MOD0166 – Reform of the NTS Offtake Arrangements Shipper Perspective

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

Review Group 0166 Review of Necessary Reform of NTS Offtake Arrangements 20 th September 2007 Beverley Grubb SGN.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Modification Review Proposal 0166 Review of necessary reform of NTS Offtake Arrangements Thursday 6th September 2007.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
1 Review Group 166 Review of necessary reform of NTS Offtake Arrangements Exit reform from an interconnector perspective Avian Egan 20 th September 2007.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Workgroup meeting October 2014
Conclusions STC Core Group 8 September 2009 The Hague
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Review Group 291- Ofgem Update
Transmission Workgroup 7th July 2011
Transmission Workstream, 01 October 2009
Transmission Workstream, 6 August
Proposer: National Grid NTS Panel Date: 17th April 2014
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Allocation Mechanisms
NTS Entry Charging Review Update
Capacity Methodology Statements
Transmission Workgroup June 7th 2012
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
Draft Capacity & Connection Plan
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Transmission Workgroup 6th March 2014
MOD0166 – Reform of the NTS Offtake Arrangements Storage Perspective
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
Review Group 0175: DM Supply Point Emergency Arrangements
Long Term Non Firm Capacity Update
Review Group 291- Ofgem Update
Meeting Friday 13th September 2013 Hayley Burden
Transmission Workstream – Partial Assignment
Review Group /09/2007.
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Mark Freeman 29th January 2007
Reinstatement of NTS Interruption
Information Provision for Transitional Exit Capacity
Workgroup meeting October 2014
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Transmission Workstream 1st February 2007
Stefan Leedham Transmission Workstream 2nd November 2006
Review Group 221: Review of Questions from Session 2
195AV “Future work” – system flexibility
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Presentation transcript:

MOD0166 – Reform of the NTS Offtake Arrangements Shipper Perspective Mike Young (British Gas Trading) Thursday 20 September 2007

User Commitment Extent of User Commitment required n years capacity charge 50% project cost Duration of User Commitment required 1 year (ARCA) 4 years (0116V etc.) Staged User Commitment in line with project development and investment Identical process for incremental and new connections? Potential impact of Under/Over recovery (TO Commodity)

Management and monitoring of linepack depletion What is being measured? Linepack depletion Flexibility Is 16/24 fit for purpose in demonstrating stress on system? Mechanisms for measurement and reporting Analysis of observation Trigger for consideration of further measures

Arrangements for Interruption Universal Firm on NTS? Long-Term Interruptible contracts EU obligation satisfied? How much Interruption is required by NGG? Mechanism for allocation of necessary interruption Buy-back Parallel to Modification 0090