Project "Nuclotron M" / NICA

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

1 Nuclotron-based Ion Collider fAcility I.N.Meshkov for NICA Working Group Scientific Workshop Dedicated to The Centenary of V. I. Veksler's Birth and.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
APMP, Belarus Gomel, July 26, Relativistic Nuclear Physics from SPS to NICA O.V. Rogachevsky for NICA/MPD working group.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Peter Paul 12/16/06e-A Collider concept1 Brief History of the e-A Collider Concept Peter Paul BNL/SBU.
The Project NICA/MPD at JINR (Dubna) Search for the Mixed Phase of Strongly Interacting Matter at Nuclotron-based Ion Collider FAcility (1  1.5)·10 27.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
1 Machine Advisory Committee Video-Conference JINR, Dubna May 20, 2009 Concept and Status of The NICA Project Nuclotron-based Ion Collider fAcility I.Meshkov.
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
Stages and milestones of the Nuclotron upgrade Results of the Nuclotron run (#37) Works on coming Nuclotron run (#38) Conclusion Status of the project.
Heavy ion collider facility NICA at JINR (Dubna):
Polarized deuterons and protons at NICA А.Коваленко NICA-SPIN_PRAGUE 2013 Charles University, Prague, July 7-12, 2013.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
A.N.Sissakian, A.S.Sorin Very High Multiplicity Physics Seventh International Workshop JINR, Dubna, September 18, 2007 Status of the project NICA/MPD at.
Status of the Source of Polarized Ions project for the JINR accelerator complex (June 2013) V.V. Fimushkin, A.D. Kovalenko, L.V. Kutuzova, Yu.V. Prokofichev.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
ERHIC design status V.Ptitsyn for the eRHIC design team.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.
TENSOR POLARIZED DEUTERON BEAM AT THE NUCLOTRON Yu.K.Pilipenko, V.P.Ershov, V.V.Fimushkin, A.Yu.Isupov, L.V.Kutuzova, V.P.Ladigin, N.M.Piskunov, V.P.Vadeev,
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
NICA start-up scenario + questions of instabilities A.Sidorin For NiCA team NICA Machine Advisory Committee at JINR (Dubna) October 19-20, 2015.
1 Alexey Sissakian Director, Academician of RAS JINR: Results and Prospects R–ECFA meeting 8 – 10 October, 2009.
A.N.Sissakian, A.S.Sorin Round Table Discussion II Searching for the mixed phase of strongly interacting matter at the JINR Nuclotron: Nuclotron facility.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
1 Polarized Proton Beam Acceleration at Nuclotron with the use of the Solenoid Siberian Snake Yu.N. Filatov 1,3, A.D. Kovalenko 1, A.V. Butenko 1, A.M.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Development of the Nuclotron Accelerator Complex for generation heavy ion beams with an energy of 5 GeV/u (project “Nuclotron-M” – 1 st stage of the NICA/MPD.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
1 PAC for Particle Physics JINR, Dubna January 14, 2010 Status of the TDR for NICA project Nuclotron-based Ion Collider fAcility G. Trubnikov for NICA.
1 NICA Project at JINR Nuclotron-based Ion Collider fAcility I.Meshkov for NICA team September , 2011, Alushta, Ukraine hosted by JINR, Dubna IX.
Itzhak Tserruya Weizmann Institute of Science
Three stages of the NICA project: status and tasks
NICA injection complex status
Heavy ion physics perspectives, Bad Liebenzell, September 2007
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
A. Martynov on behalf of accelerator division.
Status of the Nuclotron-M project
“Electron cooling device in the project NESR (FAIR)"
JINR Experience in SC Magnets
Status of the NICA project at JINR
Status of the beta-beam study
Veksler and Baldin Laboratory
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
of secondary light ion beams
of secondary light ion beams
Global Beam Energy Scan Global Beam Energy Scan
eRHIC with Self-Polarizing Electron Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
FAIR – the Universe in the labororatory
SLHC-PP kick-off meeting, CERN 9 April 2008
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
MEIC New Baseline: Part 10
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Project "Nuclotron M" / NICA Joint Institute for Nuclear Research Development of the JINR basic facility for generation of intense relativistic heavy ion and polarized nuclear beams Project "Nuclotron M" / NICA A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

JINR’s research niche offered by home facilities Heavy-Ion Physics: at high energies (up to 5 GeV/n) (in future sNN = 9 GeV, NICA facility) at low and intermediate energies (5 – 100 MeV/n) Condensed Matter Physics using nuclear physics methods A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 WORLD FACILITIES Facility SPS RHIC NICA FAIR SIS-300 Detector NA61 STAR PHENIX MPD CBM Start (year) 2010 2013-2014 2015-2016 Energy (for Pb-ions) c.m. GeV 4.9-17.3 4.9-50 ≤ 9 ≤ 8.5 Physics CP,OD CP,OD,HDM CP – critical endpoint OD – onset of deconfinement HDM – hadronic dense matter A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 NB

