Dr. Proscovia Namuwenge Senior program Officer Tbhiv- moh

Slides:



Advertisements
Similar presentations
Washington D.C., USA, July 2012www.aids2012.org A National Program Manager’s Perspective on HIV/TB Integration Dr Owen Mugurungi Director – AIDS.
Advertisements

World TB Day 2011 March 24, 2011 Mavuso Centre Manzini – Kingdom of Swaziland.
PATH Tanzania TB, TB/HIV Project & IPT in the Private Health Sector PATH Tanzania TB, TB/HIV Project & IPT in the Private Health Sector East African Health.
Rapporteur: Dr. Massimo Ghidinelli Facilitator: Dr.Elvira Teodora Wi
The Implementation of the WHO Asia Pacific Treatment Metrics Dr. YU, Dongbao WHO Regional Office for the Western Pacific 20 July, 2014 Antiretroviral Treatment.
Integrating TB into PWID Services in Indonesia The Works in Progress Dr Siti Nadia, NAP Manager; Dr Dyah Erti Mustikawati, NTP Manager Melbourne AIDS Conference.
Nationwide scale-up of TB/HIV collaborative activities in Ethiopia Yibeltal Assefa, MD, MSc Head, Health programs Department TB/HIV core group Addis Ababa.
Downloaded from Accelerate scaling up of TB/HIV activities in Tanzania Dr. N.G.SIMKOKO WHO/NTLP - Tanzania.
Isoniazid preventive therapy for people living with HIV: Public health challenges and implementation issues Peter Godfrey-Faussett UNAIDS (with thanks.
FHI’s Global ART Program: Today's snapshot and tomorrow's vision 10 August 2010 Kwasi Torpey, MD, PhD, MPH Regional Senior Technical Advisor, FHI 8 th.
6 th Biannual Joint HIV Sector Review Meeting Nov 11-13,2014 Ministry of Health and Social Welfare Mwanaisha Nyamkara, NTLP Werner Maokola, NACP Nov 11,
TB/HIV in the South-East Asia Region From Mekong to Bali: The scale up of TB/HIV collaborative activities in the Asia Pacific August 8-9, 2009 Bali, Indonesia.
Implementing the revised TB/HIV indicators and data harmonisation at country level Christian Gunneberg MO WHO Planning workshop to accelerate the implementation.
TB/HIV COLLABORATION IN GHANA Dr. Nii Nortey Hanson – Nortey National TB Control Programme Accra.
From Mekong to Bali: The scale up of TB/HIV collaborative activities in Asia- Pacific, August 8-9, 2009 Denpasar, Bali, Indonesia "TB/HIV Monitoring and.
The revised TB/HIV indicators and update on the process of harmonization Christian Gunneberg MO WHO The 14th Core Group Meeting of the TB/HIV Working Group.
Haileyesus Getahun Stop TB Department WHO Re-conceptualizing ICF and IPT: global progress to date 14 th Core Group Meeting of the TB/HIV Working Group,
May Maloba, CCSP Coordinator August 10,  FACES CCSP overview  Program emphasis  Screening protocols  M & E  Achievements  Challenges.
Update on main achievements Programmes of Rounds 1 and 6 supported by the Global Fund 14 th General Meeting of Stakeholders 23 May th General Meeting.
Use of Routine Feedback Reports to Site and District Staff in Cote d’Ivoire Hermann Brou Annual Meeting, M&E satellite meeting Johannesburg, July 28, 2010.
Scale up TB/HIV activities in Asia Pacific 8-9Aug09 1 TB/HIV collaborative activities in Thailand Sriprapa Nateniyom, M.D. TB Bureau, Department of Disease.
Collaborative TB/HIV activities Update on Progress Diane V. Havlir 13 th TB/HIV Core Group meeting April 17-18, 2008 New York, USA.
HIV TESTING AND EXPANSION OF ART FOR TB PATIENTS, BOTTLE NECKS CHALLENGES AND ENABLERS FOR SCALE UP IN KENYA DR. JOSEPH SITIENEI, OGW NTP MANAGER - KENYA.
Intensified TB case finding and infection control in Tanzania – opportunities and challenges Denis Tindyebwa Technical Director EGPAF Tanzania.
Challenges of Intensified TB case finding among PLHIV : Kenyan experience Dr. J. Sitienei Ministry of Health Kenya.
Challenges of ICF among PLHIV and how to move forward G J Churchyard 17 th April th Core Group Meeting of the TB/HIV Working Group New York.
Progress toward COP 12 targets DRC October
HHS/CDC Track 1.0 Transition in Rwanda Dr Ida Kankindi, Rwanda Ministry of Health Dr Felix Kayigamba, CDC-Rwanda August
Improving HIV care and support service performance in Côte d’Ivoire M. N’goran 1 ; S. Ramachadran 2 ; J. Essombo 1 et al M. N’goran 1 ; S. Ramachadran.
1 NAME: TITLE:DATE:. 2 “One stop shop” for TB and HIV services improved initiation of antiretroviral therapy (ART) for co-infected patients in Eastern.
Thailand experience in implementing collaborative HIV/TB activities Anupong Chitwarakorn, MD Ministry of Public Health, Thailand TB/HIV Satellite symposium.
The CQUIN Learning Network: Partnering to Advance Differentiated Care
DR. THOMAS OGARO, MBCHB, MPH, PhD
HIV PROGRAM DATA REVIEW MEETING 29th-30th May 2017
Ukraine (from WHO November 2016 consultation)
Addressing the challenges and successes of expediting TB treatment among PLHIV who are seriously ill: experience from Kenya Masini E & Olwande C National.
2013 NTP MANUAL OF PROCEDURES Reporting
Facility Community Linkages
Zimbabwe’s shift towards treat all: national country context
Implementation of the WHO recommended three I’s for TB infection prevention; Evidence from HIV service delivery points of PHCs in Nigeria Amara F. Chizoba.
Tolerability of Isoniazid Preventive Therapy (IPT) in an HIV infected cohort
Progress in Implementing collaborative TB/HIV activities
Dr. Kathure, Weyenga and Langat
A COLLABORATIVE APPROACH TO ESTABLISH PREDICTORS
8-9 August 2009, Bali, Indonesia
Monitoring the implementation of the TB Action Plan for the WHO European Region, 2016–2020 EU/EEA situation in 2016 ECDC Tuberculosis Programme European.
World Health Organization
Pre-conference Meeting Report
Sunday, 22 July, 07:30-20:00 Room Elicium 1, RAI Amsterdam
Scale up of collaborative TB/HIV activities in Kenya
Progress in Implementation of TB/HIV Collaborative activities
Tolerability of Isoniazid Preventive therapy Among HIV infected Cohort in Nigeria Folajinmi Oluwasina Strategic Information Unit AIDS Healthcare Foundation,
Enablers for nationwide expansion of collaborative TB/HIV activities
Screening and diagnosing TB in PLHIV: Challenges and ways forward
From toward HIV Elimination with Boosted-Integrated Active HIV Case Management (B-IACM) in Cambodia Dr. Penh Sun LY, Director, NCHADS Presented.
Integrating TB and HIV care services – Malawi Experiences
TB LAM IMPLEMENTATION IN UGANDA
VL-EID-TB Performance
TB/HIV COLLABORATION IN UGANDA
Dr. Kenneth L. Chebet Director NASCOP/NLTP Division Kenya
South Africa: From ProTest to Nationwide Implementation
From ProTEST to Nationwide Implementation
Routine Counselling and HIV testing (CT) for TB patients in Malawi: Rhehab Chimzizi TB-HIV Programme officer National TB Control Programme-Malawi.
Collaborative TB/HIV activities 2011 Tables, Graphs & Maps
Current status – (1) Achievements Building strong political commitment
5th edition NTP MANUAL OF PROCEDURES Reporting
KATUREEBE CORDELIA, MBchB, MMED Pead
DSD and TB/HIV services in Zimbabwe
VL-EID-TB Performance
HIV Recency Testing in Rwanda
Presentation transcript:

