Beam RF Effects Update Mike Woods, SLAC

Slides:



Advertisements
Similar presentations
January US LC Workshop SLAC – Chris Damerell 1 Strategies for pickup and noise suppression with different vertex detector technologies Chris Damerell.
Advertisements

ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
A Final Word ILC Jan 8th, 2005 Eric Torrence University of Oregon.
M. Woods (SLAC) BI Tests for the Linear Collider Turning the LOI into a Proposal SLAC ALCPG Meeting Jan. 9, 2004 M. Woods, SLAC LC-LEP Beam Tests at SLAC.
Vtx Detectors, Jim Brau, UTA, Jan 11, Jim Brau ALCPG Workshop UT Arlington Jan 11, 2003 Summary of Vertex Detector Working Group R&D efforts in.
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
1 June 7, 2006M. Woods, SLAC Collimator design, wakefields (T-480) BPM energy spectrometer.
Web-Based ILC Multi-Bunch Simulation Database Glen White (SLAC / QMUL) ILC MDI Workshop SLAC, Jan 8th 2005.
01/07/2005 SN 1 of 16 Esti mation of HOM Power in the Interaction Region of ILC Sasha Novokhatski Session “Beam RF Effects” ILC MDI Workshop SLAC January.
1 M. Woods, SLACMDI SLAC WORKSHOP Machine-Detector Interface at the International Linear Collider Jan. 6-8, 2005SLAC Introduction to Topic of.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
EM background tests of IP feedback hardware Christine Clarke Oxford University 24 th September 2007 Oxford (P. Burrows, C. Perry, G. Christian, T. Hartin,
Beam Crossing Angle for  Tohru Takahashi Hiroshima University International Linear Collider January 2005 MDI Workshop SLAC.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
1 July 19, 2006M. Woods, SLAC (S. Boogert, RHUL) Collimator design, wakefields (T-480) BPM.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ILC EMI and bunch length measurements Gary Bower, SLAC Nick Sinev, U. Oregon, speaker Sean Walston, LLNL.
Vertex Detector Review, FNAL, October Beam-induced EMI and detector electronics Gary Bower, SLAC LaVonda Brown, Norfolk State University Nick.
Robert Klanner - DESY 1 DESY, HERA and the US contribution HERA and DESY HERA status ZEUS and the US groups HERA and particle physics.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
ILC Detector R&D in Japan Hitoshi Yamamoto Tohoku University.
IRENG, SLAC, September 17-21, 2007 Beam-induced EMI and detector electronics Gary Bower, SLAC LaVonda Brown, Norfolk State University Nick Sinev, University.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Vertex detector update 1 Oct Y. Sugimoto KEK.
Andrei Nomerotski, University of Oxford ILC VD Workshop, Menaggio 22 April 2008 SiD Vertex Detector.
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
1 June 7, 2006M. Woods, SLAC Collimator design, wakefields (T-480) BPM energy spectrometer.
Beam induced EMI and detector electronics Nick Sinev, University of Oregon Gary Bower, SLAC Yasuhiro Sugimoto, KEK.
MDI Simulations at SLAC Takashi Maruyama, Lew Keller, Thomas Markiewicz, Uli Wienands, SLAC MAP Collaboration Meeting, FNAL June 21, 2013.
KA12 Marcel Demarteau Fermilab DOE Site Visit August 23,
SiD MDI Update Topics for Discussion Tom Markiewicz/SLAC ILC BDS Meeting 15 May 2007.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
J.P.DelahayeTILC08: 06/ 03/ 081 CLIC-ILC Collaboration? Following visit of CERN (Nov 07)
Comments on the February DOE Review
Machine Detector Interface Design Updates
Conventional Facilities and Siting Global Group (ARCFS)
IP Beam Instrumentation R&D and Testbeams for the ILC
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
ILC EMI and bunch length measurements
Testbeam plans for LEP instrumentation
Workshop Goals for the Detector Groups
Preparations for the SiD Workshop at Fermilab, April 9-11
Introduction to the Workshop
So what have we learned and what’s the roadmap?
Beam-induced EMI and detector electronics
ILC Detector R&D in Japan
CLIC Detector CERN Status + plans
Overview of MDI design II
K. Kawagoe (Kobe-U) 30-Mar-2010 LCWS10 in Beijing
Dave Bailey University of Manchester
End Station Test Beam (ESTB) at SLAC
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
ECMbias in the presence of Beamstrahlung
PH3520 / Particle Physics Autumn term 2010 – week 4
Super-B Factory in a “4400m” Tunnel
IPBI-TN R. Arnold (with help from T. Fieguth)
Upcoming CALICE meetings
Presentation transcript:

Beam RF Effects Update Mike Woods, SLAC Session on this at MDI Workshop, http://www-conf.slac.stanford.edu/mdi/sessions/beamrf.htm Talks at this Workshop: Test Beam session, “ILC Tracking and Test Beams Status and Plans” D. Bailey, U. of Bristol www-conf.slac.stanford.edu/lcws05/program/session.asp#o DAQ session, “MDI Issues for DAQ (EMI and Backgrounds)” M. Woods www-conf.slac.stanford.edu/lcws05/program/session.asp#m LCWS 2005, Stanford

Beam RF Effects Summary From MDI Workshop, Jan. 2005 Significant impact on: RF shielding for beamline and detector components Detector design Signal Processing and DAQ architecture Beam rf effects have had a significant effect at previous colliders: ex. SLC, PEP-II, HERA, UA1 beampipe heating and EMI from HOMs Detector physicists MUST study this seriously together with the accelerator experts Beam Test at SLAC ESA to further investigate this is proceeding: with SLD’s VXD3 and with simpler beampipe strong desire for this from international vertex community can provide important information for VXD design and for signal processing/DAQ for all LC Detector systems Working group participants: M. Woods, C. Hast, N. Sinev, R. Arnold, S. Worm, D. Bailey, D. Cussans, Y. Sugimoto, T. Nelson, S. Parker, … LCWS 2005, Stanford

LCWS 2005, Stanford

LCWS 2005, Stanford