EEC Core Team 6th February 2018, Vienna
Agenda
Agenda Content of specification Major Features Definitions, abbreviations Dossier creation, editing Timetable combination algorithm Good, but not directly EEC related issues Use cases including a bit of Train ID and PCS schema (6 parts) Timeline, next steps 15 January 2019
Table of content 15 January 2019
Major Features RU Timetable construction on national (or pair) level Calendar consistency checks Automatic downgrade of acceptance indicators when neighbours are impacted by a timetable change Train Outline as a special presentation of the timetable that shows the most important data that describes the train Multiple PaPs can be added to the dossier on the same territory PaPs will be published until the border in each territory 15 January 2019
Definitions (1) 15 January 2019
Dossier Creation Dossier Types RU Path PCS will prevent to saving a path in the draft with… Path data Title Path section data Dossier-level data (ACL remains) Train parameters propagation Horizontal Vertical Calendar Template Consistency checks Offset calculation 15 January 2019
Dossier editing (Open & Harmonization) Changing Basic Data elements Geographical overview Calculation of timetable combinations Editing of timetable in different level Calendar editing Acceptance indicator downgrade (Harmonization only) 15 January 2019
Timetable Combination algorithm 15 January 2019
Good, but not directly EEC related… Time-zone offset Dwell time constraints Train parameter presentation 15 January 2019
Definitions (2) 15 January 2019
Use Cases 1-4 Path Variant vs. User Variant 15 January 2019
Use Cases 5-9 Transfer Day, Alternative O/B/D 15 January 2019
A bit of TRAIN ID… 15 January 2019
Use Cases 11-13 TSI 15 January 2019
Use Cases 14-18 Acc.indicators 15 January 2019
Use Cases 19-23 I, X trains, Outline 15 January 2019
Use Cases 24-28 Offsets 15 January 2019
Timeline Regular updates (2 weekly telco) Personal meeting end of March? During pre-booking period. Review of specification (1-2 weeks) Estimation for development Writing use case per person now, RNE sends doc back written in EEC "world" Meaning of involvement in implementation Reaction time Forum in CMS 15 January 2019