Report on HIE-ISOLDE Status

Slides:



Advertisements
Similar presentations
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Advertisements

ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HIE-ISOLDE Project: Status Report EXTRA COSTS AND ADDITIONAL RESOURCES CERN, 29 January 2013 Yacine Kadi.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
1 1. Some recent views ( ) 2 Linac tunnel
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
HIE-ISOLDE Project Status Report
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE Project Y. Kadi (EN-STI) On behalf of the HIE-ISOLDE Coordination team.
HIE-ISOLDE Project Status Report
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
HIE-ISOLDE Project Status Report 52nd ISOLDE & nTOF Technical Committee meeting February 3rd 2016 Y. Kadi On behalf of the HIE-ISOLDE Project Team.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
TE-CRG Activities D. Delikaris, TE-CRG.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Slide 1 of 10Matthew Fraser – CI MEW Meeting, 25 th October 2010.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
ELENA installation progress F. Butin / ELENA collaboration.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
WP High Beta Cavities Delivery
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Plans towards CC in the LHC a US – centric perspective
Status of HESR 18th March Gießen Dieter Prasuhn.
ELENA installation and commissioning status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Uppsala Commitment to ESS and FREIA Planning
AD consolidation activities in LS2
SPS cryogenic proximity equipment and SM18 validation
Update on HW commissioning
ESS RF Development at Uppsala University
HIE-ISOLDE Project Status Report
HIE-ISOLDE Project: Planning & Resources
Report on HIE-ISOLDE Status & International Advisory Panel Meeting
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Teleconference ACS – FREIA 20th February 2018
HIE-LINAC status report
HIE-ISOLDE Project: Status Report
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
HIE-ISOLDE contribution packages
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Beam Transfer Line Stage 1:
CNRS contribution to ESS – 01/02/17
Tasks, Responsibilities Expectations and Needs
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
SNS-PPU upgrades the existing accelerator structure
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Report on HIE-ISOLDE Status Yacine Kadi on behalf of the HIE-ISOLDE project team ISCC, 6 July 2011

Outline Launching of Market Surveys Hiring of CATHI fellows Budget allocation International Collaboration Cryomodule design Cavity RF tests @ SM18 Summary July 6, 2011 | ISCC | Yacine Kadi | 2

Market Surveys Call for tender for dismantling and relocation of “hangar à camion” over => start of civil engineering at ISOLDE Deadline was June 15 => under selection Market survey for the Cryogenic System has been launched (MS-3777, EDMS N°: 1146908) It will be followed by the issue of an invitation to tender to qualified and selected firms in August 2011 for a contract to be awarded in January 2012 Market survey for the design, supply, installation and commissioning of a chilled water plant, and of an heating, ventilation and air-conditioning equipment for the HIE Isolde infrastructure (MS-3785, EDMS N°: 1145842) It will be followed by the issue of an invitation to tender to qualified and selected firms and combination of firms in August 2011 for a contract to be awarded in December 2011 and a commissioning of the plant in January 2013 July 6, 2011 | ISCC | Yacine Kadi | 3

9 CATHI Positions Appointed ESR2: Cavity and Cryomodule tests => Irene Mondino BE/RF (May 1st) ESR5: Development and participation to the integration studies => Eleftherios Zografos EN/MEF (Aug. 1st) ESR6: Development and participation to the control, alignment and positioning metrology => Carla Babcock BE/ABP (Sep. 1st) ESR8: Target material studies => Michal Czaspi EN/STI (Aug. 1st) ESR12: Low-level controls => Martino Colciago EN/STI (Aug. 1st) ESR13: Cooling Ventilation Design Study => Polato Andrea EN/CV (Oct. 1st) ESR14: Design study of the vacuum system for the Front End of the Isolde facility => Mario Hermann TE/VSC (Apr. 1st) ESR15: Off-line separator and High-resolution separator magnet => Augustin Mathieu EN/STI (Sep. 1st) ESR16: RFQ cooler and pre-separator => Jacobo Montaño EN/STI (Nov. 1st) July 6, 2011 | ISCC | Yacine Kadi | 4