Dr. Proscovia Namuwenge Senior program Officer Tbhiv- moh TBHIV DATA REVIEW Dr. Proscovia Namuwenge Senior program Officer Tbhiv- moh

TBHIV Cascade FY 2017/18: Identifying HIV among TB cases

HIVTB Care Cascade FY 2017/18; ICF IN HIV CLINICS

Question Is it true that in HIV clinics so many TB cases are diagnosed and few are initiated?

observed Errors in Tbhiv indicators DQAs of TB status data to improve quality (reduce pen screening)

Buikwe; Tbhiv data quarter January to march 2018 Three facilities reported 2001 out of the 2072 TB cases in this qtr

Bulambuli; Tbhiv data quarter January to march 2018 One facility reported 2371 out of the 2379 TB cases in the qtr

What needs to be done Quarterly data review meetings Performance reviews Continue conducting DQAs while paying attention to the TBHIV data elements/indicators

Tbhiv updates MOH HAS received isoniazid 100mg sufficient for all PLHIV 0-14 years & under-5- year contacts of PBC TB patients It is scheduled to receive isoniazid 300mgs sufficient for 500,000 PLHIV >15years and above by Dec  2019  

Isoniazid 300mg stock status

Isoniazid 100mg stock status

Pyridoxine stock status

Tb prevention; enrollment Jan to Mar 2018 Apr to Jun 2018 106a Pre-ART No. of clients started on INH Prophylaxis during the reporting quarter Central Region 1278 1772 Eastern Region 711 645 Northern Region 312 519 Western Region 488 489 MOH - Uganda 2789 3425 Expcted = 17893 Achievement Jan to Jun = 6214, shortfall =11,679 (65%)

Challenges of ipt Enrollment is still low Reporting rates still low, e.g. 1107 started on INH in July and so far only 23 reported in August Completion rates are low

Ipt Scale up plan 469 health units with 568,572 PLHIV new & active on ART are implementing the surge strategy to mop up the remaining PLHIVS The same health units to be targeted and supported in phases to intensify IPT implementation Required; strengthened monitoring to ensure that 500,000 PLHIV are enrolled & complete on IPT by Dec 2019