From Tanker Roll-Over to NFA

Slides:



Advertisements
Similar presentations
In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Advertisements

Oil Bioremediation Products. Who are Oil Technics? Over 30 years experience Based in Aberdeenshire, Scotland Manufacturer & supplier of innovative specialist.
FMC SPILL SITE July 11, 1996: Tanker truck turned over spilling 6000 gallons (23000L) gasoline 500ft (150m) North from Bear Creek Emergency Response Team.
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Greenwich Peninsula.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Observations  Increased awareness of sustainable environmental practices.  Plethora of bioremediation products that have not delivered on promises.
Gasoline Spill Cleanup (Volatile Components) Rose Adam Allison Rose Adam Allison.
BoRit Superfund Site Timeline
MNM Fatal Fall of Person Fall of Person October 10, 2014 (Pennsylvania) October 10, 2014 (Pennsylvania) Cement Operation Cement Operation Truck.
Air Sparging at Fort Greely, Alaska Presented by Aung Syn & James Powell.
Bioremediation of contaminated soil. ..our focus is service…guaranteed! Root causes of oil spillages and site contamination Hose failures on mining machines.
Dale T Littlejohn Senior Geologist. What is fate and transport in the vadose zone? Vadose Zone Hydrocarbon release from buried pipeline Aquifer Surface.
DISTRIBUTED BY. A non-toxic, Planet Friendly solution for soil remediation  Proven effective in the field with documented test results Environmental.
Biodegradation of btex
“GAS MART” petroleum facility in Florida By: Ernest Twum-Barimah Zhengzhong Fang (John) Zhengzhong Fang (John)
H23A14 Briton Ferry Gas Works Land Contamination Antreas Christodoulides Georgios Efstathiou Antreas Christodoulides Georgios Efstathiou.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
HWY I-90 MP 460 NB 2/2/ % Ammonium Nitrate Solution.
Rhode Island Department of Environmental Management
Factors that Influence the Occurrence of Nitrate in the Upper Willamette Valley Basic Groundwater Hydrology Understanding Nitrate and its Distribution.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Bioremediation.
Regional Response Team /Northwest Area Committee (RRT/NWAC) Meeting Coeur d’Alene, ID.
LOGO Feasibility Test of Applying Complex Remediation Technology for Diesel Contamination in Soil and Groundwater 2012 International Conference on Environmental.
Module 1: Ethanol and Ethanol-Blended Fuels. 2 Objective Upon the successful completion of this module, participants will be able to describe the use.
1 GROUNDWATER REMEDIATION OF A HIGHLY CONTAMINATED BEDROCK SITE - The Oxygen Infusion Phase - J. Morrow D. Side By :
OLD POLE Remediation Project FY11. Old Pole Location.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
Rural, Community & Onsite Wastewater & Waste Management Role of Soil in Biological Treatment.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
Basic Hydrology Water Quality: Sediment production and transport.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Groundwater and NAPL Monitoring Oregon DEQ, Hart Crowser, Inc., and GSI Water Solutions 2010 McCormick & Baxter Annual Report.
Thank you to IPEC and Canadian Pacific for the opportunity to present! Outline: 1. Brief Site History 2. Summary of Bioremediation Activities 3. Summary.
ALASKA DISTRICT Recontamination and Recharacterization, Ham Lake Area, Northway Staging Field, Alaska Shah Alam, Kenneth Andraschko, Daniel McKay and Richard.
A Tree-Based Remediation System for Treatment and Hydraulic Control of a Hydrocarbon Plume in a 20 Foot Deep Aquifer at a Former Refinery in Central Oklahoma.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
FULL - SCALE IMPLEMENTATION OF A PULSED AIR SPARGE AND SVE SYSTEM FOR TREATMENT OF VOCS, SVOCS, AND ARSENIC Authors: Kale Novalis, Nadira Najib, Omer Uppal,
“ Safer, More Effective ISCO Remedial Actions Using Non-Extreme Persulfate Activation to Yield Sustained Secondary Treatment ” Michael Scalzi, President.
Advances in Hydrocarbon Remediation Technology and Water Treatment
High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds Presented by: Neil Nowak, PE Phone:
MIC 303 INDUSTRIAL AND ENVIRONMENTAL MICROBIOLOGY
MNM Fatal Falling Material Accident Falling Material Accident April 11, 2012 (North Carolina) April 11, 2012 (North Carolina) Sand & Gravel Operation.
1 Module 1: Ethanol and Ethanol-Blended Fuels. 2 Objective Upon the completion of this module, participants will be able to describe the use & continued.
Kennametal, Inc. ALG Madison County November 25, 2014 Karl M. Ryan, inspector 1.
Melissa Boggs California Department of Fish and Wildlife, Office of Spill Prevention and Response.
What Do You Know About Michigan’s Hidden Resource?
Road making chemical Environmentally friendly
Big French Creek Slide Timeline of Events
Groundwater Pollution
Background Professional Geologist - 36 years
Environmental Cleanup Program Status
Groundwater Basics.
Nenad Marić, Zoran Nikić University of Belgrade, Faculty of Forestry
Barrier Wall Performance 2009 Data
Jesse Taylor: Remington Technologies
What is the Water Cycle?.
Rapid Closure of Lingering Off-Site Plume Remediation Program in Residential Neighborhood using Horizontal Air Sparge and Soil Vapor Extraction Wells Narayanan.
Qays Jasim Saud Syed E. Hasan Department of Geosciences
ENHANCED BIOREMEDIATION PILOT USING iSOC® TECHNOLOGY AT A FORMER MANUFACTURED GAS PLANT CASE STUDY PREPARED BY: MR. DAVID WORK, PE RETEC GROUP.
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Harbour Island Force Main Replacement
Habitat Changes and Fish Migration
Washington State Biodiesel Use & Lessons Learned
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