10 CATHI Positions still open (Jul. 15, 2011) ESR1: Cavity fabrication ESR3: Beam Instrumentation ESR4: Magnet Design ESR7: Linac Commissioning ESR9: Target conceptual design#1 ESR10: Target conceptual design#2 ESR11: Extraction optics and front-end design ER2: Beam Instrumentation ER3: Design study of a replacement charge breeder for REXEBIS ER4: Radiation Protection Studies July 6, 2011 | ISCC | Yacine Kadi | 5

Material Budget As defined in MTP 2012 Total budget of 35.3 MCHF (2010 – 2016) with two funding sources: External funding (incl. Isolde Coll.) LINAC (17.7 MCHF) 5.5 AMeV + beam line stage1 ~ 8.6 MCHF (6.3 MCHF secured) CERN budget Management (0.2 MCHF) Infrastructure (14.7 MCHF) Design studies for intensity upgrade (2.1 MCHF) Safety (0.8 MCHF)

HIE-ISOLDE Schedule ///// ///// 2011 2012 2013 2014 2015 2016 Civil Q1 Q2 Q3 Q4 2011 2012 2013 2014 2015 2016 Civil Main services Cryo CM 1&2 CM 3&4 5.5MeV/u 10MeV/u Beam Transfer Line CM 5&6 Isolde & REX Operations: Main serv. CM1&2 sd ///// sd long shutdown 2013 sd sd Jan 2013 Aug 2014 shutdown ///// Isolde & REX perturbations REX stop

Status of HIE-ISOLDE Collaborations IPN-Orsay Discussions concerning special contribution (LLRF, cavity ancillaries Availability of test cryostat for HIE-ISOLDE cavity RF tests MoU in preparation Korean MEST to allocate 200 kUSD/year for joining ISOLDE Collaboration => now awaiting final approval by Korean Parliament BARC (India) Discussion concerning in kind contribution (production of copper cavity substrates and cryostats) Discussion with DAE (funding agency) for joining ISOLDE Collaboration Application to Wallenberg Foundation on priority list

Cryomodule design near completion July 6, 2011 | ISCC | Yacine Kadi | 9

Status of RF Measurements for Prototype Cavities 1 & 2 Jan. 10 – Feb. 15 => 4th cold RF tests of high-b prototype cavity#1 10 – 14 Jan. => measurement of the coupler line -> thermalization is OK 17 – 21 Jan. => extraction of cavity#1 and disassembly of coupler line -> done 24 – 28 Jan. => fixing coupler line and reassembly of cavity#1 -> done 31 – 8 Feb. => RF conditioning and tests -> done Jan. 17 – Mar. 15 => 1st cold RF tests of high-b prototype cavity#2 17 – 21 Jan. => conditioning of sputtering chamber -> done 24 – 8 Feb. => preparation and sputtering of cavity#2 -> done 9 – 18 Feb. => transport to SM18, assembly of cryostat and cool down -> done 21 – 4 Mar. => RF conditioning and tests -> done Mar. 1 – Apr. 15 => new cold RF tests of high-b prototype cavity#1 New sputtering -> INTERRUPTED Mar. 31 – May. 15 => new cold RF tests of high-b prototype cavity#2 July 6, 2011 | ISCC | Yacine Kadi | 10

Q - E Measurements of Cavity 1 December 2010 February 2011 July 6, 2011 | ISCC | Yacine Kadi | 11

Q - E Measurements of Cavity 2 December 2010 Single point in March 2011 ★ February 2011 July 6, 2011 | ISCC | Yacine Kadi | 12

Cooldown of Test Cryostat @ SM18 Burned RF connector Cold leak on the heat screen CERN has and is putting considerable resources to solve this mishaps July 6, 2011 | ISCC | Yacine Kadi | 13

Prospects for new RF Measurements RF connector changed Cold leak on the heat screen has been repaired and test cryostat is operational SM18 Facility has shutdown for summer => RF measurements will resume end of August 2011 2 new inserts and additional thermal screen will be manufactured => accelerate RF test turnover (may even envisage 2nd test cryostat) 2 additional prototype cavities will also be fabricated The turn around of the sputtering and test has improved from 6 weeks to 3.5 weeks July 6, 2011 | ISCC | Yacine Kadi | 14

Thank you very much for your attention CERN teams involved with the HIE-ISOLDE project ISOLDE Collaboration Ext. partners