Commercial Shipping Unit 3 - Laytime.

Slides:



Advertisements
Similar presentations
by Zeynep Özkan Özeren ÖZKAN Law Office
Advertisements

CHARTERERS DEFAULT - LIEN OVER CARGO BY IAN GOULSON.
Contractual Obligations
Cargo Direct International
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
1 LAYTIME AND DEMURRAGE RECENT CASES HOUSTON March 29, 2007 William J. Honan Holland & Knight LLP.
INTERTANKO SEMINAR, DALIAN Session 5 Tanker Charterparties – recent cases and model clauses John C. Fawcett-Ellis.
Практика морского бизнеса: делимся опытомОдесса, г. LAYTIME & DEMURRAGE some peculiarities of calculation.
Please note: This is a PowerPoint 2003 file. Do not work on this file in PowerPoint 2007 or It will distort the template settings in this file (EVEN.
Virtual Arrival an Initiative by Shipping to reduce GHG emission Singapore 8 may 2012 Senior Manager Research & Projects INTERTANKO.
Texas Real Estate Contracts 4 th Edition © 2015 OnCourse Learning.
EYES WIDE OPEN Recent Developments in Tanker Voyage Chartering Singapore, March 2006.
Tomislav Skračić, MA Undergraduate English Course for MARITIME MANAGERS 6th Semester Essential reading: ● T. Skračić, Waypoint – English Textbook for Maritime.
Breach of Contract and Remedy
MARITIME TRANSPORTATION MANAGEMENT DOCUMENTS. Bill of Lading (B/L) Master B/L House B/L Non-Negotiable B/L Clean B/L Charter Party (C/P) Shipping/Booking.
Performance and Discharge Chapter 8. Discharge Discharge usually results from performance but can occur in other ways: (1) the occurrence or failure of.
PERFORMANCE OF CONTRACT.
MARITIME TRANSPORTATION MANAGEMENT
Charterparties and Agreed Damages Clauses under English Law and the PECL PROF D. RHIDIAN THOMAS Copyright Rhidian Thomas, 2014 All rights reserved No part.
CHAPTER EIGHT THE BASIC LETTER OF CREDIT. With a letter of credit banks become directly involved by committing themselves to pay the seller, which enables.
PROPOSED CHANGES TO LINZ STANDARD AND GUIDELINE FOR ACQUISITON OF LAND UNDER THE PUBLIC WORKS ACT.
Agency AUTHORITY OF AGENTS (1) Where an agent acts in the name of a principal, the rules on direct representation apply. (2) Where an intermediary acts.
1 Ⅴ. General Articles Ⅵ. Transfer Article 29 Extension of Expiry Date or Last Day for Presentation Article 30 Tolerance in Credit Amount, Quantity and.
MARINE INSURANCE.
Construction Contracts
ANNUITIES AND POLICY CONDITION OF LIFE INSURANCE.
Marine Claims – Loss of Hire NMIP Chapter 16 By Sveinung Måkestad, Vice President, Gard AS The Nordic Association of Marine Insurers 1.
CONTINUATION SA REPORT NI TAHNEE. ELEMENTS OF CONTRACTS.
SHELLVOY 6 Patrick Shaw, Ince & Co 14 April 2005 INTERTANKO Athens.
-CHARTERPARTIES- INTRODUCTION
1. 2 Charter Party A contract whereby a shipowner agrees to place his ship, or part of it at a disposal of a person ( the charterer) for the carriage.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Eastern Mediterranean University BANK406 Corporate Banking Law and Practice CHP 6.
Project Ⅱ Task 6 Bill of lading. Section 2 III. Bill of lading A bill of lading (sometimes referred to as a B/L) is a transport document issued by a carrier.
LAW FOR BUSINESS AND PERSONAL USE © SOUTH-WESTERN PUBLISHING Chapter 13Slide 1 Performance of Duties Describe how contracts are usually satisfied Explain.
Copyright © 2017 Pearson Education, Inc. All rights reserved. Chapter 9 Fundamental Legal Principles.
LESSON 16 Letter of Credit. A letter of credit is a document from a bank guaranteeing that a seller will receive payment in full as long as certain.
Accounting (Basics) - Lecture 5 Impairment of assets
Chapter 15 Discharge of Contracts
CORPORATE LAW.
Eastern Mediterranean University
Eastern Mediterranean University
Fundamental Legal Principles
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
SESSION 11 – SPECIALIST TERMS
BELL QUIZ ON CHAPTER 11 What is it called when a contract has been properly and completely carried out? What does the court ask when determining if the.
Administration of a FIDIC Contract - Pre-Contract Phase -
EPA CONTRACT TEMPLATE Overview
Employee statutory rights and responsibilities
EPA SUBCONTRACT TEMPLATE Overview September 2017
Performance of Contract
Extension of time and how it is granted to a contractor (Referencing JCT 2005)
Chapter 4 Contractual Rights and Obligations
Lesson: Maritime Commercial Management Week: 4 ITU Maritime Faculty
Carriage of Goods by Sea – liability of a carrier
تأجير السفن Chartering Leq(6)
Carriage of goods by sea - framework
Legal English and the Common Law AY 2017/2018
Anatomy of shipping Norhaida binti Aziz Nur Fatin Nadhrah binti Asri
Voyage Estimating Unit #6
ROLE OF THE PARTIES OF AN EMPLOYMENT RELATIONSHIP
performance of contract
Office of Attorney General
STRUCTURE OF THE PRESENTATION
Unique General Conditions of the Alabama Building Commission (ABC)
ROLE OF THE PARTIES OF AN EMPLOYMENT RELATIONSHIP
JUSTICE ADMINISTERED FUND BILL [B ] BRIEFING OF THE SELECT COMMITTEE ON SECURITY AND JUSTICE ON 8 NOVEMBER 2016.
Vienna Convention on the Law of Treaties 1969
Presentation transcript:

