P10457: D-R Process Improvement

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

Dept. of Computing and Technology (CaT) School of Science and Technology B.S. in Computer Information Systems (CIS) CIP Code: Program Code: 411.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Artificial Limb Project By Casey Dill. Mission Statement This project will improve upon existing plans for an artificial arm with the same capabilities.
P10457: D-R Process Improvement Compressor Assembly Area Patrick Muldoon Introductions and Welcoming Comments.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
Project Management Skills for Math and Science Professionals Lorena Mathien Coordinator, PACM Program Buffalo State College October 14, 2011.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen 1R10002 Process Improvement.
INDUSTRIAL & SYSTEMS ENGINEERING
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Process Improvement Project P09457 Eric MacCormack Colin Roy.
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Deloitte Consulting SCOOPS Session September 2003.
CC1008NI - Personal Development For Computing Tutorial 1.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Industrial Engineering Roles In Industry
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Chapter 10 Information Systems Analysis and Design
Sustainable Technology For The Global Market Family of Projects James Brown Rishitha Dias Casey Dill Neranjan Dharmadasa Kevin Klucher Eric MacCormack.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
Preparing for ABET visit Prof. Dr. Lerzan Özkale Management Engineering Head of Department November 2010.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
EDGE™ Final Project Plan Presentation P08043 – Mass Spectrometry Sample Preparation.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees.
EDGE™ Project Status Update P09023 – Air Muscle Artificial Limb Next Generation Jim Breunig (ME)
P10452 Dresser Rand Compressor Installation and Utilization Joe Bykowicz (ME) Dresser Rand Model.
Upturn Consulting 27, March 2017.
Introduction to Project Management
Design – BIM – Build – Operate
Methodologies and Algorithms
Mechanical & Manufacturing Engineering Program
Systems Analysis and Design in a Changing World, 4th Edition
Turbomachinery Flow Visualization P08453
Wegmans Projects Matt Syska, Industrial & Systems Engineering Andreana Crance, Industrial & Systems Engineering.
Project Management Processes
PROJECT ORGANIZATION (Refer to Chapter 3).
Concept Level Project Plan P08008 – ArcWorks Process Improvement
End of DPM Presentation P08405—Novel Materials Technology
Business System Development
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
Introduction to Tech Communication & Project Management Arthur C.M. Chen , Rm
Chapter 3 Managing the Information Systems Project
The Business Plan : Creating and Starting The Venture
P16702: ABVI Fabric Shredding Process and Facility Design
SENIOR DESIGN PROJECT P08455
Deloitte Consulting LLP SCOOPS Session
Project Management Process Groups
Project Management Processes
Project Readiness Review P10029 – Air Muscle Artificial Limb
SENIOR DESIGN PROJECT P08455
Value Engineering in a Manufacturing Facility
Final Status Update P09006 – Upper Extremity Exerciser
Final Project Plan P09004 – Eye Movement Tracking Device
CEng progression through the IOM3
Project Information Project Name Process Improvement Project
Presentation transcript:

P10457: D-R Process Improvement Patrick Muldoon (ME)

Company Background “For more than 100 years, Dresser-Rand has been among the largest global suppliers of rotating equipment solutions, with field-proven centrifugal and reciprocating compressors, steam turbines, expanders, gas turbine packages, and control systems.” “Dresser-Rand is positioned to deliver a complete package of solutions, from initial concept to equipment retirement for the worldwide oil and gas, chemical, petrochemical, and process industries.” http://www.dresser-rand.com/

Mission Statement The mission of the Process Improvement Innovations Project is to implement lean principles into the compressor assembly area at Dresser-Rand Corporation's Olean facility in order to reduce cycle time. Goal: Reduce cycle time by 25% Safe operational work areas Improve flow//Eliminate problem areas Approach: Improve the flow of product Part inventory Visual controls Reducing scrap 6S Sort, Stabilize, Shine, Standardize, Sustain, Safety http://www.dresser-rand.com/oil&gas/pop_dr-7.htm

