PULSE PROTOCOL – P2 Capacity and organization GROUP NUMBER:

Slides:



Advertisements
Similar presentations
Saggers Pty Ltd Consultants in Supply Chain Management.
Advertisements

EIDE System Requirements and Specification Documents
SEN In, Out and Beyond All About… All About... [insert company name]
Gage R&R Estimating measurement components
Foreman Log-in Is it before 5 pm N Y Message: Please Submit time to admin Select Job (open Job Only) Select Employee Enter Today’s Tows WK Enter Comments.
Handle] [Person Handle 1] [Person Handle 2] [Person Handle 3] [###] Handle] [Description.
Continuous School Improvement Final Presentation School Name Date.
Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang.
Power Forecasting and Fleet Location Optimization American Commercial Barge Line LLC Gail W. DePuy, G. Don Taylor and Amy Bush Center for Engineering Logistics.
Chapter 15 Application of Computer Simulation and Modeling.
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
MSE507 Lean Manufacturing
E-Commerce: The Second Wave Fifth Annual Edition Chapter 12: Planning for Electronic Commerce.
NOKIA’S 10 OM DECISIONS. Service and Product Design Consumer taste divergence/fashion business Shortening life cycles Research&Development Fragmenting.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Six Sigma TOTAL QUALITY MANAGEMENT 6 
The Nokia case. What is Nokia? Nokia is the world leader in mobility, driving the transformation and growth of the converging Internet and communications.
Facility Planning & Design Prepared by: Brannon McGrotha.
Introduction and Course overview by S. O. Duffuaa.
UNIT 22- Managing Human Resources
SchedulingProducingControllingSchedulingProducingControlling.
DS Tech Tool Company.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
1 Phases in Software Development Lecture Software Development Lifecycle Let us review the main steps –Problem Definition –Feasibility Study –Analysis.
Reliability Andy Jensen Sandy Cabadas.  Understanding Reliability and its issues can help one solve them in relatable areas of computing Thesis.
Your Logo T-Scale Intermodal Intermodal communication environment.
Workflow Description Roles and Responsibilities DEVA Data Management Workshop Devil’s Hole Pupfish Project Project Managemen t!?!
5-1 Value Chain Analysis and Activity-Based Management C hapter 5 Prepared by Douglas Cloud Pepperdine University.
© Copyright 2006 EFET The importance of common intra-day markets and balance settlement methods Hartmuth Fenn 2nd Northern Europe Electricity Miniforum.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 5 Manufacturing and Service Process Structures McGraw-Hill/Irwin.
1 A Training and Curriculum Development Partnership for Automated Manufacturing Jess Lee Niebuhr Anoka-Ramsey Community College
Location Estonia Population 1,3 mln Area km²
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
{ Determine services to provide for customers When a business determines which services to offer its customers, it should consider: The nature of the.
SchedulingProducingControllingSchedulingProducingControlling.
Implications of Energy-Only Procurement on Transmission Planning CPUC Workshop: Revisions RPS Calculator v6.0 Robert Sparks Manager Regional Transmission.
Pennant Corporate Overview  Specialize in  Product Life Cycle Support  World Class Logistics Support Analysis (LSA) Software  Simulation & Training.
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Chapter 12 The Network Development Life Cycle
Control Systems Design Part URS Slovak University of Technology Faculty of Material Science and Technology in Trnava 2007.
POD #1 By: Alexis Rapach. Question  An employee of a delivery company drives 480 miles at 60 miles per hour in a vehicle that averages 20 miles per gallon.
Reduced Unit Cost For Discretionary Work Innovation Scorecard Portfolio MixRate of Failure Potential Dollar Savings Employee Innovation Training Hours.
SchedulingProducingControllingSchedulingProducingControlling.
Customized services are services that are developed to meet individual customer's needs and wants. Determine services to provide for customers.
 Scope  Process map  Process matrix  Current problems  Implementation and training considerations  Sign-off page  Metrics & Volumes.
Industrial Automation and Robotics Mr. Muhajir Ab. Rahim School of Mechatronic Engineering UniMAP.
Manufacturing Simulation Case Studies
Lawn Care Management System
Operations Strategy and Competitiveness
Direct load.
Supplier Recovery Claim Automation
ERP Systems Lecture # 7.
Hire Toyota Innova in Delhi for Outstation Tour
Operations and Service Management
Company Health Challenge Super Computer Services, Inc. Presenter Name
The new order management solution by Gurtam
Replacement HW Problem
CarGo Fleet Rentals - France
Unit 6: Joplin, Missouri Case Study
PULSE PROTOCOL – P3 GROUP NUMBER: DELIVERABLES DELIVERABLES FOR P3
14 June 2018 Matthieu Branlat (SINTEF)
SAP Business Transformation Study | Professional Services | Schnellecke Group | PUBLIC How Does a Leading Logistics Services Provider Create a Transparent.
Manufacturing Production Planning
Production and Operations Management
FISKERSTRAND HOLDING AS
Statistical Process Control
CICA Lift of the Year ≤20 tonne load Entry Template
Analyzing the Marketing Environment
Statistical Process Control
The Advantages of EIGRP on an Enterprise Network
Presentation transcript:

PULSE PROTOCOL – P2 Capacity and organization GROUP NUMBER: DELIVERABLES DELIVERABLES FOR P2 Deliverables from P1 fixed? Process description and products Includes an overview of the production process: Mapping of the process Layout Equipment Material handling and logistics Information – planning and control of process Maintenance Capacity and organization The capacity of the production system is analyzed: Working hours Number of employees and organization Delivery capability and delivery reliability Production volume and volume variations COOPERATION WITHIN THE GROUP RELATION WITH THE COMPANY MISC. (COMMENTS, PROBLEMS AND CHALLENGES) PROJECT REPORT