Commercial Shipping Unit 3 - Laytime

Laytime In commercial shipping, it is important to meet agreed deadlines. Timeliness affects both the ship owner and the charterer, resulting in profits and rewards. Failure to meet deadlines can result in breach of contract, losses, and penalties. Laytime is the ‘free time agreed between the shipowner and the charterer for the loading and discharging of the cargo” once this time period is not breached, no penalty will flow from this action. 1/15/2019 Presented by: Radcliffe Spence

Laytime In addition to voyage time, a significant factor in meeting the timelines of a shipping contract is the time taken to load and discharge cargo. The time in port to do this is called lay time. The specification and calculation of lay time is crucial in commercial shipping. The agreed terms as per charterparty is applied as such both party to the contract of carriage is obliged to perform his/her end of the bargain. Where there is a breach by either party penalty arise. 1/15/2019 Presented by: Radcliffe Spence

Statement of Fact Form This will comprises dates and times of tendering Notice of Readiness of the ship; Berthing of the vessel; Commencement of cargo operations Completion of cargo operation; Details of daily cargo work and Reasons for interruption/delay of cargo working 1/15/2019 Presented by: Radcliffe Spence

Statement of Fact Form. Apart from the charterparty clauses concerned with laytime, other vital information needed by the calculator will be provided by a Statement of Fact Form. This form which is prepared and issued by the ship’s port Agent upon the completion of the vessels visit to the port. The Statement of Fact Form will include information vital to the calculation of laytime amongst others. 1/15/2019 Presented by: Radcliffe Spence

Laytime The test as to whether a ship has “arrived” or not can be summed up as follows: Has the ship reached the ‘commercial area of the port’ or the ‘normal/usual waiting place’? Is the ship ready to perform her cargo operations? Has the Notice of Readiness(NOR) been tendered? 1/15/2019 Presented by: Radcliffe Spence