Project Relevance P08455 – Value Engineering in a Manuf. Facility Compressor Final Internal Assembly Stand P09457 – Process Improvement Project Piping and Packaging Line D-R Material Flow Improvement Project From P08455 Final Drawing Package Photo taken by P09457

Staffing Requirements Name Discipline Roles/Skills John Kaemmerlen RIT ISE Dept. Professor Faculty guide Provide team and project oversight from academic and technical perspective. Phil Bryan Johnson & Johnson Tech Support Provide team and project oversight from technical perspective. Patrick Muldoon M.E. Project Manager Point of contact for D-R; Construct and submit deliverables; Assist in any necessary tasks. I.E. Student (TBD) I.E. Chief Engineer Focus direction of work; lead in Simulation and Factory CAD Software. Engineer Strong background in the fields of lean, simulation, and ergonomics. M.E. Student (TBD) Skills in custom tooling; Set-up reduction and assembly design opportunities.

Intellectual Property Considerations Factory operations Product concepts and design http://www.dresser-rand.com/gfc/default.asp

Work Breakdown Structure All team members Tour D-R facility in Olean, NY Review//Update customer needs Project Manager Assign team roles & coordinate responsibilities Implement organized work breakdown structure Maintain document control Chief Engineer Maintain “big picture” view of assembly area Obtain all data of current D-R compressor assembly process Create current state value stream map IEs Factory CAD analysis of current D-R CAD layout Current state simulation model ME Become familiar with current assembly processes, tooling used, and materials used Evaluate the correlation between product drawings and the assembly process

Team Values and Norms Punctual Thorough Accurate Professional & Ethical Committed Demonstrates the core RIT values of SPIRIT Student Centeredness, Professional Development and Scholarship, Integrity and Ethics, Respect, Diversity and Pluralism, Innovation and Flexibility, Teamwork and Collaboration

Required Resources Personnel Environment Equipment Materials Monetary Prof. Kaemmerlen, RIT Phil Bryan, Johnson & Johnson Dennis Rice, Dresser-Rand Process Innovation Director Pat Comer, Dresser-Rand Process Innovation Engineer Environment MSD Lab ISE/ME Computer Labs D-R Olean Facility Equipment Arena Software Factory CAD Software Pro/ENGINEER Software Materials TBD Monetary http://www.dresser-rand.com/recip/eq/default.asp

Affinity Diagram Ergonomics Work areas Parts on ground Stock lay-down area Bundle stand Bundle insertion Adjustable shop equipment Functionality Material movement Part issue time Inventory management cycle time Minimize lost parts part identification process Stock retrieving delays Quality control Unused parts location Cart for in-process parts Factory Attributes Assembly areas Production areas Inspection area Personnel break area Active stock area Scrap area Racking system Multi-use assembly areas

Objective Tree Implementation of lean principles within the compressor assembly area in order to reduce cycle time. Resources Personnel Equipment Time Economics Materials Labor Consolidation Technological Tooling Safety Organization Scope Hardware Software Documentation

Function Tree Organized Operational Flow of Processes Flow of Materials Factory Layout Organized Stock Inventory Scrap Inventory In-process Inventory Safe Ergonomics Equipment http://www.dresser-rand.com/insight/Summer08/Story_Proactive.html

Possible Consequences Risk Assessment Description Possible Consequences Probability Severity Overall Contingency Plan Worker resistance to change Workers will not comply with changes in assembly process H M Discuss changes with personnel and take into account feedback Increased production cost Cost of production will be more than budgeted & changes may not be implemented Continuously meet with customer and evaluate possible changes as well as budget limits Disruption of other processes Cycle time of other processes will increase and projects will not be completed on time Work with customer to schedule changes with overall flow of current projects Quality vs. Speed tradeoff Quality is overlooked due to reduced cycle times L Use lean techniques to create more value with less work