LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.

Slides:



Advertisements
Similar presentations
WELCOME TO THE TECHNICAL PRESENTATION OF SC100 1.
Advertisements

SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Wrap-up. Fieldbus Benefits n Engineering n Installation n Operation n Maintenance.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Installation Package - Electrical
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Cryogenic Plant Controls - Configuration
Director’s Progress Review Closeout Meeting
Cryoplant Installation Cost and Schedule Installation PDR
Cryoplant Controls Installation
Cryogenic Plant Controls – Cost and Schedule
4.5 K Cold Box Schedule Recovery Directors’ Review
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Cryogenic Plant Electrical and Controls
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
2K Cold Box PDR Introduction
Cryoplant Installation Overview
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
Cryoplant Installation Package - Mechanical
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LCLS-II 2K Cold Box Controls Design Review
Overview of Mechanical Design
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Welcome to the Controls FDR!
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Cryoplant Controls Readiness to Procure
Status of the cryogenic system for B180
2K CB FDR Overview:  Agenda, Charge, Review Process
2K Cold Box Process Design
2K Cold Box Mechanical Design
2K CB FDR Conclusion:  Project Summary, Procurement Plan / Status
2K Cold Box Internal Piping Flexibility Analysis
SC1R Cold Box PDR Controls
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
Cryogenic Plant Controls – Safety Switches
Pressure Piping Analysis
Cryoplant Installation Design Summary
2K Cold Box Cost, Schedule & Staffing
2K Cold Box Cost, Schedule & FDR Summary
Charge 2. Equipment Protection 3. Definition and Documentation
Scope, Requirements Deliverables & Schedule
Documentation Chris Scanlon and Ritendra Bhattacharya
Overarching Commissioning Plan
Operator Training Requirements
Testing Plan and Status
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
CryoPlant Commissioning
DOE Review 7-9 February, 2006 Steve Lewis
Onsite Training at JLab
DOE Review of the LCLS Project 7-9 February 2006
ESR2 Cryoplant Utilities
SNS PPU Cryomodule Instrumentation
Presentation transcript:

LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017

Related Reviews (1) (includes controls) Supportive Procurement Specifications: ( i.e. reviewed and approved separately as part of the subsystem) Subsystems: Warm Helium Compressors Helium Purifier 2K Cold Compressors 2K Cold Box (pending) 4.5K Cold Boxes 4160V Motor Control Centers Recovery Compressors Guard Vacuum Pump Skid Includes: Standard specification list of acceptable control devices Adheres to P&ID instrumentation diagrams Adheres to engineering standards (Jlab/SLAC/Nationally Recognized) Controls used in approved subsystem reviews follow those of this review LCLSII Cryoplant Controls FDR Sept 13, 2017

Related Reviews (2) (includes controls) Cryoplant Installation Review FDR (completed) Includes: Control cabinet access and clearance Control field locations Wiring diagrams Control panel layouts Supplied and GC procured controls list Emergency/Stop switches LCLSII Cryoplant Controls FDR Sept 13, 2017

Peer Reviews Designs reviewed by Matt Cyterski and Joe DeLong Recommendations have been evaluated and incorporated into the design for the FDR LCLSII Cryoplant Controls FDR Sept 13, 2017

Lessons Learned from Past Projects/Operations Controls are a very important design aspect of the plant Includes: Common proven operational reliable & accurate instrumentation and controls between vendors of the cryoplants Nationally recognized components and assembly design Workmanship of work Parts list, assembly and wiring documentation LCLSII Cryoplant Controls FDR Sept 13, 2017

Current FDR is for the balance of controls Summary Control components have been selected which are proven to be reliable, accurate and cost effective from lessons learned from previous designs and operation Much of the full cryoplant controls are consistent with associated with separate subsystem procurement and FDR reviews Current FDR is for the balance of controls LCLSII Cryoplant Controls FDR Sept 13, 2017

May I answer any questions? LCLSII Cryoplant Controls FDR Sept 13, 2017