Water directors meeting London November WGB- State of Play

Slides:



Advertisements
Similar presentations
Spanish PRBs Activities on Reporting CIS phase 2 (2005/2006) WG D DUERO & EBRO River Basin Authorities Stresa, Italy, March 7-8 th 2006.
Advertisements

European Commission - DG Environment Unit D.2: Water & Marine.
WG C Groundwater ad hoc Activity “Groundwater and Climate Change” SCG-Meeting, 10/ Johannes Grath, Balázs Horváth (EC, DGEnv) 1.
Water.europa.eu CIS Activity on CC & Water Guidance ‘river basin management in a changing climate’ SCG meeting 04/05 November 2009 Marieke van Nood/Balazs.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
Draft Mandate Johannes Grath Balázs Horvath (DG Env)
Implementation of the 2009 work programme of the
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
European Commission DG Environment
WG B Progress report Water Directors meeting Mondorf May 20 and 21
New Work Programme and mandates 2005/2006
WG 2.B Integrated River Basin Management
Progress report on activities and outputs of DG eco 1
SW/MW guidance Milestones
Spanish PRBs Activities on Reporting CIS phase 2 (2005/2006) WG D
State of the WFD Implementation Process
State of play of French progress in cost-effectiveness analysis
Plovdiv, Bulgaria 11 th International Conference EURO INBO 2013
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
Improving the SCG added value : Food for thoughts
SSG on WFD and agriculture
Strategic Coordination Group
Water Directors’ Meeting Common Implementation Strategy
Water Scarcity Activity Water Scarcity Drafting group
Meeting of Water Directors WFD Common Implementation Strategy
Activity on environmental objectives and exemptions
GUIDANCE ON PLANNING PROCESS GUIDANCE ON PLANNING PROCESS
Draft Work programme / revised mandate for WG F
Management of Natura 2000 Sites
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
Ad-hoc Activity: Biodiversity and Water Progress Report
WG C Groundwater Progress Report to SCG SCG-Meeting, 07/
Draft Mandate for for the SSG on WFD and agriculture
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
New mandates for Working Groups A, C and D including GIS
Meeting of Water Directors Future Work Programme of the CIS
WG 2.B Integrated River Basin Management
WG C Groundwater Mandate WG C-Meeting, 20/
Research as a new activity of the CIS WG 2B
Pressures and impact : example
Draft mandate on Climate Change and EU water policy
Meeting of Water Directors 2/3 December 2004
Green Paper on Adaptation and
4.1 - SSG on Climate Change and Water Water Directors meeting 24 November 2008 Marieke van Nood, Unit D.2, DG Environment, European Commission Thomas.
Water Directors’ Meeting Working Group D (Reporting) activities
Legal issues in WFD implementation WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
WGB Activity on Information exchange and research needs
EU Water Framework Directive
WFD and Agriculture Activity under the CIS 2005/2006 Work Programme
WG 2.9 Best Practices in River Basin Planning
Integrated Testing in Pilot River Basins
SCG Meeting Brussels, 18 February 2005
Lessons learned from WFD reporting and follow-up
WGB Activity on Information exchange and research needs
CIS work programme Supporting the implementation of the first river basin management plans Water Directors' Meeting 30 November and 1 December.
SCG Meeting Brussels, 18 February 2005
WG Integrated Testing in Pilot River Basins
Water directors meeting London November WGB - CEA activity
7.e) Expert Group on agriculture
WG 2.9 Best Practices in River Basin Planning
Water Science-Policy Interface (CIS-SPI) Progress report
JRC-Institute for Environment and Sustainability
Concept paper on the assessment of WFD River Basin Management Plans
Scope and Outline of Policy Document
UWWTD SIIF 2nd Workshop 24 October 2013
WG A Ecological Status Progress report October 2010 – May 2011
Water Director's Meeting December 2013, Vilnius DG Environment
Water Scarcity Drafting Group (DG) Working Group B plenary meeting Brussels, April 19th 2005 Progress Report 1 Dicembre 2004.
Thierry davy Representative of the french water agencies
Environmental Objectives and Exemptions State of Play
Presentation transcript:

Water directors meeting London November 28-29 WGB- State of Play Jean Claude Vial French Ministry for Environment

WGB Activities 2005-2006 WG B mandate focuses on four activities :  Pilot river basins, WFD key issues and research needs,  Cost-effectiveness,  Water scarcity.

WGB Next step Each activity has produced a draft document A small group of WGB has drafted a paper on RBMP WGB propose to hold a workshop on RBMP first semester 2006 Germany and France have proposed to organise this workshop in common

WGB Next step The workshop will allow exchanges on RBMP A link must be established with WGD on the issue of reporting for RBMP WG D will be closely associated to the workshop There is a need to keep a consistency between RBMP content and RBMP reporting