Recent Activities H. Loos 02/15/2011.

Slides:



Advertisements
Similar presentations
Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics for Diagnostic Section BC1 in the European XFEL.
Advertisements

Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
RF Synchronization, control and stability Takuya Natsui.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
Beam Diagnostics Collaboration Meeting March 18 th 2015 at Australian Synchrotron Mario Ferianis – Elettra.
Beam Dynamics Meeting Bolko Beutner, DESY Report from “Characterization of High Brightness Beams” Workshop in Zeuthen Bolko Beutner, DESY Beam.
1 A ccelerator P hysics and E ngineering Josef Frisch Tonee Smith Clive Field Alan Fisher Henrik Loos Jeff Rzepiela Mark Petree Steve Smith Jim Welch Glen.
XFEL BC Review Meeting, 18/12/2006, Christopher Gerth Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics Layout of the Diagnostic Sections.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 Henrik Loos 1 13 Sep 2011 APE Meeting Recent Activities H. Loos 09/13/2011.
Laser stability Takuya Natsui. Oscillator phase lock stability.
Diagnostics Overview for the LCLS Presented by Josef Frisch For the LCLS ANL / LBNL / LLNL / SLAC.
Terahertz Generation at FACET, and Potential Enhancement at FACET-II Ziran Wu, Alan Fisher, Matthias Hoffmann, Mike Litos Steve Edstrom, Christine Clarke,
Post-LH Diagnostic Line for LCLS-II P. Emma, M. Woodley, Y. Nosochkov, Feb. 26, 2014 Steal beam at Hz with y -kicker after LH (  y = 15 mm) Bend.
Topic report 11/09/01 Optical Spectrum Analyzer (OSA) Speaker: Chieh-Wei Huang Advisor: Sheng-Lung Huang Solid-State Laser Crystal and Device Laboratory.
ATF2 Status N.Terunuma, KEK
LCLS Commissioning & Operations High Level Software
Expected hardware status and Priority of the commissioning task
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Status of the MAX IV Short Pulse Facility
Cutting Beam Horns in BC1
Short pulse, low charge LCLS operation
LCLS-II Lattice 26FEB16: updates in the areas from bypass to dump
Accelerator Physics and Engineering Update Jan 6, 2010
Paul Scherrer Institut
Beam-Based Feedback in LCLS-II
LCLS Commissioning & Operations High Level Software
Revised Commissioning Strategy
What am I working on… H. Loos 08/02/2010.
LCLS Commissioning Parameters
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Commissioning Status of the LCLS Accelerator and Undulator Systems
Diagnostics overview and FB for the XFEL bunch compressors
Data Mining Ideas.
Machine Studies/Software Update
Accelerator Physics and Engineering Update Jan 6, 2010
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
LCLS Injector Diagnostics
XFEL bunch compressors
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
Linac/BC1 Commissioning P
LCLS Commissioning P. Emma, et al
VELA – CLARA AP (Draft) Goals Software Goals
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
Breakout Sessions SC1/SC2 – Accelerator Physics
Breakout Session SC5 – Control Systems
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Injector Diagnostics Status
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Injector Physics C.Limborg-Deprey Feb.8th 2006
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
Presentation transcript:

Recent Activities H. Loos 02/15/2011

Activities FACET NLCTA LCLS Bunch length monitor THz source Adopt LCLS HLA LCLS A-line profile monitor improvements and bunch length measurements OTR2 COTR study & mitigation Tuning time reduction task force New feedbacks troubleshoot & Matlab HLA upgrade Pulse stealing beam diagnostics

A-Line Experiments PR18 new screen Resolution target ~125 um vert. ~250 um hor. Smallest hor. size ~350 um Resolve double horn structure Measure < 2fs bunch length

OTR2 COTR Mitigation Transmission grating + TCAV0 to study laser heater induced COTR Multiple reflections 1st order 760 nm 1st order 380 nm 0th order 760 nm laser mirror as COTR band-pass filter not successful yet

Tuning Time Reduction Task Force Minimize MD recovery and experiment switching time Weekly meetings Identify and improve HLA usage issues Implement/improve event logging for HLA Get better metric on tuning time Improve accelerator setup reproducibility

Pulse Stealing Diagnostics Use TCAV3 1Hz event Set data slot 2 on PAU Tested for most PAU RF stations Implement emittance for LTU wires with fast feedback correctors