One quarter of RFQ vessel + vacuum pumps and supports

Slides:



Advertisements
Similar presentations
ExoMars UV Laser diode thermal vacuum test Alex Rousseau.
Advertisements

H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
بسم الله الرحمن الرحیم MODULATOR & POWER SUPPLY FOR HIGH POWER MICROWAVE TUBE IN LINAC ACCELERATOR.
Status of the SPECTRAP project HITRAP meeting 27 September 2007 by Danyal Winters.
ION PUMP HVFT / Connectors
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
F.E.T.S. RFQ Support Structure by Peter Savage 21 ST October 2009.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
EBIS ARR Andrew McNerney May 4-7, 2010 Hazards and Controls for Electrical, Control, Instrumentation and Conventional Systems.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
RAD hardening Half of dual HV supply or quarter of quad HV supply w breakout Output connector Input connector Ion Pump: RAD area Standard cable RAD-hard.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
ION PUMPS By: Nima Moghimian. Why pump? Why vacuum? What is a good vacuum?
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber.
Developments of the FETS Ion Source Scott Lawrie.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
Block Diagram of a Typical Electric Supply System
Int. to Electrical-Electronics Engineering Asst. Prof. Dr. Alper ŞİŞMAN.
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
AUSTRALIAN NATIONAL UNIVERSITY NUCLEAR PHYSICS DEPARTMENT  14 UD McSNICS ION SOURCE EARTH SAFETY  GASNICS CORONA DISCHARGING ISSUES Gareth Crook.
RAON LEBT Design Yonghwan Kim Institute for Basic Science Yonghwan Kim Institute for Basic Science.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
E4 hall technical specifications
Noise in Cell 12-An example of a calorimeter measurement Simple procedures reduce measurement noise drastically Isolate the probe from the cryostat ground.
F.E.T.S. Mechanical Engineering Update
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Construction and Commissioning of Electronic Test Benches
Construction and Commissioning of Electronic Test Benches
LINAC4 Vacuum Control System Review
Status of the Front End Test Stand April 2007.
XFEL Vacuum System Commissioning
BEPCII RF POWER SOURCE AND INPUT COUPLER
Undulator Vacuum System
A. Freyberg Aug 2016 ECT’16 =>
Test of Booster at UITF Reza Kazimi (12/12/18)
Ion Source and LEBT control system topology, Interlock strategy
Undulator Vacuum System
ISRC and LEBT Vacuum System Design
Mechanical Engineering progress for the Front End Test Stand
Primary Spectrometer & Sample Environment
LEBT water cooling system
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Safety Readiness Review (SRR) Thomas Hansson, ESH
Presentation transcript:

One quarter of RFQ vessel + vacuum pumps and supports

Chopper with vacuum pumps

Section of support frame and alignment bench

4 part RFQ with RF feed and Chopper

Ion source ancillary equipment floating at 75kV 75kV Power Supply, Isolating Transformer and Rack

Plan view of new FETS

Plan view of R8 with new FETS

Position of new FETS relative to existing lead shed HV Cage Lead Shed Trench Position of new FETS relative to existing lead shed

Isometric view of R8 with new FETS

End view of new FETS within lead shed

Isometric view of existing support frame relative to trench

End view of existing FETS in lead shed