EEC Core Team 6th February 2018, Vienna.

Slides:



Advertisements
Similar presentations
Common Timetabling Platform Project Update January 2009.
Advertisements

Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
FCM Quality of Life Reporting System Metadata By: Acacia Consulting and Research June 2002.
© Cheltenham Computer Training 2001 Macromedia Dreamweaver 4 - Slide No 1 Macromedia Dreamweaver 4 Advanced Level Course.
United Nations Economic Commission for Europe Statistical Division Seasonal Adjustment Process with Demetra+ Anu Peltola Economic Statistics Section, UNECE.
Exploring Microsoft Access Chapter 6 Many-to-Many Relationships: A More Complex System.
Page 1 14 December 2001 DBOR Release Features Title Slide AT&T DBOR.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
The SharePoint Shepherd’s Course for End Users Based on the book by Robert L. Bogue Copyright 2011 AvailTek LLC All Rights Reserved.
Software project mgt. session # 3– lab manual.
Standards Education Committee Update
For Using of TAF Test Manager (TTM)
Software Word Processors.
PCS Technical Board Vienna, 28th February 2017.
RFC PCS Training Budapest, 8th – 9th February 2017.
PCS Follow up Project Preliminary results.
Increased Efficiency and Effectiveness
Non-RU Applicant (NRA), PCS UG
RFC Short Term Path Request Pilots
Current activities Vienna, 10th May 2017.
Content Management System
Software project mgt. session # 3– lab manual.
PCS Day 2016 CMS Vienna, 23rd November 2016.
PCS Technical Board 17th October 2017, Vienna.
Envelope Concept report, PCS UG
PCS Outlook PCS User Group 12th September 2018, Vienna.
PCS Minor Release th February 2018, PCS UG.
PCS CCB Group 22nd February, 2017.
TAF-TSI Train Object 25th June 2018, Prague.
PaP Publication strategy TT2019 – Combined PaP
PCS Technical Board 1st June 2017, Vienna.
PCS Day - Feedback 23th November 2016, Vienna.
Development roadmap PCS Day 2017.
The new C-OSS Timetable features are not fully in line with C-OSS expectations
PCS User Group 15th February, 2017.
PCS User Group Vienna, 13th September 2017.
PCS Developments – PCS CCB
PCS IT Day 23 November 2017, Vienna.
Retrospective report of the past year
Update timetable in PCS dossier from national system
PCS Groups and Boards PCS Day 2016
Add Studbook Animal.
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
TAF-TSI Pilot PCS Day 2017.
PaP Product Definition
JS Pilot and TEG Meeting, Vienna, 12/02/2019
Taskforce „TT Quality“: Report from First Workshop (short)
Handling of PaP identifiers
TSI Compliant PCS Mandatory Interface
JS Handbook overview of changes
ÖBB-Infrastruktur AG Network Access – Customer Care Patrick Wögenstein
PCS Link I-TMS 3 PCS IT Day
PR deadline experiences, PCS UG
PCS Envelope Concept Status of the project
Trainings before Problems: New user
RFC Short Term Path Request developments
Envelope concept changes
PCS Technical Board 27th February 2018, Vienna.
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Weekly Lesson Template
Connecting Europe, Railway Undertakings and ProRail
Developments Confirmation by the CCB that the TAF TSI components have been successfully implemented into PCS Confirmation by the CCB that PCS has been.
Envelope Concept report, PCS TB
Quick Border Information
Training timeline Train the trainer RFC 1st round RFC 3rd round
Modelling of Train and Path in TAF/TAP TSIs
PCS Test Group 9 July 2019, Vienna.
TT Quality monitoring on borders
and Forecasting Resources
Presentation transcript:

EEC Core Team 6th February 2018, Vienna

Agenda

Agenda Content of specification Major Features Definitions, abbreviations Dossier creation, editing Timetable combination algorithm Good, but not directly EEC related issues Use cases including a bit of Train ID and PCS schema (6 parts) Timeline, next steps 15 January 2019

Table of content 15 January 2019

Major Features RU Timetable construction on national (or pair) level Calendar consistency checks Automatic downgrade of acceptance indicators when neighbours are impacted by a timetable change Train Outline as a special presentation of the timetable that shows the most important data that describes the train Multiple PaPs can be added to the dossier on the same territory PaPs will be published until the border in each territory 15 January 2019

Definitions (1) 15 January 2019

Dossier Creation Dossier Types RU Path PCS will prevent to saving a path in the draft with… Path data Title Path section data Dossier-level data (ACL remains) Train parameters propagation Horizontal Vertical Calendar Template Consistency checks Offset calculation 15 January 2019

Dossier editing (Open & Harmonization) Changing Basic Data elements Geographical overview Calculation of timetable combinations Editing of timetable in different level Calendar editing Acceptance indicator downgrade (Harmonization only) 15 January 2019

Timetable Combination algorithm 15 January 2019

Good, but not directly EEC related… Time-zone offset Dwell time constraints Train parameter presentation 15 January 2019

Definitions (2) 15 January 2019

Use Cases 1-4 Path Variant vs. User Variant 15 January 2019

Use Cases 5-9 Transfer Day, Alternative O/B/D 15 January 2019

A bit of TRAIN ID… 15 January 2019

Use Cases 11-13 TSI 15 January 2019

Use Cases 14-18 Acc.indicators 15 January 2019

Use Cases 19-23 I, X trains, Outline 15 January 2019

Use Cases 24-28 Offsets 15 January 2019

Timeline Regular updates (2 weekly telco) Personal meeting end of March? During pre-booking period. Review of specification (1-2 weeks) Estimation for development Writing use case per person now, RNE sends doc back written in EEC "world" Meaning of involvement in implementation Reaction time Forum in CMS 15 January 2019