Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Preliminary Resource Adequacy Assessment for the 2017 Pacific Northwest Power Supply NW Resource Adequacy Forum Technical Committee Meeting August 16 th.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
April Runoff Forecasts for the Columbia Basin and Power Supply Implications Jim Ruff and John Fazio Council Meeting April 14, 2010 Boise, ID.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Power System Research, Inc. Review of the PNW Adequacy Standard Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Loss of Load Probability (LOLP) Project October 16, 2009 Resource Adequacy Technical Committee Meeting.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Interim and Long-term Approaches for Assessing Wind’s Contribution to Capacity Adequacy PNW Resource Adequacy Steering Committee Meeting July 21, 2008.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Wind Power Capacity Assessment Mary Johannis, BPA, representing Northwest Resource Adequacy Forum Northwest Wind Integration Forum Technical Working Group.
2010 Work Plan Steering Committee January 29, 2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
Using the Trapezoidal Model to Derate NW Hydro Capacity Resource Adequacy Technical Committee July 25, 2007 Portland, Oregon.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
2021 Adequacy Assessment Data Requirements Resource Adequacy Advisory Committee Technical Committee Meeting March 18, 2016.
Generation to be Dispatched(GTBD) Analysis For the purpose of discussion only PDCWG/QMWG Joint Meeting 11/02/2012.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Jan 2016 Solar Lunar Data.
Explanation of Monthly Compensation Changes

Steering Committee Webinar March 25, 2016
Average Monthly Temperature and Rainfall
Vetting the GENESYS Model


Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT
SmartMeterTM Steering Committee Update – June 2012

Financial benefits of solar and wind power in South Africa in 2015

HOW TO DRAW CLIMATE GRAPHS
SmartMeterTM Steering Committee Update – July 2012
GENESYS Current Functionality
Pacific Northwest Resource Adequacy Assessment
Technical Committee Meeting January 27, 2012
2021 Adequacy Assessment Status Report
Capacity Analysis in the Sixth Plan
Technical Committee Meeting March 18, 2016
New England Roundtable
Planning Reserve Margin
Technical Committee Meeting March 18, 2016
Steering Committee Webinar March 25, 2016
Progress on Resource Adequacy Assessment for 2017
Resource Adequacy Steering Committee Meeting October 4, 2011
Simulated vs. Real Hourly Dispatch Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Presentation transcript:

Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010

Summary of Interim Results* Last calibration of deterministic metrics was done in 2008 Using 2008 model and data, 2015 summer LOLP is 0% Using current model and data, 2015 summer LOLP is 5.7%** What happened? * Results not for distribution ** Last year’s assessment implied a 5% LOLP (see next slide) July 28, 2010 2

Last Year’s Assessment for Summer Peaking Adequacy Used deterministic metric: Sustained Peak Reserve Margin = 24% Data used STM loads Current non-hydro resources Old 2008 BiOp and hydro peaking Calculated SPRM = 24% Implies a 5% LOLP July 28, 2010 3

Major Changes and Effects* Loads: 2008 used HELM ~ 75% Hydro: Wind reserves, new BiOp, better bypass spill simulation ~ 20% Model: better hydro flex operation, LLH and HLH purchase ~ 5% * These percentages are illustrative only July 28, 2010 4

Monthly Loads Forecast for 2015 using 1929 Temperatures STM HELM Diff Dec 22999 21740 1259 Jan 25984 24799 1185 Feb 20862 24111 -3249 Jul 20469 18344 2125 Aug 21014 18569 2445 Sep 18651 18504 147 Annual 20340 HELM = EPRI’s Hourly Energy Load Model STM = Council’s Short-term Load Forecasting Model July 28, 2010 5

Hourly Peak Loads Forecast for 2015 using 1929 Temperatures STM HELM Diff Dec 28673 26876 1797 Jan 33903 32543 1360 Feb 26109 33046 -6937 Jul 25972 21745 4227 Aug 27029 22168 4861 Sep 22879 22812 60 HELM = EPRI’s Hourly Energy Load Model STM = Council’s Short-term Load Forecasting Model July 28, 2010 6

Hydro Peaking Reduction Compared to 2008 Data (MW)   Peak Hour Duration Period 2-Hr 4-Hr 6-Hr 8-Hr 10-Hr 12-Hr Dec -1423 -1383 -1566 -1564 -1550 -1525 Jan -1561 -1629 -1670 -1591 -1507 -1431 Feb -836 -432 -130 -43 45 110 Jul -2682 -2568 -2244 -2101 -2051 -1965 Aug 1 -2996 -2759 -2236 -2144 -2120 -1961 Aug 2 -3250 -3297 -3423 -3343 -3129 -2912 Sep -1201 -1097 -1047 -1016 -853 -706 July 28, 2010 7

Hydro Peaking Reduction due to Wind Reserve Requirements (MW) Peak Hour Duration Period 2-Hr 4-Hr 6-Hr 8-Hr 10-Hr 12-Hr Dec -19 -149 -404 -387 -365 -325 Jan -64 -186 -406 -407 -393 -341 Feb -192 -274 -512 -509 -472 -416 Jul -41 -169 -255 -321 -318 Aug 1 -36 -295 -316 Aug 2 -227 -652 -951 -942 -820 -669 Sep -33 -444 -699 -778 -742 -612 July 28, 2010 8

Where do we go from here? Complete review of data and model (fall) Report interim results Potential summer peaking inadequacy for 2015 Caveat: the standard is being reviewed Finish Phase II of Forum’s work plan (review of methodology by early 2011) Revise standard, if appropriate (early 2011) Reassess adequacy (June 2011) July 28, 2010 9