Budget Zhijun Liang IHEP Sept. 27, 2017.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
A Silicon Disk Tracker in forward direction for STAR News since November 2000 Physics Capabilities capabilities Requirements / Potential Technologies Possible.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
P3MD Labs Introduction to the facilities of the Purdue Experimental Particle Physics research groups.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Optical Fibers Jonathan Perez MEEN What are Optical Fibers? Long thin strands of very pure glass about the diameter of a human hair. They are arranged.
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
CBM-MPD STS consortium – status of activities Yuri Murin for the Consortium –Engineering of STS module, ladder, station –Cooling system concept and plans.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 Activities in Wuhan TopMetal sensor & ALICE ITS upgade Xiangming Sun CCNU ALICE ITS Upgrade and O2 Asian Workshop 2014.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
Albuquerque 1 Wolfgang Lohmann DESY On behalf of the FCAL collaboration Forward Region Instrumentation.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Myself Training Technical Dissemination Impact.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Draft of 3 year CMOS Strip Programme Need to advise WG3 on likely resource requirement Draft Outline provided at Valencia Discuss and improve basis for.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
The STS-module-assembly:
Development of T3Maps adapter boards
n-XYTER Hybrid Developments
Progress with System Integration of the CBM Silicon Tracking Detector
Santiago in DEPFET for SUPERBELLE
HV/HR CMOS in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Huffman, Jaya John, Nickerson, Placket, Shipsey, Vigani.
Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey.
Next steps toward the beam test
Next generation rad-hard links
CCS Hardware Test and Commissioning Plan
Resolution Studies of the CMS ECAL in the 2003 Test Beam
TileCal upgrade EVO meeting Demonstrator tesks
Daniel Walczyk, PhD, PE Professor and Center Director.
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
10/month is the present production rate 2 FTE + sporadic contributions
EENP2 Silicon Detectors.
Preparations for test of
Work packages status in Torino and perspectives
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Instrumentation Development Lab: facilities/resources
Pierluigi Paolucci - I.N.F.N. Naples
Sidet Facilities A snap shot of space and equipment at Sidet and their current use Projected future uses and upgrades Hogan Nguyen, Fermilab May 22nd 2007.
Instrumentation Development Lab: facilities/resources
LHCb VErtex LOcator ENGINEERING DEPARTMENT
HL-LHC upgrade at IPHC news
3D electronic activities at IN2P3
Presentation transcript:

Budget Zhijun Liang IHEP Sept. 27, 2017

Overall budget (18M) Equipment 设备费:2.5 M RMB Material fee 材料费: 2.2 M RMB Testing and manufacturing fee(测试加工费):5.5M fuel power cost: 0.6M Travel(差旅费): 0.5M Conference fee (会议费): 0.9 M International cooperation and exchange(国际交流费):1.5M Labor cost (劳务费): 3.5 M publication / literature / information dissemination / intellectual property services 0.7M , 70万 consultant fee (专家咨询费 ) 0.1 M , 10万

Testing fee (5.5 M) 5 MPW runs (1.5 M) Engineering runs (4M) Taking TowerJazz CiS 180nm high resistance process as example. MPW runs 300 thousand yuan / time * 5 times =1.5 million Engineering runs (4M) 2 million / times * 2 times =4 million yuan.

Equipment (~ 2.5M ) Gantry system from Aerotech company, 1 million RMB Robot for automatics pixel ladder assembly Probe station with temperature control system, 400k Radiation hardness study

Other Equipment fee An advanced oscilloscope Tektronix DPO7354 model, 310 kRMB One Function generator, Tektronix AWG5002C, 300 kRMB 5 FPGA evaluation boards , ~50k RMB High voltage source ~ 300k RMB Low voltage source ~ 100k RMB

Material fee : electronics Testing in the lab (laser test, source test) Probe card: (150k, 15万) PCB boards manufacture (36万, 360k RMB) 3k (per board ) X 15 board each time X 8 times Components on PCB board : (16万 ,160k RMB) ADC + pre-amplifier + FPGA + Supporting ASIC Test beam Low-material Soft PCB boards (15 万 ,150k) 15k per time x 10 times Components on soft PCB board : (10万,100k)

Material fee: mechanism Support structure for pixel ladder (350k, 35万) carbon fiber board Toolings for ladder assembly (300k, 30万) Metal supporting structure for multi-layers of tracker prototype (200k, 20万)) Wire bonding (250k,25万) Cable (100k, 10万) Cooling , temperature monitoring (150k, 15万) Vacuum system (50k, 5万) Clean room material (30k, 5万 )

international cooperation and exchange (1.5M ) International conference fee, 500k(50万) IEEE radiation detector conference, Vertex conference …. 25k per trip X 20 trips Foreign experts exchange program, 240k (24万) 20k per person X 12 persons Experiment aboard 750k (75万) Schedule four test beams at DESY/CERN/SLAC … each time 4~6 persons 25k per trip X 40 trips

Labor cost (3.5M) 6 postdoc (2.4 M) 10 students (~1.1 M) 5000 RMB/month/person x 12 months x 6 person x 5 years 10 students (~1.1 M) 1500RMB/month/person x 12 months x 12 person x 5 years =1.08 million RMB

intellectual property services FPGA Design Vivado (50k ) https://china.xilinx.com/products/design-tools/vivado.html PCB design : Altium (50k) http://www.altium.com.cn/altium-designer/overview IC design software (400k ) ?