DESIGN STATUS PREX II Alan Gavalya 15DEC14.

Slides:



Advertisements
Similar presentations
Robert Michaels HAMC Hall A Analysis Workshop 09 C HAMC = Hall A Monte Carlo ROOT / C++ Design Somewhat like SAMC & genercone For HRS only. Uses LeRose.
Advertisements

Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
LARGE SYSTEMS IMPLETATION PROCESS  Overview Review process diagram homework practice.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Design Guidance for Low-water Crossing in Gravel Rivers Xing Fang Lamar University.
WEEK 1 You have 10 seconds to name…
Adding SubtractingMultiplyingDividingMiscellaneous.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
PREX Mtg, July 2008R. Michaels, JLAB Warm Septum : Status Septum Team: Kees deJager, Paul Brindza, Javier Gomez, John Lerose, Al Gavalya, & me New Design.
VI-D-15(PP) Disassembly of the Small Engine Figure 1.
Customer Needs Increase Productivity Safety of Machine Minimize Physical Exertion Reduce Downtime Complete through cut of straws on first actuation with.
Time Remaining 20:00.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
SHIELDING STUDIES FOR IDS80 (NO IRON PLUG/YOKE), ADDING SHIELDING IN 75 TO 80 cm (WC/H 2 O, B, Cd). NICHOLAS SOUCHLAS (BNL) Dec. 14, 2010‏ ‏ 1.
Run coordinator report March 23 – 30, 2011 Brad Sawatzky JLab MCC 1:30pm Meeting March 30, 2011 Q weak.
High efficiency work and MBK development for accelerators
News and brief overview of Beamline plans for the next few months
PREX II Vacuum Box, Shielding and Septum Design Status
ELENA electron cooler and SEM grids status
MICE PM Report Progress with the Infrastructure A few problems
HRS at small angles for e+/ e- pair for APEX
Additional Upstream Coil Shielding
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Section 1 (cont.) Power.
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
CLEO II Magnet in Hall A for SoLID
Solve Linear Systems by Adding or Subtracting
PREX / CREX Collaboration Meeting and Status
Adding with 9’s.
Adding with 10’s.
Hall C Dump Status Beam Resuscitation Review
(WBS ) Alan Wootton, LLNL April 24, 2002
Text for section 1 1 Text for section 2 2 Text for section 3 3
Adding ____ + 10.
Adding and subtracting fractions
Province of the Eastern Cape
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Bunker Project Integration/Interfaces
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Text for section 1 1 Text for section 2 2 Text for section 3 3
SC1R Cold Box PDR Assembly Sequence
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
SksMinus status 03 HB meeting 2008/5/02 白鳥昂太郎.
Presentation transcript:

DESIGN STATUS PREX II Alan Gavalya 15DEC14

Existing Design Shielding concept Collimator concept Target concept (Hall C designer)

Existing Design

Remaining Tasks and Challenges Disassembly will drive the design (ALARA) Access within one month desired (Plug collimator) Shielding needs to be supported (Adding weight to existing support) Verify water shielding in vacuum (Dissipate 3 Watts, no leaks) Design new frame to facilitate disassembly and support added weight

Upstream Shielding

Complete Shielding Section View

Shielding Arrangement

Downstream Extension with Collimator and Sieves

Elevation Cut Through Downstream Extension

Carriage Weldment Section

Required Engineering/Design Resource Estimate Engineer 25 MW Designer 45 MW Detail/Drafter 70 MW Total 140 Man Weeks