From Tanker Roll-Over to NFA Theresa Sorrells Alpine Remediation, Inc. Golden, CO

Remote Location in Utah State with Many Obstacles Railroad Tracks Creek Sloping Shoulder

Remediation Considerations Remoteness of Site No Access to Power Ruled Out Mechanical Systems Spill Occurred 60 feet from Creek Needed Immediate Results Remedy Could Not Negatively Impact Water Quality Ruled Out Surfactants & Nutrients Sloping Roadway Shoulder Large Trucks Could Not Access Ruled Out Excavation Active Railroad Tracks with Two Way Traffic Also Ruled Out Excavation

Solution Chosen In Situ Injections of BOS-200®

BOS 200® A Carbon/Biological based product consisting of: Activated Carbon Calcium sulfate Nitrate Micro and macro nutrients Consortium of facultative bacteria Two primary treatment mechanisms take place with BOS 200®: The first mechanism is the “Trap”:  BOS 200® uses activated carbon to adsorb petroleum hydrocarbons. Biodegradation, the “Treatment”, is the second mechanism of BOS 200® remediation An ideal environment for the biological process, where hydrocarbons are adsorbed on to BOS 200® particles BOS 200®

Work/Design Considerations Spill consisted of several thousand gallons of fuel Site lithology was sand & gravel with bedrock starting between 12 & 18 feet Groundwater benzene concentrations were as high as 14 mg/L Spill impacted approximately 7,000 square feet Spill impacted both sides of railroad tracks Trains had Right of Way Work had to be halted & equipment moved for oncoming trains All non-essential equipment had to be parked on shoulder of road Essential equipment had to be hauled across the railroad tracks, which involved disassembling & reassembling the injection system Not able to take any soil samples to aid in design because of access restrictions by the railroad

Grid Based Design IMP-1 IIMP-3 IMP-2 IMP-4 MW-1 GW Flow Direction Injection boreholes located throughout 7,000 square foot treatment area Used 10 foot triangular grid pattern to locate 70 boreholes Injection boreholes on both sides of railroad tracks- 62 on south side and 8 on north side

Treatment Depths Injectate Treatment depths were based on the depth to groundwater and the depth to bedrock Treatment on the south side of the tracks occurred between 8 and 15 feet Treatment on the north side of the tracks occurred between 8 and 12 feet Change in final injection depth was due to the depth to bedrock Top-down injections critical to success 24”

Injections were performed in June of 2010 and again in October of 2010 Groundwater was sampled in November of 2010, March of 2011, & October of 2011 BTEX and TPH-gasoline were below MCLs in all wells NFA issued by the Division of Water Quality of the State of Utah in January 2012 Timeline

And Again Apr. 2012 In April of 2012, a second truck rolled over onto the railroad tracks 200 yards past the original accident. July 2012 The same procedure was used to design the clean up the contamination. Injections occurred in July of 2012.

Colorado Mountain Pass A similar technique was also used for a tanker truck rollover accident on a mountain pass in Colorado. Snow and extreme cold exist at the site from October through May, limiting access to the site. The bulk of the spill was removed by excavation. During the excavation, an old french drain was discovered that had ultimately transported the contamination approximately 200 feet from the original spill site. Groundwater benzene concentrations before the injections were as high as 4 mg/L and were ND after the installation. The spill was closed shortly after installation.

Reservoir in Idaho Raised highway through a reservoir Another overturned truck 6,500 gallon spill that impacted the reservoir & the surrounding area Immediately excavated Remaining contamination migrated down from highway level when the surface water levels dropped in the winter, danger of more impacts to reservoir Groundwater benzene as high as 12 mg/L