09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Advertisements

:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 3rd October - morning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Wednesday September 14th
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Tuesday 11th September LHCb dipole presently fault off
Wednesday 5th September - morning
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Tuesday 22nd January - morning
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Wednesday 31 October: Morning
Thursday morning 09:30 Dump of pPb fill.
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Coordination by E. B. Holzer & J. Wenninger Production
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
Friday March 4th 08h32: Access for beam dump system.
LHC Morning Meeting - G. Arduini
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Monday 3rd September - morning
Saturday 3rd November - morning
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Thursday
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Monday 10th December - morning
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning Waiting for PS – problem on RF cavity.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Friday :47 stable beams fill 3273
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Tuesday
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Not the most productive 24 hours on record

Thursday 19th October - morning 08:15 OP dump of fill 3194 164 pb-1 in 12h36m RB.A23 QPS controller communication problem solved with a "soft" reset. RQ8.L1B1 and 2 tripped during ramp-down Access required – decide to clear list 10:00 Start access... 19-10-12 LHC status

Access for: Power Converter S81 for Q8. B2 BGI by Mariuz BSRT by Aurelie ATLAS & CMS Roman Pots - TOTEM Serge di Luca called to repair UJ43 pad but was not possible today, on the contrary he took care of other problems. PAD UJ14 & problem with the biometry 19-10-12 LHC status

Thursday 19th October - afternoon 12:15 start cycling (twice) Redeployed the PcInterlock server with improving the stability of the Lsa-Monitoring. (Kajetan) Also a new version of PcInterlock GUI was released, which more clearly displays the sources of the settings. 14:15 Ready to inject Some delay – SPS in MD – coasting beam 15:00 Start RF tuner adjustment We have fine-adjusted the tuners for 11 out of 16 cavities. We have also increased the QL from 60k to 70k on 5 cavities. That should reduce the demanded klystron power in physics, well below the saturation limit (taking place between 180 and 200 kW, klystron dependent). (Philippe & Themis) 19-10-12 LHC status

Thursday 18th October - evening 16:20 RF beams dumped - injecting for physics Some delay, SPS still in MD, beam quality checks needed SPS transmitter fault – partial fill dumped at 19:20 With beam 1 in, we compared the tune signal in prepare ramp configuration with the BBQ bunch gating ON and OFF. clear improvement of the signal with the gating ON. Switch off for the next fill. 20:30 start ramp Ratty squeeze – both beams Usual instability B1V at end of squeeze Few bunches end batch – high bandwidth ADT requierd! Beams lost towards end of adjust Loss spike on collimators (B2) 19-10-12 LHC status

3198 squeeze 19-10-12 LHC status

B1V – BBQ amplitude - systematic 3198 – squeeze and adjust B1V – BBQ amplitude - systematic 19-10-12 LHC status

Late Thursday evening 23:10 back at flat top Beams lost to QPS trigger - RCS.A12B1 switch problem Needed to reset energy extraction on QPS synoptic, before we could reset the converter. Tried to close switches, did not work, went into fault. Second time around with more resets... no luck. Calling MPE piquet. VINCENT, FROIDBISE In - changed the switch and the card that goes with it but there is still something wrong. Go back to the lab and get spares and then try again. 19-10-12 LHC status

Mama told me there’ll be nights like this 04:25 RCS.A12B1, switches are closed. According to Vincent, it was a DQAMS600 card that had a problem. It is the card that handles the communication, probably one input is broken. 04:30 PSB has a problem with the 16 MHz cavities, PS and SPS have no beam. 05:30 Cryo Start lost / flickering on 78 - could be a WorldFIP problem. Cryo operator will call the best effort service, we take pilots in the meanwhile but will wait for his ok to get the physics beam. 06:15 WorldFIP repeater needs to be exchanged. Pt 8 RE82, best effort support is here. Contact fire brigade for RP piquet. 07:15 Access to PM85 19-10-12 LHC status

Friday October 19th - morning 07:30 CS status ok now for S78 after WorldFIP intervention in UJ83. 07:45 Cycling Will fill for physics With high bandwidth ADT 19-10-12 LHC status