Action from Workshop 3 – SUB010

Slides:



Advertisements
Similar presentations
Trades and Transfers Activity to Date. 2 Introduction  Trade and Transfer functionality added to RMSEC auction (renamed RMTTSEC) from July, applying.
Advertisements

Discretionary Release Interruptible Entry Capacity 1st November 2007.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
A study into the benefits which storage facilities may provide to the UK gas transmission system Nick Wye Presentation to NTS Charging Methodology Forum.
Gas Customer Forum Transmission Update Chris Logue 9 th July 2007.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Entry Capacity Substitution Workshop 5 – 5 th December 2008 Review and Options for Development.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Entry Capacity Substitution Workshop 8 – 7 th April 2009.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
A GAS FLOW MODEL FOR THE NTS NETWORK MELVIN BROWN CLAUDIA CENTAZZO JOGT Meeting, London, 5 June 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Review Group 221: Option 3 – security provided after allocation.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
September 2008 QSEC auction - Allocations Transmission Workstream
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Entry Capacity Substitution Workshop 6 – 7 th January 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Trades and Transfers Workshop, 6 th November 2007.
Transfers and Trades Special Transmission Workstream
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Modification 0607S: National Grid NTS Actions Update
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Workstream, 2nd March 06
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
UNCTAD, World Bank and IMF Workshop Geneva, February
UNCTAD, World Bank and IMF Workshop Geneva, February
DRSEC Update August 4th 2009.
Incentives 26 September 2018.
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Update on Exit Capacity Substitution and Revision
THE MTDS DOCUMENT Joint UNCTAD, IMF and World Bank MTDS Workshop
Entry Capacity Substitution
Modification 501 slides for Workgroup
Flow Swap Scenarios – Agreed Logic
Updated information - Hornsea
Review of Trade and Transfer Winter 09/10
Baseline Re-consultation
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Impact of SOQ Reduction
ASEP Allocation Graphs
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Entry Capacity Transfers - Constrained Period
Gas Customer Forum 28 July 2008
Presentation transcript:

Action from Workshop 3 – SUB010 National Grid NTS to rework the Easington scenario on the assumption that an exchange rate cap of two existed. Results from scenario presented at workshop 3 Revised obligated levels Easington: 139.9 mscmd (previous obligated + 10) Donor ASEPs: Reduced where capacity substituted away Aldbrough 38.8 mscmd (no change) Hornsea 20.6 mscmd (minus 0.9) Hatfield Moor 1.5 mscmd (minus 0.8) Theddlethorpe 7.3 mscmd (minus 49.2) Bacton 123 mscmd (minus 41.7) Teesside 44 mscmd (no change)

Action from Workshop 3 – SUB011 National Grid NTS to calculate SO revenue impacts per 1 mscmd of new ASEP capacity as a consequence of each of the projects outlined by JBa. Assessment undertaken for 10 mscmd. ASEP Notional ASEP used for defining revenue driver Driver / £m per GWh/day/month   Total £ first 25GWh 25-100 GWh 100-400GWh per month per year Whitehill Garton 0.0021 0.0049 £250,833 £3,010,000 Saltfleetby Theddlethorpe 0.0016 £57,500 £690,000 Bletchingley Bacton / Grain average 0.00275 0.00415 0.0055 £425,833 £5,110,000 Portland 0.0102 0.003 0.0108 £570,000 £6,840,000 Baines Barrow 0.0037 0.0014 £215,000 £2,580,000 Notes: The revenue drivers used are illustrative only and should not be taken as indicating National Grid's expectation of actual values, which are to be agreed between National Grid and Ofgem if/when a project proceeds. Calculations ignore any indexation effects detailed in the Licence; C8D para 2(a) and 2(c) table 2. Revenue Drivers taken from Licence C8D para 2 (c) table 3.