JINR Veksler-Baldin Laboratory of High Energy Physics: Accelerator buildings A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

Existing JINR facility: Nuclotron Nuclotron was put into operation in 1993 and replaced the Synchrophasotron – 10 GeV proton synchrotron that was under operation since 1957 Nuclotron is based on the unique technology of fast-cycled superconducting magnets that was proposed and realized at the laboratory A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

Nuclotron: status 2007 annual operation time was at the level of 2000 hours A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 “NUCLOTRON-M” The project “Nuclotron-M” is considered as the first subproject (SP1) of the JINR future project NICA/MPD ( Nuclotron-based Ion Collider fAcility and Mixed Phase Detector). The NICA/MPD facility is aimed at investigation of the mixed phase formation in strongly interacting nuclear matter at extremely high baryon densities and polarization phenomena in few-body nucleon systems. The extension of JINR research capabilities for generation of intense heavy ion and high intensity light polarized nuclear beams, including design and construction of heavy ion collider aimed at reaching the collision energies of sNN = 49 GeV and average luminosity of 1·1027 cm-2s-1. Different schemes of the NICA were considered by the present time. It was shown, the NICA specified parameters (average luminosity, c.m. collision energy, atomic mass range) can be reached. The main parts of the project are the following: - development, modernization and improvement of the Nuclotron systems, - design and construction of heavy ion injector, - design and construction of heavy ion booster synchrotron and - design and construction of the collider rings. A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

Nuclotron: status and future development The necessary set of R&D, construction and experimental work that should be done for the Nuclotron upgrade is covered by the project “Nuclotron-M”. A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 The main goal of the NICA project is an experimental study of hot and dense nuclear matter and spin physics problems These goals are proposed to be reached by: development of the existing accelerator facility as a basis for generation of intense beams over atomic mass range from protons to uranium and light polarized ions; (1st stage of the NICA accelerator programme: Nuclotron-M) design and construction of heavy ion collider with maximum collision energy of sNN = 9 GeV and average luminosity 1027 cm-2 s-1 (for U92+), and polarized proton beams with energy s ~ 27 GeV and average luminosity > 1030 cm-2 s-1; design and construction of the MultiPurpose Detector (MPD). A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 Layout of the NICA/MPD (2007 ) A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

Subproject SP1.1 “Design and construction of highly charged state heavy ion source based on the “KRION” technology” ( leaders: Е.Е. Donets and Е.D.Donets ) Development of heavy ion source KRION The fist Au32+ ion beams have been obtained in October 2006. Ionization time was 100 ms. The total intensity was of 1.2*109 ions/pulse. General view of the ion source and basic operation scheme. Construction and test of the new ion source with 6 T solenoid within the coming two years is the main goal of the SP1.1. The new important feature of the source is capability of operation at high pulse repetition rate in the case of production heavy ions at intermediate charged states, was considered. U30+ intensity of (4-8)1010 ions/sec is reached in the case of the pulse repetition rate of 5-10 Hz.

The fundamental parameter of a KRION-type source is a factor jτ - product of electron current density and ionization time. The jτ value depends, in particular, on the applied external magnetic field. The maximum magnetic field in the existing ion source dont exceed 3 T. Ionization capability of the source and experimental results have been obtained at test bench are presented Fig. 2. Ionization capability (left plot) and experimental results from the ion source KRION-2 on generation of highly charged state gold ions. Design and construction of the new electron-string highly-charged state heavy ion source KRION-6T aimed at generation of heavy ion beams with q/A up to 0.33 (for example Au65+  Au69+). Study of the electron string phenomenon at different conditions in the source working volume ( magnetic field range up to 6 T, energy of electron beam up to 25 keV). Development and optimization of heavy atoms injection into the string and ion-ion cooling process. The further investigation of tubular electron-string ion source Preparation of the existing source KRION-2 to the next run at the Nuclotron aimed at acceleration of the ion beams over atomic mass range of A ~ 100 ( the last decision is xenon Xe(44+).

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 Design and construction work on heavy ion pre-accelerator chain with injection and extraction beam lines The existing complex will be used for protons, deuterons, polarized deuterons and light ions (Z/A > 0.3). The new heavy ion source KRION-6T, upgrade of pre-accelerators and improvement of vacuum in LU-20 and injection line is supposed within the project “Nuclotron-M”. The limiting charge-to-mass ratio of ion accelerated in the LU-20 is q/A 0.3. As it follows from the SP1.1 sub-project description, the possibility of the KRION-type ion source with the magnetic field of 3 T and energy of the electron beam up to 6 keV (existing version of the source) can provide ion beam of 130Xe44+ , i.e. ions with q/A ≈ 0.34. Thus, it is possible to perform a test acceleration of heavy ion beam with atomic mass of 130 at the Nuclotron after completion of the work on improvement of vacuum in the accelerator chamber. Acceleration of gold ions will be performed after construction of KRION-6T ion source. A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

