on Priority Substances Strategic Coordination Group

Slides:



Advertisements
Similar presentations
Water.europa.eu Agenda item 7d Report on the quality assessment of the monitoring database Strategic Co-ordination Group November 2010 Madalina.
Advertisements

European Commission - DG Environment Unit D.2: Water & Marine 1 Pau-Plenary Session 14 may 2008 Pau-Plenary Session 14 may 2008 CMA developments and state.
International Office for Water B. Fribourg-Blanc, WG-E (4), Brussels, 14/10/2008 slide 1 Agenda Item 6.2 : (a) New data collection. Overview of the new.
1 State of Play Prioritisation of Substances By modelling Hazard & Exposure Klaus Daginnus Institute for Health & Consumer Protection Joint Research Centre,
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
Water.europa.eu Priority substances inventoryemissions, discharges and losses Priority substances inventory emissions, discharges and losses Working Group.
Water.europa.eu Draft mandate WGE Chemical Status WG E Priority Substances 8-9 October 2009 Jorge Rodriguez Romero Madalina David DG Environment, European.
DG Environment, Unit D.2 Marine Environment and Water Industry
Marine Strategy Framework Directive (MSFD)
JRC’s Follow-up work to improve GES assessment
Project Coordination Group (PCG) for the implementation of the MSFD
SW/MW guidance A surface/marine part which will focus on specific monitoring features related to surface waters and marine/coastal waters along the lines.
Daughter Groundwater Directive
Updating of the Reporting Guidance for the Floods Directive: Context
WFD update September 2009 Andrea NÁM
Environmental Quality Standards (EQS)
Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance
Chemical Monitoring mandate
Review of the WFD priority substances list
Draft mandate for an activity on emissions of priority substances
Bruxelles 17 october-2007 WG E Meeting
Report on WISE Art.8 and GIS issues
Chemical Monitoring Activity (CMA)
WGF Sub-group on Reporting Progress report
Paris (France), 22 September 2008
Proposed EQS Directive
European Commission DG ENV Unit C1 Water
Inventory preparation for priority substances
Progress report ATG Hymo 1 May – 20 October 2016
Progress report Working Group D - Reporting SCG meeting 5-6 November 2008 Unit D.2 Water and the Marine - WFD.
on Priority Substances Strategic Coordination Group
Chemical Monitoring Activity 9° Plenary Meeting Ghent
Preliminary feedback on analysis of Article V reports
Marine Strategy Framework Directive (MSFD)
Philippe Quevauviller
Chemical Monitoring Activity (CMA) ( )
Draft Work programme / revised mandate for WG F
Introduction- Link with WG E activity CMEP PLENARY MEETING-PRAGUE
- Priority Substances - Strategic Coordination Group
Priority substances Water Directors meeting Paris November 2008
Drafting group Mixing Zones
Draft Mandate and Proposed Approach for the Drafting Group on
SW/MW guidance A surface/marine part which will focus on specific monitoring features related to surface waters and marine/coastal waters along the lines.
Meeting of Water Directors Future Work Programme of the CIS
The Common Implementation Strategy – an overview
Green Paper on Adaptation and
8-c) Expert Group & River Basin Network on WFD & Agriculture
Water Framework Directive 2000/60/EC
Workshop on Biodiversity and Water
Work Programme of the CIS
Water Framework Directive 2000/60/EC
Strategic Coordination Group 2007 Reporting Guidance on Monitoring
Part I.
PRIORITY (HAZARDOUS) SUBSTANCES
WG E on Priority Substances
Common Implementation Strategy for the Water Framework Directive
Brussels 7 November 2007 SCG Meeting
Draft CIS work programme
Strategic Co-ordination Group May 2009
DG Environment, Unit D.2 Marine Environment and Water Industry
Quantitative Issues: Re-Use
DG Environment, Unit D.2 Marine Environment and Water Industry
Brussels – 20 April 2007 European Commission - DG Environment
Item 7. Paving the way for WFD in Cross Compliance
Marine Environment and Water Industry
European Marine Monitoring and Assessment
EU Water Framework Directive
European waters - assessment of status and pressures 2018
CMA-1 activity Berlin – 2 May 2007
Mandate and proposal for working methods
Presentation transcript:

on Priority Substances Strategic Coordination Group Progress Report on Priority Substances Strategic Coordination Group Brussels, 05-06 November 2008 Madalina DAVID - Unit D.2 – Protection of Water and Marine Environment

Content Work programme Database and Prioritisation process Draft Mandate for Mixing Zones Draft Mandate for a new activity on emissions DG on Prioritisation EG-EQS

Strategic Coordination Group (SCG) EG on EQS Led by UK and JRC-IHCP TGD for EQS derivation Test the guidance DG on Prioritisation Led by JRC-IHCP Prioritisation methodology based on monitoring and modelling data DG on Mixing zones - NEW Led by UK, NL and DG ENV TGD on mixing zones DG on emissions - NEW Led by NL, FR and DG ENV Identify sources of priority substances Identify potential measures CMA Led by IT, JRC-IES and DG ENV CMA-1 - Monitoring Best Practices CMA-2 – Quality assurance and control CMA-3 – Support to standardisation Strategic Coordination Group (SCG) WG E on Priority Substances Led by the DG ENV Data collection and processing Prioritisation methodology Environmental Quality Standards (EQS) Chemical Monitoring Activities (CMA) Emission controls Implementation Guidance Requirements of EQS Directive

