Sami Repo Tampere University of Technology FINLAND

Slides:



Advertisements
Similar presentations
Econnect Ltd Independent specialists in the grid integration of renewable energy...
Advertisements

Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Smart Grids for Future City May Mln Clients 45 Mln Smart Meters 30 Countries 96 GW Installed Capacity 2.
Simon Gamble Manager Hybrid Off-Grid Solutions Running a power grid with 100% renewables on King Island, Australia.
EE369 POWER SYSTEM ANALYSIS
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Turkish Power System Overview March 2012
ABB Switzerland Ltd. Christoph Haederli
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Electrical Resistance and Ohm’s Law Electric circuits are used to convert electrical energy into some other form of energy we need.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Frankfurt (Germany), 6-9 June 2011 Simone Botton, Fabio Cazzato, Marco Di Clerico, Domenico Di Martino, Federico Marmeggi – Enel Distribuzione SpA Simone.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Power Quality Assessment on Wind Energy systems Presented By vivek kumar(pe610)
Page 1J. Hourtoule, Electricity contract: scope and forecasted consumption, 16/07/2015 © ITER Organization Electricity Supply Contract: For the ITER Site.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
Frankfurt (Germany), 6-9 June 2011  In the future, traditional fuse based over- current protection of LV networks will not be applicable for LV microgrids.
Renewables and System Services Ann Scully.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Steady State Analysis Of A Microgrid Connected To A Power System
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
Distribution Systems-General
Department of Electrical Engineering
Frankfurt (Germany), 6-9 June 2011 Jukka Lassila – Finland – Session 6 – Paper 0773 Network Effects of Electric Vehicles Case from Nordic Country LUT Jukka.
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
DISTRIBUTED GENERATION ISSUES Technical Issues Non-Technical Issues.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
MULTI-MICROGRIDS AS A SMART STRUCTURE Carlos Moreira Ciência 2010 –
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
YEL WIND POWER PROJECT. YEL WIND POWER PROJECT.
Astrit BARDHI Myrteza BRANESHI Thomaq KOBLARA Marjola PUKA
Protection of Power Systems
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
I. CVETKOVIC, D. BOROYEVICH, R. BURGOS, C. LI, P. MATTAVELLI
IG BASED WINDFARMS USING STATCOM
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Power Generation and Distribution
RfG – Fast Fault Current Injection Update
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Sustainable Energy Planning for Autonomous Power System of Crete
EE6501 POWER SYSTEM ANALYSIS
Strategic planning for Nablus power system
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
EU-IPA12/CS02 Development of the Renewable Energy Sector
Distributed Generation (DG) Modeling Criteria
Paris distribution system
CMPLDWG Composite Model with Distributed Generation Approval
HVDC Transmission Systems:
Paper 5.57 INFORMATION SYSTEM SOLUTION FOR RELIABILITY BASED ANALYSIS AND DEVELOPMENT OF DISTRIBUTION NETWORKS P. Verho, P. Järventausta, A. Mäkinen, K.
Exercise Session 3 Power systems.
DISCRETE ASCENT OPTIMAL PROGRAMMING APPLIED TO NETWORK CONFIGURATION IN ELECTRICAL DISTRIBUTION SYSTEMS B. A. Souza H. A. Ferreira H. N. Alves.
Utilizing the ring operation mode of MV distribution feeders
CMPLDWG Composite Model with Distributed Generation Approval
Ilkka Jokinen Taavi Heikkinen
The Global Forum Electricity Ancillary Services and Balancing | Berlin, SmartNet Pilots: The demonstration of the different TSO-DSO coordination.
Its strengths, your benefits
MA DG Collaborative – Year 1
Presentation transcript:

Sami Repo Tampere University of Technology FINLAND A method to increase the integration capacity of DG on weak distribution network Sami Repo Tampere University of Technology FINLAND

Problem of weak distribution network Weak medium voltage (MV) network length of 20 kV feeders may be 100 km demand in sparsely populated areas is very low => impedance of feeders may be remarkably high Integration of DG is limited by voltage rise problems may occur during low demand periods acute in coastal and skerries areas due to wind power installations

Proposed method to increase the integration capacity of DG units 1. Meshed operation of distribution network MV networks are constructed meshed for reasons of reliability, but operated radially 2. Control of DG unit active and reactive power based on terminal voltage at the case studied consumption of reactive power is used to limit the voltage rise problem when necessary the production of active power must also be limited, if this is not enough

Meshed operation of MV network will divide power flows to the feeders more evenly than radial operation losses will be minimised voltage rise due to DG can be limited may allow more enhanced control and operation principles than today should be taken into account in most potential areas of DG in long-term planning studies

Protection of meshed MV network When a fault occurs the task is to indicate and locate the faulty ring (see session 3 paper 25) Ring is opened using fast switch-disconnectors Conventional feeder protection may operate The amount of load interrupted due to the fault is the same as in a radially operated network Extra delay must be allowed for in the protection

Studied distribution network

Study case data Wind power units: connected 22 km away from HV/MV substation 4*750 kW frequency converters power factor control between 0.92 - 1.00 ind. or cap. Network data: Upper limit of MV voltage is 21 kV Maximum production capacity is 1.1 MW Loads: real hourly load curves and customer data (annual energy and customer type)

Network transfer capability

Energy production capability - initial data

Energy production capability - test results Radial Ring

Conclusions Integration capacity of DG on weak MV network may be increased by proposed method no centralised control system or operator interaction is needed to operate the network it may be concluded by DG unit terminal voltage Requirements of the method are possibility to operate network as a ring with fast switch-disconnector to control active and reactive power of DG unit

Practical issues Possibility to control the integration capacity should be considered in interconnection contract Proposed method is quite different from the "minimum load maximum production" planning principle because the integration capacity is flexible and dependent on network conditions Further research is needed to clarify impacts on power quality and to extend studies to more complex systems

Thank you! Please visit www.tut.fi/~repo/pub.html to have a full version of the paper (several lines are overlapped with a figure at CD).