TS/CV/DC CFD Team ATLAS CNGS GLOBE ALICE LHCb.

Slides:



Advertisements
Similar presentations
Environmental Conditions in the LHC Experimental Caverns JCOV Thursday 18 th March.
Advertisements

TS/CV/DC CFD Team CFD Simulation of a Fire in CERN Globe of Science and Innovation Sara C. Eicher CERN, CH.
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
Reliability Analyses of a Passive Emergency Core Cooling System Aleksandra Luks.
CFD team supports CERN development 19 May M.Battistin CERN May 19 th 2011 C omputational F luid D ynamics team C omputational F luid D ynamics team.
TS/CV/DC CFD Team Computational Fluid Dynamics at CERN Michele Battistin CERN, Geneva - Switzerland.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
July 4 th 20061Moritz Kuhn (TS/CV/DC/CFD) CERN July 4 th 2006 Moritz Kuhn Cooling of the P326 Gigatracker silicon pixel detector (SPIBES) CFD – Cooling.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
Transfer of Energy. Forms of Energy Potential ChemicalMechanical Kinetic Thermal Radiant Electromagnetic (8 th ) Nuclear (8 th )
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
André Augustinus 9 October 2006 Interlocks update.
WEEK 1 You have 10 seconds to name…
PRESENTATION OF CFD ACTIVITIES IN CV GROUP Daniel Gasser.
Do Now: Baltimore Polytechnic Institute receives an average of 150 W/m 2 every day during the month of January. How many kW of solar energy land on our.
Do Now: Baltimore Polytechnic Institute receives an average of 150 W/m 2 every day during the month of January. How many kW of solar energy land on our.
TS/CV/DC CFD Team CFD Study of the L3 Thermal Environment Sara C. Eicher
6 th September 20061S. Eicher, M. Battistin Upgrade Thermal Management Workshop September 6 th 2006 Bdg 40 Sara Eicher, Michele Battistin CFD Calculations.
SAHPA ® South African Heat Pipe Association Energy Postgraduate Conference EPC2013, Aug 2013 iThemba LABS Theoretical modeling and experimental verification.
TS/CV/DC CFD Team June 2005 – CERN & CFD Presentation1M. Battistin TS/CV/Detector Cooling - CFD Team CERN June 24 th 2005 Michele Battistin CERN presentation.
ORBUMP Power Supply... 16x3 SCR’s Pulse Forming Network (PFN) - looks like a very slow transmission line. Flat top ~ (10 usec)*(number of cells). Reduced.
Preliminary result of the target polarization 2004 Kaori Kondo COMPASS target team.
1 Antonio Romanazzi 3D CFD study of the ATLAS (UX15) ventilation system.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
A two-stage system for the future cooling system.
CALO News Pascal Perret LPC Clermont 22 January 2012.
Technology and R&D Summary and next steps Burkhard Schmidt.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Ideas to Keep You and your family Ideas to Keep You and your family.
ATLAS meet Thermal Calculations of the Muon Barrel1 Brief history of thermal calculations for the Muon Barrel : Schnejinsk I Problem:
Click to edit Master subtitle style 10/1/2016 LHC PROJECT PICTURES
Irradiated T2K Ti alloy materials test plans
ECO 212 Week 5 Learning Team International Trade Simulation and Report Check this A+ tutorial guideline at 212/ECO-212-Week-5-Learning-Team-
EN-CV activities for LHC during LS2
Heating and radiological
Christophe Beigbeder PID meeting
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
CERN presentation & CFD at CERN
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
COOLING LHC RACKS PROCUREMENT
Date of download: 11/1/2017 Copyright © ASME. All rights reserved.
Wednesday September 14th
Q0 magnet, cooling, support ideas
Target and Horn status report
Beam dump on LHC beams dumped on 08:20:04 by SIS, following a failing BLM HV check in IR7.
WLCG Service Report 5th – 18th July
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Hunting the Higgs Boson at the CERN Large Hadron Collider
LHC Morning Meeting - G. Arduini
Computational Fluid Dynamic at CERN
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
FMM MARIO PALMA.
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
Saturday – Morning 7:36 beams dumped
Ventilation efficiency for Horn cooling
مديريت موثر جلسات Running a Meeting that Works
,. . ' ;; '.. I I tI I t : /..: /.. ' : ····t I 'h I.;.; '..'.. I ' :".:".
Thermal behavior of the LHCb PS VFE Board
Battery Simulation Propels Electric Cars in China
Thermal Management of Li-ion Battery Packs
High-Power Laser BEAM Welding
Monday 27th August & night
25/4/2019 Sandro Palestini & Albert De Roeck
GW detectors in the mine
Presentation transcript:

TS/CV/DC CFD Team ATLAS CNGS GLOBE ALICE LHCb

TEMPERATURE FIELD in ALICE MUON DETECTOR 3D; ≈800000 cells; 3 months Antonio Romanazzi

HEAT LOSSES in the MBB MAGNET in TI8 2D; ≈5000 cells; 2 weeks 3D ≈150000 cells still running Antonio Romanazzi

ALICE MUON VENTILATION 3D ≈1000000 cells 4-5 months Anna Mueller

ATLAS MUON VENTILATION 2D ≈250000 cells 1 month Anna Mueller

CO2 CIRCULATION in ATLAS ID 3D; ≈2000000 cells; 3 months I. Wichrowska-Polok

FIRE SIMULATION of the GLOBE 3D ≈500000 cells 4-5 months Sara C. Eicher

THERMAL BEHAVIOUR of LHCb PS VFE BOARD 3D; ≈500000 cells; still running Vaclav Vins

COOLING of the CNGS HORN 3D; ≈1000000 cells; 3 months Moritz Kuhn