Work programme for the review of the PS Article 8 of the new EQS Directive end of 2010: merged proposal (review of the priority substances list together with the EQS setting) substances listed in Annex III of this directive shall be considered inter alia for possible identification as priority or priority hazardous substances Existing/final drafts/targeted EU RARs Prioritisation based monitoring (INERIS) Prioritisation based on monitoring and modelling data (JRC) New information on existing priority substances

Central database - I The central database and associated data treatments (Fribourg-Blanc, 2008) Data 2000-2007 Surface water 24 Member States ( CH and NO, but  BG, EL and MT) 20 104 stations 5 water body types 385 219 sampling 5 068 940 analysis 937 substances

Central database - II new data collection is still needed, in particular for: the Member States who did not provide data or report small datasets transitional and coastal waters sediment and biota 13 substances that are in the Annex III of the new Directive 31 October 2008: intention to provide new data on priority substances 15 January 2009: data submission using the available data tool (http://www.oieau.fr/WISE-end-user-tool/) factsheet to disseminate the information  written comments by 31 October 2008.

Prioritisation Prioritisation process: 1st ranking (Bonnomet, 2008)

Draft Mandate for a mixing zones guideline - I Article 4(4) of the new EQS Directive: technical guidelines for the identification of mixing zones should be adopted through comitology procedure Mandate of the Drafting Group: to support WG E  the CIS of the WFD 2000/60/EC, establishing activities on mixing zones the guidance will be tested background document: Mixing zones (Bonnomet, 2007), the UK and the NL approaches

Draft Mandate for a mixing zones guideline - II 4th WG E meeting: mandate, tentative timetable and proposed content of the guidance The Drafting Group on mixing zones will be chaired by the UK and co-chaired by the NL and the Commission Members: FR, DK 24 October: send comments and express the interest  DE, EUROELECTRIC, CEFIC, CONCAWE, EUREAU and HU + BE (test) early 2009: 1st draft guidance SCG is requested to endorse the draft mandate and the proposed approach of the drafting group

Draft mandate for an activity on emissions - I Result: Workshop on Diffuse Sources (Amsterdam, 28 – 29 May) Meeting of Water Directors in Slovenia (June 2008) Drafting Group: chaired by the NL and co-chaired by FR and the COM background information: How to build an inventory of emissions, discharges and losses (Fribourg-Blanc, 2007) results of the research on measures as part of the SOCOPSE and SCOREPP projects results of the studies on based on emissions of defined substances existing legislation/reports/studies (for e.g. Risk assessments reports made at EU level, mitigation measures, RIVM studies)

Draft mandate for an activity on emissions - II 5-step approach Step 1. Identify priority substances for which diffuse sources prevent reaching WFD-goals Step 2. Identify potential measures at national and/or EU level based on substance specific studies on existing legislation and gaps Step 3. Discuss effectiveness and feasibility of measures Step 4. Prepare technical substance specific report integrating results of previous steps Step 5. Prepare a technical report with potential measures in order to contribute to the cessation or phasing out of discharges, emissions and losses of PHS

Draft mandate for an activity on emissions - III 31 October 2008: comments in written on the new activity on emissions and to express their interest to join the drafting group  EEA, UK, IT, DE, EUREAU, CEFIC? and BE? Tentative timetable for 2009-2010: Kick-off meeting in January/February 2009: draft activity sheets, time-table and assignment of tasks First half of 2010: final report to WG E SCG is requested to endorse the draft mandate and the proposed approach of the drafting group Article 5(6) of the new EQS Directive: technical guidelines for the establishment of the inventories should be adopted through comitology  work for the next year

Drafting Group on Prioritisation led by JRC-IHCP members: Member States (DE, DK, ES, FI, FR, NL, SE, SK, UK) Commission (DG ENV, JRC-IHCP, INERIS as Commission’s consultant) Industry (EUROMETAUX) Mandate: to develop a comprehensive methodology (based on monitoring and modelling data) for medium and long term revision of the priority substances to use as a starting point the UK methodology 17 November 2008: comments on the UK methodology and the universe of chemicals used

Expert Group on EQS led by UK and co-led by JRC-IHCP members: Member States (BG, DE, DK, ES, FI, FR, NL, SE, SK, UK) Commission (DG ENV, JRC-IHCP, INERIS as Commission’s consultant) Industry (EUROMETAUX) Mandate: to establish a guidance for EQS derivation 6 technical sub-groups (generic issues, water column, metals, biota, sediment, non-testing methods) Working drafts of the guidance documents: http://ecb.jrc.ec.europa.eu/eg-eqs/ February 2009: 1st Draft of the TGD

Next meeting of WG E: 18-19 March 2009 http://circa. europa

Thank you for your attention!