“WAR ROOM” CONCEPT Purpose: Post on the Walls: Use for: Need:

Slides:



Advertisements
Similar presentations
Crescent Academy International
Advertisements

Adhesives & Tapes Artists & Graphics Supplies Books & Pads Desktop Accessories Envelopes Files, Pockets & Binders Writing Equipment Staplers & Staples.
School of Engineering & Technology Computer Architecture Pipeline.
PRJ566: Project Planning and Management Choosing Iterations in terms the importance of use cases.
TELEPHONE NUMBER TELEPHONE NUMBER
This section of our subject requires you to manage a project in which you will plan, design and develop a podcast of an interview with the designer of.
Phase Difference = Phase Difference = 0.05.
Explanation of seating chart On the left side of the template, you see 5 green squares. The squares represent the computer area. The three bigger squares.
Building the Info-structure for Advanced Blended Learning: Lewis and Clark as Foundation for Land Power University.
+ CLASSROOM DESIGN: KINDERGARTEN Steele’s Six Functions in Classroom View! Brittany Maiden 10/6/14.
Harry Puckering Limited 1 Managing Projects Harry Puckering.
1 Vision Facilitation Long Range Planning For Rotary Clubs.
ABC WIDGITS … Providing outstanding widgets since 2003 Project Sponsor: Michael Phelps Project Team Members: Warren Selby, Beckie Hicks, Cody Love.
GROUP 1 Advantages of electronic system over its corresponding traditional system.
TextMonTuesWedThursFriSatSun Text example GANTT CHARTS Example text Text.
Project Management Models
(Centre for data Collection) Community Empowerment Lab.
Olin Library Reference Statistics Reporting System CS 501 Team: Ronald DeVera Matthew E Kulick Annie Lin Kavitha Nair Soutrik Pramanik Krystal Wang Kevin.
{ Phases of Project & life cycle Prepared by: Syed ShahRukh Haider.
Milestone 5 Review Control Phase Complete Cost Data Integrity Project February 28, 2008.
Where is the fax machine? The fax machine is next to the telephone on the desk. The plants are on the filing cabinet, cupboard and table. Where are the.
Project #5 Mrs. HoltKK – One Hundred This number was on the wall outside the office. It tells everyone that the office is in room number 100.
Logistics for the Week: What Should We Consider.  Sample schedule  Orientation/ training (Day 1)  Debrief & learning exchange (final day)
Lobby. Conference Rooms 11 Total Conference Rooms 3 Closing 6 Portable Classrooms w/ projector screen 2 Presentation Rooms w/ plasma TV's.
Response to Intervention (RtI) How can we make it work in Wisconsin?
1 Based on PMI the Methodology. 2 This document has a sole propriety owner. © 2015 i-Clipse Technology, a Private Canadian Corporation. All rights reserved.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
APRIL 18-23, 2012 PROJECT PLAN TO DEVELOP A LEARNING & DEVELOPMENT STRATEGIC PLAN FOR RETAIL EMPIRE, INC. Prepared by: Alice Monroe, Chief Learning Officer.
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
Visual Management in Procurement Dialogue Boot Camp Guidance Execution of Sourcing Strategy through Competitive Dialogue Phase.
Concept for Room Layout. Customer Needs for Room Layout/Setup Safe to UseEasy to Use Easy to Modify/ Work on Compressor Easy to Learn.
Joint Project Planning (JPP) Sessions
©2012 RAY SVENSON CONSULTING, INC. 1 DESIGN MEETING AGENDA/WORKING TEAM Meeting Purpose: The purpose of the meeting is to design a high-level Learning.
ANALYSIS FINDINGS AND CONCLUSIONS
Requirements Workshop Techniques for E-Business Projects
Michael Newman Technology, Seating Chart, & Computer Schedule.
DATE PROJECT PLAN TO DEVELOP A LEARNING & DEVELOPMENT STRATEGIC PLAN FOR Prepared by: 1 ©2012 RAY SVENSON CONSULTING, INC. RAY SVENSON CONSULTING, INC.
©2012 RAY SVENSON CONSULTING, INC. 1 ANALYSIS MEETING AGENDA/WORKING TEAM Meeting Purpose 1.Pull together all the data that has been collected into one.
Chapter 3: The Project Management Process Groups: A Case Study Information Technology Project Management, Fourth Edition Project Execution & Closing Thursday,
Appendix L MiCSES IT Governance. 21 October 2016 Project Management Methodology Closeout Planning Execution Control Initiation Procurement Management.
CMGT 410 Week 5 Learning Team Project Evaluation and Control Check this A+ tutorial guideline at
What is a computer? Lesson 1-1.
Customer Journey Mapping
WHAT IS A GANTT CHART.
Title Page Team Name Location.
What is a computer? Lesson 1-1.
Individual Room Design
Future L&D System Architecture
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Individual Room Design
Libraries Providing Learner Support: The Collaboration Connection
[Work Order #] [ARB Date]
Tools for Visualization
IMPLEMENTATION PLANNING MEETING AGENDA/WORKING TEAM
Propaganda Poster Walk
STRAW MODELING GUIDELINES
First and Second Quarter
IMPLEMENTATION PLAN AND BUSINESS CASE REPORT OUTLINE
Future L&D System Architecture
Around the room Orders of operations.
SLC Characteristics 9:00 – 9:45 Table Groups
Miami Valley School Location: Dayton, Ohio Grades: K-5 Students: ≈ 200
SAMPLE COST ROLL-UP Sample OVERALL COST ROLL-UP
EXECUTIVE STEERING TEAM – DESIGN REVIEW MEETING AGENDA
IMPLEMENTATION PLAN OUTLINE
Module 2: Keeping Good Attendance (Group Brainstorm)
Desk x9 Desk x2 Desk x1 Table x2 Book x7 Fridge x1 Shelf Buy! Chair
Screen podium Table 7 Table 8 Table 9 Table 4 Table 5 Table 6 Table 1
LEARNING & DEVELOPMENT STRATEGY: PROCESS OVERVIEW
[INSERT ORGANISATION NAME] PROJECT MANAGEMENT LIFECYCLE
Presentation transcript:

“WAR ROOM” CONCEPT Purpose: Post on the Walls: Use for: Need: PHASE 1: Project Planning Purpose: Post on the Walls: Use for: Need: Provide a large room dedicated to the project for the duration Project Plan and progress tracking Analysis conclusions High-level L&D architecture Implementation milestones Implementation scenarios Working Team meetings Project Manager office Briefing executives and stakeholders by having them “walk the walls” Lots of blank wall space Table for Working Team meetings Desk for project manager Telephone and intranet/internet access Printer Projector and screen Flip charts