ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002

Slides:



Advertisements
Similar presentations
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
Advertisements

Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
International Civil Aviation Organization
ITU-R Working Party 8D Status Update Inte rnational Civil Aviation Organization Regional Preparatory Group (RPG) Meeting for World Radiocommunication Conference.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
International Civil Aviation Organization
To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International.
To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International.
FAA’s Plan for the Future Use of GPS Briefed By: Kanwaljit S. Sandhoo (MITRE/CAASD) 8th European CGSIC/IISC Meeting, Prague December 2-3, 1999.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
CAR/SAM GNSS/ATN SeminarFrequency planning criteriaPage 1 GROUND BASED AUGMENTATION SYSTEM Frequency Planning Criteria Presentation GNSS 3.3 by Christophe.
International Civil Aviation Organization WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS Presentation GNSS 1.1 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
Date of submission : 20 – 11 – Day of submission : Sunday. Grade : 11. Section : 51. Group names :  Maitha Ali.  Salha Salem.  Rafeea Ali. Physics.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
Vulnerability Assessment of the Infrastructure that Relies on the Global Positioning System (GPS) 13 th ITS World Congress and Exhibition 9 October 2006.
GPS Vulnerability Assessment CGSIC International Sub-Committee Meeting Melbourne, Australia February 10,   CAPT Curt.
GPS POLICY AND PLANNING Mr. Joe Canny US Department of Transportation Presented at IISC Meeting December, 1999.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
International Spectrum Management and Interference Mitigation
CEPT position on WRC-12 AI’s 1.3, 1.4, 1.7, 1.12 and 1.25
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
WRC-19 – Agenda Items for Other Issues
FAA NAVAID Rationalization / Resiliency Overview
Harvey Gabriel LEKAMISY
Impact of WRC-15 Outcomes on Sub-Saharan Africa
ICAO Position for ITU WRC-15
Gerhard Mayer & Darrell Ernst ETTC 2007 Toulouse
WRC Agenda Item 1.1 to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands.
PROPOSED AMENDMENT TO THE DRAFT ICAO POSITION FOR THE INTERNATIONAL TELECOMMUNICATION UNION (ITU) WORLD RADIOCOMMUNICATION CONFERENCE 2015 (WRC-15) APAC.
Spectrum issues and challenges, not on the specific agenda for WRC-19
ITU Working Party 8B Activities
VDL Mode 3 Cosite Interference Testing Summary
Loftur Jónasson, ICAO 11 March 2013
WRC Agenda Item 1.1 to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands.
SPECTRUM REQUIREMENTS FOR FUTURE AERONAUTICAL MOBILE (ROUTE) SYSTEM - AM (R )S ( Presented by Christian Pelmoine /Dale Stacey, Eurocontrol.
Concept of ADS-B via Satellite
Resolution 606 Interference from RNSS to radars in the 1215 – 1300 MHz band Philippe GERARD Agence Nationale des Fréquences Mars 2001 AMCP.
ICAO Position for ITU WRC-15
International Civil Aviation Organization
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional Preparatory Workshop for the ITU WRC-2015
WRC Agenda Item 1.1 to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands.
Frequency Assignment Planning
Criteria for spectrum sharing
SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
SADC WRC-15 Preparatory Meeting
International Civil Aviation Organization
International Civil Aviation Organization
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
13th ITS World Congress and Exhibition 9 October 2006
Aeronautical Spectrum Management
Frequency Assignment Planning
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
SADC WRC-15 Preparatory Meeting
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
François Rancy Director, ITU Radiocommunication Bureau
Draft ICAO Position for ITU WRC-15
World Radiocommunications Conference
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Frequency Management Group Chairman
International Civil Aviation Organization
Draft ICAO Position for ITU WRC-15
Presentation transcript:

ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO

GNSS spectrum allocations Current allocations New allocations to support system enhancements and expansion Compatibility issues

FREQUENCY BAND 1559 – 1610 MHz (ARNS/RNSS) GNSS F1 signals (GPS L1, GLONASS L1, GALILEO E1/2) Total band 1559-1610 MHz is required for current and future GNSS Sharing with other services will cause unacceptable degradation and restrictions on GNSS elements Additional allocation to Fixed Service (some States in Europe, Middle East, Asia and Africa) continue to exist: On a primary basis until 2005 (or 2010) On a secondary basis until 2015

Frequency Band 960 – 1215 MHz (ARNS, RNSS) RNSS allocation as of WRC-2000 GNSS F2 frequencies Sharing with DME on 1164 – 1215 MHz frequencies Compatibility issues: DME to be protected GNSS F2 signals to operate in DME environment Out-of-band (Radiolocation above 1 215 MHz) interference

Frequency band 1215 – 1300 MHz (Radiolocation, RNSS) No aeronautical allocation GPS L2, GLONASS L2, GALILEO E6 Used by SBAS reference receivers Compatibility issues Radiolocation to be protected No protection for RNSS on a global basis

Frequency band 108 – 117.975 MHz (ARNS) GBAS VDL Broadcast Sharing with VOR and ILS Compatibility issues: VOR, ILS to be protected VDL Broadcast: To operate in VOR, ILS environment Not to impose additional restrictions in adjacent bands (FM Broadcast below 108 MHz, Aeronautical Mobile above 117.975 MHz)

GNSS vulnerability aspects GNSS signals’ vulnerability is generally recognized Issues to be addressed: Interference cases and resulting threats Operational impact Mitigations

Interference cases Unintentional vs intentional In-band vs out-of-band On-board sources Natural phenomena

Intentional interference Jamming Threat is valid Risks and impacts vary significantly Most mitigation options are suitable Spoofing Extent of threat appears to be low Airborne collision avoidance, situation awareness and separation assurance capabilities are potential mitigation aids Other mitigation options are also suitable

Unintentional interference GNSS F1 signals in 1 559 – 1 610 MHz band Fixed service (not compatible) Mobile satellite communications (compatibility standards exist) GPS, GLONASS, GALILEO signals above 1 215 MHz RNSS/Radiolocation Service compatibility (studies under way)

Unintentional interference (cont’d) GNSS GBAS in 108 – 117.975 MHz band VOR (compatibility criteria available) ILS (compatibility criteria being developed) Aeronautical VHF Communications (compatibility criteria being developed) FM broadcast (compatibility criteria available) Envisaged VDL Mode 4, if allocated by WRC-2003 (compatibility studies under way)

Unintentional interference (cont’d) GNSS F2 signals in 1 164 – 1 215 MHz band Designed to be compatible with ARNS Compatibility problems in DME high density areas (core Europe, US, Japan) On-board compatibility Compatibility standards exist Addressed through aircraft systems integration

Natural interference sources Ionospheric effects Storms Model anomalities Scintillations impacts Other (heavy rainfalls?)

Operational Impacts Effects of interference to be assessed taking account of: Traffic density Navigation infrastructure Surveillance system

Mitigations Spectrum management, coordination and interference monitoring Use of alternative navigation means Procedural methods Contingency planning

Work towards WRC - 2003 Promote cessation of fixed services in the 1559-1610 MHz band as early as possible Finalize compatibility criteria and assessment methodology for RNSS in the 1164-1215 MHz band Formalize GBAS operation in 108 – 117.975 MHz band

Conclusions Global coverage and performance to support all phases of flight are dependent upon resolution of spectrum issues States to ensure freedom of RF interference when approving GNSS operations Interference threats to be assessed and mitigation strategy to be developed as a part of GNSS implementation planning