PRACTICES IN PROCESS SAFETY
Risk Engineer’s Energy Forum (REEF) July 27, 2016 David Black
Hazards in process Industry
TOXIC RELEASE & DISPERSION MODELS LECTURE 5.
Off-site Emergency Management Planning
HAZWOPER Operations Level.
Dr. Asit K Patra Disaster Management Institute Bhopal
Environmental Risk Assessment
Quantitative Risk Assessment
An Overview of Prevention & Management of Chemical Accidents in India
EPCRA: Emergency Planning and Community Right to Know Act
RISK ANALYSIS Resource Documents
Risk Management and Mitigation
M. Vanuzzo, M. Carcassi. Università di Pisa
European Commission, DG Environment Air & Industrial Emissions Unit
European Commission, DG Environment Air & Industrial Emissions Unit
eMARS 2nd Meeting of Competent Authorities SEVESO Expert Group
BHOPAL Industrial Disaster Management Cycle: OECD 2004.
Pipeline Incident.
Presentation transcript:

Terminologies on On-site and Off-site Disasters Management Dr. Asit K Patra Disaster Management Institute Bhopal

Terminology 1. Hazard: A chemical or physical condition that has the potential for causing damage to people, property and the environment. Example: Chlorine storage in Water treatment Plant LPG storage in Bottling plant Pressurised pipeline carrying Natural Gas 2. Risk: A measure of human injury/economic loss in terms of both the incident likelihood and the magnitude of loss or injury Relation between Hazard and Risk

Terminology 3. Risk Analysis A Quantitative or qualitative estimate of risk. 4. Risk Assessment Process of utilising Risk Analysis results with respect to a reference. 5. Disaster/Emergency Serious disruption of life, injury/death Affected large number of people and area Mobilisation of resources in case of those necessary during normal operation.

Terminology 6. On-site and Off-site On-site: Consequences are confined within the plant premises Off-site: Consequences crosses the plant boundary. On-site Planning: As per Schedule 11 of MS&IHC Rules Off-site Planning: As per Schedule 12 of MS&IHC Rules

Accident Outcomes (i) Fire: Pool, Jet, Flash, Fireball (ii) Explosion : BLEVE, VCE, Dust Explosion (iii) Release of Toxic gas/vapour

Parameters to study Consequences of Accidental Release Scenarios (A) Fire : Thermal Radiation (Various damage levels) (B) Explosion : Overpressure (Various damage levels) (C) Toxic Release : Concentration (Various damage levels)

BLEVE

AN INDUSTRY AFTER VCE

POOL-FIRE

JET- FIRE

Relevant Acts and Rules and Recent Developments Factories Act, 1948 as amended in 1987 MS&IHC Rules, 1989 as amended in 2000 The PLI Act, 1991 and amended rules 1993 Chemical Accidents (Emergency Preparedness, Planning and Response) Rules, 1996 Disaster Management Act, 2005 EIA Notifications, 2006 NDMA Guidelines on Chemical (Industrial) Disaster Management 2007 NAP-CIDM 2010

For Further Information, Please contact: asitkpatro@gmail.com Thanks