Role and Responsibility for Quality Assurance Vishnu P. Shrestha

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Auditing, Assurance and Governance in Local Government
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Contractor Safety Management
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Obligations of the Company
1.2.1 > ISPS Module ISPS Code Responsibilities
Quality Assurance/Quality Control Policy
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
ISO 9000 Certification ISO 9001 and ISO
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Compensation events and claims Presented by Prof. Khem Dallakoti.
10/16/2015 Roles and Responsibilities of Principal Investigators/ Program Directors/ Project Directors.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
CONSTRUCTION CONTRACTS DOCUEMENTS
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
QUALITY MANAGEMENT STATEMENT
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
Developing a Local Authority Policy for Safety Audit Jo Horton - Road Safety Engineer Kent County Council
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
N.C. Department of Labor OSH Division
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
ISO/IEC
Juan Vázquez Sanz EUROCONTROL SRU
Health and Safety Policy
ACCREDITATION PROCESS
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Software and Systems Integration
Objectives of the Training
Safety Accountabilities
Particular Conditions of Contract & Appendix to Tender
Temporary Works Co-ordination
Rail Safety Worker Engineering and Design Competency
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Construction Management
Oregon Department of Education Summer Food Service Program
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
Emulsion Task Force Meeting
Quality Assurance for Emulsified Asphalt Surface Treatments
Operationalizing Export Certification and Regionalization Programmes
First Article Inspection
How to conduct Effective Stage-1 Audit
ACCREDITATION PROCESS
Construction Contract Administration
Prime Factors for Successful Preservation Treatments
Malcolm Johnson, Director, Telecommunication Standardization Bureau
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Fiber Reinforced Polymer Systems
Presentation transcript:

Role and Responsibility for Quality Assurance Vishnu P. Shrestha

Role & Responsibility for Quality Assurance Employer Consultant(s) Contractor (s) Technical Auditor(s)

Contractual Obligation of the Contractor (s) Standard Specification Sub-clause 116 “Program of the Works” Standard Specification Sub-clause 504 “ Quality Assurance Plan”

Role & Responsibility of the Contractor (s) Should Submit: RESOURCE PLAN w.r.to Program of the Works Materials Plan: A Clear Plan to Supply Materials at the Site Labour Plan: A Clear Plan to Deploy Labour Strength at the Site Equipment Plan: A Clear Plan to Mobilize Equipments at the Site

Role & Responsibility of the Contractor (s) Up-date “Program of the Works” as per Periodic Site Review SS Sub-clause 116 Similarly Up-date “Resource Plan” and QAP w.r. to Revised “Program of the Works”

Role & Responsibility of the Contractor (s) Periodic Calibration of Laboratory Equipments Demonstrate a trial run of all Construction Equipment (for establishing their capability to achieve the laid down specifications and tolerances to the satisfaction) Quality Management Plan: (how is he going to implement approved QAP) Method Statement Perform Workmanship strictly in Conformity with the Requirements of the Specifications

Role & Responsibility of the Contractor (s) Implement Quality Control System in following Sequence Compliant testing for materials including laboratory trials, Compliant testing for methods and equipment prior to the commencement of the work, including site trials or trials sections, Control testing during construction Acceptant testing on completed works or parts of the works.

Role & Responsibility of the Contractor (s) To get approval of the test results for verification and certification before submitting materials and/or finished works to the Engineer for approval in accordance with this Specification. In overall the Contractor is responsible produce Agreed “Quality Product” having approved Workmanship, Material Quality and Production Quality as per Condition of the Contract and Specifications

Continue Role & Responsibility of the Contractor (s) Key to All The Process Responsibility of the Contractor is to use the “ Program/Request for Inspection” as per Sequence of Works/Methodology for Works

Role & Responsibility of the Consultants Approve contractors quality management plan, work program, method statements, material sources, manpower and equipment deployment etc.: Ensure at all times the Contractor works in strict compliance with the Contractor's quality management plan, work plan, and contract specification, including instruction issued as per contract and non‑compliance notifications; Provide all necessary setting out data to the civil work contractors and ensuring correctness of the setting out at field

Role & Responsibility of the Consultants Provide all necessary setting out data to the civil work contractors and ensuring correctness of the setting out at field;   Review the Contractor's organizational arrangements, key personnel and work plan, materials and their sources; Monitor progress of works against baseline work plan and advise on measures to be taken to improve progress and quality;

Role & Responsibility of the Consultants Approve and/or issue working drawings and issuing instructions to the contractor as required in accordance with the contract specifications and Contractor's quality management plan; Supervise the Contractor in all matters concerning safety and care of civil works including provision of necessary lights, guardrails, fencing and security; Make measurements and keep measurement records; Maintain records, correspondence and diaries;

Role & Responsibility of the Consultants Advise the Employers Representative on all matters relating to the execution of the works including quality; and assist the Representative with processing the contractor's possible claims and disputes; Inspect the works at appropriate intervals during the defects liability period Check and certify as‑built drawings for the works prepared by the contractors; Comply with the Employer's Auditor General's requirements.

Role & Responsibility of the Consultant (s) In overall, the Consultant is responsible for Construction supervision and contract administration for the proposed project ensuring full compliance with the designs and specifications; Organize Routine Site Meeting for Quality Review Extreme Cases Undertake independent materials testing when considered necessary Issue and sign notice of non-conformance to record the defects

Role & Responsibility of the Employer :Informal Keep record of approved Program of the Work and Quality Assurance Plan Keep thorough understanding of Project Quality Management Plan submitted by the Contractors Prepare Plan for Site Visit w.r. to (a) Program of the Works, (b) Project Quality Management Plan Attain Routine site Meeting Check Certificates of Calibration of Lab Equipments periodically during site visit

Role & Responsibility of the Employer: Informal Attain all trial tests of the works Facilitate in opening the Quarry by the Contractors Be attentive to control illegal quarrying from within the RoW Periodically visit Quarry site and check quarry extraction by the Contractor in terms of (a) environment and (b) safeguard Be attentive on quality/ standard/ age of the equipments under use by the Contractor

Role & Responsibility of the Employer: Informal Be attentive to the public voice on quality of the constriction Visit production site of base materials such as (a) base course, (b) chips aggregates, (c.) concrete aggregate and (d) sub-base production etc. Frequently request to check the Program for Inspection sheet (completed one) Visit the constriction site at the time of work progress particularly during (a) base laying, (b) DBST/Ottaseal works and (c.) concrete work etc

Role & Responsibility of the Employer: Formal Approve Bill (IPC) submitted by the Contractor and recommended by the Consultant if attached with certified Lab test results and summary sheet of QAP monitored. Attained Management Meeting with Consultant and Contractor at the site every month. Review Progress Review Quality Issues Review up-dated Program of the Works/QAP Make site visit for checking workmanship visually Review Record of Non-conformamce

Role & Responsibility of the Employer: Formal Attain Public Hearing Address Public Grievance with consultation with the Consultant and the Contractor Review Non-conformance Reports and instruct the Consultant to strictly adhere with SS Section 1200, sub-clause 9b which stated that: “ any materials or workmanship that do not comply with the specified requirements shall be replaced with materials and /or workmanship complying with specifications or be replaced to comply with the specified requirements”

Role and Responsibility of the Technical Auditor The foremost duty and responsibility of the Technical Auditor is enforce “ Standard Specification Section 1201, sub-clause 9b.”

END Thank you Vishnu Shrestha