See presentation by V.Fimushkin at this workshop for more details Design and construction of high intensity polarized deuterons and protons ion source.” The main direction of work aimed at increase of polarized beam intensity at the Nuclotron is connected with the design and construction of the new high current polarized ion source (IPSN) based on the equipment of CIPIOS polarized proton and deuteron ion source from Bloomington The work is carried out in collaboration with INR (Troitsk). The ion source equipment (not completed) was transported to Dubna from IUCF (Indiana University, Bloomington, USA). Some parts of a suitable equipment for the new source were presented from DAPNIA (Saclay). See presentation by V.Fimushkin at this workshop for more details A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

Scheme of the NICA (CDR, January 2008 ) Injector: 2×109 ions/pulse of 238U32+ at energy 6 MeV/u Booster (30 Tm) 2(3?) single-turn injections, storage of 3.2×109, acceleration up to 50 MeV/u, electron cooling, acceleration up to 400 MeV/u Collider (45 Tm) Storage of 15 bunches  1109 ions per ring at 3.5 GeV/u, electron and/or stochastic cooling Stripping (40%) 238U32+  238U92+ Two superconducting collider rings Nuclotron (45 Tm) injection of one bunch of 1.1×109 ions, acceleration up to 3.5 GeV/u max. IP-2 IP-1 2х15 injection cycles A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 1. Circumference, m 224 2. *, m 0.5 3. p/p (1) 110-3 4. Bunch length (), m 0.3 5. Beam emittance (), mmmrad 0.26 6. Bunch intensity (1-2)109 7. Bunches per ring 15 8.Average luminosity, cm-2s-1 for UU: at 3.5 GeV/u at 1.0 GeV/u for pp: at 12.5 GeV dd: at 6 GeV/u 1.11027 6.61025 31031 11031 A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 NICA – Collaboration Joint Institute for Nuclear Research Institute for Nuclear Research Russian Academy of Science Institute for High Energy Physics, Protvino Budker Institute of Nuclear Physics, Novosibirsk MoU with FAIR is under preparation Open for extension … http://nica.jinr.ru A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

The NICA Project Milestones Proposal 2006 • Stage 1: years 2007 – 2009 - Upgrade and Development of the Nuclotron facility - Preparation of Technical Design Report of the NICA and MPD - Start prototyping of the MPD and NICA elements • Stage 2: years 2008 – 2012 - Design and Construction of NICA and MPD • Stage 3: years 2010 – 2013 - Assembling • Stage 4: year 2013 - 2014 - Commissioning • Stage 1: years 2007 – 2009 - Upgrade and Development of the Nuclotron facility - Preparation of Technical Design Report of the NICA and MPD - Start prototyping of the MPD and NICA elements • Stage 2: years 2008 – 2012 - Design and Construction of NICA and MPD • Stage 3: years 2010 – 2013 - Assembling • Stage 4: year 2013 - 2014 - Commissioning A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 The NICA/MPD (2008 ) NEW REALITY: request for 4 collision points (2 for the Mixed Phase Detector (hadron observables and lepton observables) and 2 for spin physics research – more space is needed A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

SOLUTION?: The NICA/MPD (2008 ) NEW REALITY: request for 4 collision points (2 for the Mixed Phase Detector (hadron observables and lepton observables) and 2 for spin physics research – more space is needed SOLUTION?: A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

build the collider facility in the new tunnel? The NICA/MPD (2008 ) NEW REALITY: request for 4 collision points (2 for the Mixed Phase Detector (hadron observables and lepton observables) and 2 for spin physics research – more space is needed SOLUTION?: build the collider facility in the new tunnel? to find feasible option of the collider rings for the existing building? A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

NICA collider facility in the new tunnel The necessary space is available A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

feasible option of the collider rings for the existing building? Superconducting 4.2 T dipoles are necessary for the collider rings, i.e. R&D. A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 Our Laboratory has a long term experience in a superferric 2 T magnets design and operation A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 FAIR: Facility for Antiproton and Ion Research HESR UNILAC SIS 18 Synchrotrons SIS 100/300 Super FRS NESR CR RESR ESR fast cycled SC magnets 100 m New future facility (in red): provides ion and anti-matter beams of highest-intensity and up to high energies http://www.gsi.de/fair/ A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 Nuclotron Dipole – prototype of the FAIR SIS100 magnet Nuclotron Dipole – prototype of the FAIR SIS100 magnet Nuclotron dipole inside cryostat: 1 - yoke end plate 2 - brackets 3 - coil end loop 4 - beam pipe 5 - helium headers 6 - suspension 7 - laminated yoke Superferric design (window frame type) Maximum magnetic field: 2 T, Ramp rate: 4 T/s Hollow superconducting cable Two-phase helium cooling A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 FAIR SIS100 A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008

A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008 Realization of the NICA project at JINR will make it possible to obtain the unique data on the interaction of both as heavy ion and light polarized nuclear beams. The FAIR CBM at SIS300 and MPD at NICA are complementary facilities. NICA A.Kovalenko, SYMMETRIES AND SPIN, Praha, July 20-26, 2008