doc.: IEEE <doc#>

Slides:



Advertisements
Similar presentations
Submission Title: [Add name of submission]
Advertisements

<month year> <doc.: IEEE doc> May 2015
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Add name of submission] Date Submitted:
doc.: IEEE <doc#>
doc.: IEEE <doc#>
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Considerations on general MAC frame] Date Submitted:
doc.: IEEE <doc#>
September 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Discussion on MAC structure Date Submitted:
doc.: IEEE <doc#>
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
<month year> doc.: IEEE < e>
doc.: IEEE <doc#>
<May,2009> doc.: IEEE <doc .....> <July 2009>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> doc.: IEEE <xyz> January 2001
doc.: IEEE <doc#>
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Improved Delayed ACK response Frame for.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Enhancing reliability of data transmission.
<month year> <doc.: IEEE doc> March 2015
<month year> doc.: IEEE < e>
doc.: IEEE <doc#>
Submission Title: [WG WNG Liaison Report January08]
<month year> <doc.: IEEE doc> December 2015
<month year> <doc.: IEEE doc> March 2015
<month year> <doc.: IEEE doc> September 2015
doc.: IEEE <doc#>
<month year> doc.: IEEE <xyz> November 2000
<month year> November, 2004
doc.: IEEE <doc#>
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
doc.: IEEE <doc#>
Submission Title: [Frame and packet structure in ]
November 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Simplified geometry for the usage model.
<month year> <doc.: IEEE doc> May 2015
<month year> January 2015
<month year> <doc.: IEEE doc> May 2015
<month year>20 Jan 2006
doc.: IEEE <doc#>
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Considerations on general MAC frame] Date Submitted:
<month year> doc.: IEEE < e>
<month year> <doc.: IEEE doc> September 2015
<month year> <doc.: IEEE doc> January 2016
<month year> <doc.: IEEE doc> March 2015
doc.: IEEE <doc#>
March 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [DF6 Radio-burst length over PSDU size] Date.
<month year> <doc.: IEEE doc> March 2015
September 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Discussion on MAC functionalities Date.
Submission Title: [Proposed Resolution for FSK/GFSK Prior Comments]
doc.: IEEE <doc#>
doc.: IEEE <doc#>
<month year> <doc.: IEEE doc> July 2015
<month year> doc.: IEEE <030158r0> <March 2003>
June, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [OFDM PHY Mode Representation] Date Submitted:
September 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Suggested TG3c PAR Changes] Date Submitted:
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
doc.: IEEE < nnn-00-0mag>
Mar 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution for Comment 70 ] Date Submitted:
<month year> <doc.: IEEE doc> September 2015
August, 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Improve the latency between GTS request.
<month year> <doc.: IEEE doc> March 2015
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Dependable Interest Group Closing.
Submission Title: TG9ma Agenda for September Meeting
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: MLME-SOUNDING and MLME-CALIBRATE comment.
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
May 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Source identification Date Submitted: May, 2015.
12/15/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [AWGN Simulation Results] Date Submitted:
Presentation transcript:

doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> May 2018 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: pureLiFi’s explanation to payload on MAC layer Date Submitted: 8 May 2018 Source: Nikola Serafimovski, Chong Han, Stephan Berner, Mostafa Afgani (pureLiFi) Address: 9 Haymarket Terrace, Edinburgh, UK, EH12 5EZ Mobile:[+44-7503016565], E-Mail:[chong.han@purelifi.com] Re: Abstract: pureLiFi’s explanation to payload on MAC layer Purpose: Contribution to IEEE 802.15.13 Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Chong Han (pureLiFi) <author>, <company>

doc.: IEEE 802.15-<doc#> <month year> doc.: IEEE 802.15-<doc#> May 2018 Answers for slide 9 Integrity Check Value (ICV) is involved in WEP MPDU cryptographic encapsulation. WEP computes the ICV over the plaintext data and appends this after the MPDU data. WEP encrypts the MPDU plaintext data and ICV using ARC4 with a seed. The ICV shall be computed and appended to the plaintext data prior to encryption, but the IV encoding step may occur in any order convenient for the implementation. The overhead is due to encapsulation for encryption. The maximum length of the Frame Body field can be determined from the maximum MSDU length plus any overhead from encapsulation for encryption --- from IEEE Std 802.11v2016 John Li (Huawei) <author>, <company>