Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Until Sat 3:30: Stable beams.  Stopped by collimator temperature interlock. Sat 7:00 – Sun 8:30: Cryo stop IR4 and recovery.  PLC problem due to SEU.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Network/Controls issue 15 September h00 – 9h30
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Wednesday 21 March 2012.
Luminosity lifetime – fill 2932
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Yesterday’s morning’s controls issues
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
LHC Morning Meeting - G. Arduini
Tuesday morning 08:30-09:00 Squeeze with probe.
Summary week 18 Intensity ramp up & production
Tue/Wed 12/ :00 Probe beam back again
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
LHC Morning Meeting - G. Arduini
Tuesday – Morning and Evening
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Wednesday 26 October 2011.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Presentation transcript:

Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57 feeding various important servers such as CS-CCR-LSA1, CS-CCR-CMW1 and CS-CCR-JAS5 was powered off then on. Enzo Genuardi was first called around 2:30am and came in at around 3:30am. He shutdown any machines on Service IP57 that he suspected were sending too much traffic or bad traffic. However this did not fix the problem. All that is known for the moment is that many machines on Service IP57 worked perfectly (e.g. DIAM1, JAS5) however many others could only send a few kilobytes before a TCP connection blocked (e.g. LSA1, DIAM2, Q4DS7). We have not seen a switch working partially before so it took some time to make the decision with Edoardo Martelli of IT/CS to power off / on the switch. Alastair Bland, BE/CO.

Thu 15/9 – Fri 16/9 In the shadow: temporary fix for the ADT gain/saturation was put in place before a proper setting up for high intensity could be done. The limit intensity is now at about 1.7e11 ppb. In case a roll back to the nominal 1.1e11 intensity is needed the RF low level piquet should be called. 10:00 Precycle and prepare for injection 11:30-13:00 LSS6 BPM interlock after modification of the BPM control card (aimed at fixing a long lasting problem on a bunch counting)

Thu 15/9 – Fri 16/9 13:00-14:00 Poor beam quality from the injectors due to a controls problem on a quadrupole of the PS to SPS transfer line 16:30 finally machine full. Ramping with ~1.38x1011 p/bunch. Vacuum acceptable.

Thu 15/9 – Fri 16/9 Beam dump due to trip of RQTF.A34.B2 during the squeeze to 1.5 m  likely due to tune feedback 19:56 STABLE BEAMS #2110. Initial luminosity >3.3x1033 cm-2s-1. 1.39x1011 p/bunch. Initial emittance ~2.3-2.4 um.

Beta* limits Beta* limits on new TCT functions (before physics) implemented S. Redaelli

Thu 15/9 – Fri 16/9

Thu 15/9 – Fri 16/9 02:15 trip of Sector 78 – due to sudden jump of U_MAG signal on nQPS DQAMGS.RB.A78.B9L8 (SEU?). End of physics #2110. 57 pb-1 in 6.5 h. 04:02 second trip of Sector 78 during pre-cycle  power-cycle DQAMGS.RB.A78.B9L8 M. Zerlauth

Injection issues (12 vs 144 bunches)

Plans and pending issues Injection checks and TCDI alignment verification (AM) LHCb Polarity switch Physics

Tue 13/9 – Wed 14/9

Tue 13/9 – Wed 14/9