Laytime Whether freight rates are high or low, ship-owners cannot afford to delay in promptly collecting demurrage money; Charterers cannot afford to fail in speedily calculating and collecting despatch money that may be due to him/her. The laytime calculator is therefore keen to collect the statement of fact form from the ship’s agent at each port as soon as loading and discharging cargo operations are completed. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses PORT shall mean any area where vessels load or discharge cargo and shall include, but not be limited to, berths, wharves, anchorages, buoys and offshore facilities as well as places outside the legal, fiscal or administrative area where vessels are ordered to wait for their turn no matter the distance from that area. BERTH shall mean the specific place where the Vessel is to load or discharge and shall include, but not be limited to, any wharf, anchorage, offshore facility or other location used for that purpose. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses REACHABLE ON ARRIVAL shall mean that the charterer undertakes that an available loading or discharging Berth be provided to the Vessel on arrival at the Port which the Vessel can reach safely without delay. ALWAYS ACCESSIBLE shall mean that the charterer undertakes that an available loading or discharging Berth be provided to the Vessel on arrival at the Port which the Vessel can reach safely without delay. The charterer additionally undertakes that the Vessel will be able to depart safely from the Berth and without delay at any time before, during or on completion of loading or discharging. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses LAYTIME shall mean the period of time agreed between the parties during which the owner will make and keep the Vessel available for loading or discharging without payment additional to the freight. SHEX means Sunday and Holiday are excluded from laytime. SHINC means Sunday and Holiday are included in laytime. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses PER HATCH PER DAY shall mean that the Laytime is to be calculated by dividing the quantity of cargo by the result of multiplying the agreed daily rate per hatch by the number of the Vessel’s hatches. Thus:                                   Quantity of cargo         Laytime =                                                   = Days                          Daily rate x Number of hatches Each pair of parallel twin hatches shall count as one hatch. Nevertheless, a hatch that is capable of being worked by two gangs simultaneously shall be counted as two hatches. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses DAY shall mean a period of twenty-four (24) consecutive hours. Any part of a Day shall be counted pro rata. CALENDAR DAY shall mean a period of twenty-four (24) consecutive hours running from 0000 hours to 2400 hours. Any part of a Calendar Day shall be counted pro rata. CONVENTIONAL DAY shall mean a period of twenty-four (24) consecutive hours running from any identified time. Any part of a Conventional Day shall be counted pro rata. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses WORKING DAY(WD) shall mean a Day when by local law or practice work is normally carried out. RUNNING DAYS or CONSECUTIVE DAYS shall mean Days which follow one immediately after the other. RUNNING HOURS or CONSECUTIVE HOURS shall mean hours which follow one immediately after the other. HOLIDAY shall mean a Day other than the normal weekly Day(s) of rest, or part thereof, when by local law or practice work during what would otherwise be ordinary working hours is not normally carried out. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses WEATHER WORKING DAY(WWD) shall mean a Working Day or part of a Working Day during which it is or, if the Vessel is still waiting for her turn, it would be possible to load/discharge the cargo without interruption due to the weather. If such interruption occurs (or would have occurred if work had been in progress), there shall be excluded from the Laytime a period calculated by reference to the ratio which the duration of the interruption bears to the time which would have or could have been worked but for the interruption. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses WEATHER WORKING DAY(WWD) OF 24 CONSECUTIVE HOURS shall mean a Working Day or part of a Working Day of 24 consecutive hours during which it is or, if the vessel is still waiting for her turn, it would be possible to load/discharge the cargo without interruption due to the weather. If such interruption occurs (or would have occurred if work had been in progress) there shall be excluded from the Laytime the period during which the weather interrupted or would have interrupted work. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses (WORKING DAY) WEATHER PERMITTING shall have the same meaning as WEATHER WORKING DAY OF 24 CONSECUTIVE HOURS. EXCEPTED or EXCLUDED shall mean that the Days specified do not count as Laytime even if loading or discharging is carried out on them. UNLESS SOONER COMMENCED shall mean that if turn-time has not expired but loading or discharging is carried out, Laytime shall commence. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses UNLESS SOONER COMMENCED, IN WHICH CASE ACTUAL TIME USED TO COUNT shall mean that actual time used during turn-time shall count as Laytime. UNLESS USED shall mean that if Laytime has commenced but loading or discharging is carried out during excepted periods, actual time used shall count as Laytime. TO AVERAGE LAYTIME (Reversible) shall mean that separate calculations are to be made for loading and discharging and that any time saved in one operation is to be set off against any excess time used in the other. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses REVERSIBLE LAYTIME shall mean an option given to the charterer to add together the time allowed for loading and discharging. Where the option is exercised the effect is the same as a total time being specified to cover both operations. NOTICE OF READINESS shall mean the notice to the charterer, shipper, receiver or other person as required by the CharterParty that the Vessel has arrived at the Port or Berth, as the case may be, and is ready to load or discharge. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses TIME LOST WAITING FOR BERTH TO COUNT AS LOADING OR DISCHARGING TIME or AS LAYTIME shall mean that if no loading or discharging Berth is available and the Vessel is unable to tender Notice of Readiness at the waiting-place then any time lost to the Vessel is counted as if Laytime were running, or as time on Demurrage if Laytime has expired. Such time ceases to count once the Berth becomes available. When the Vessel reaches a place where she is able to tender Notice of Readiness, Laytime or time on Demurrage resumes after such tender and, in respect of Laytime, on expiry of any notice time provided in the CharterParty.  1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses WHETHER IN BERTH OR NOT (WIBON) or BERTH OR NO BERTH shall mean that if the designated loading or discharging Berth is not available on arrival, the Vessel on reaching any usual waiting place at the Port, shall be entitled to tender Notice of Readiness from it and Laytime shall commence in accordance with the Charter Party 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses WHETHER IN PORT OR NOT (WIPON) shall mean that if the designated loading or discharging Berth and the usual waiting place at the Port are not available on arrival, the Vessel shall be entitled to tender Notice of Readiness from any recognised waiting place off the Port and Laytime shall commence in accordance with the Charter Party.  VESSEL BEING IN FREE PRATIQUE shall mean that the Vessel complies with port health requirements. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses DEMURRAGE shall mean an agreed amount payable to the owner in respect of delay to the Vessel once the Laytime has expired, for which the owner is not responsible. Demurrage shall not be subject to exceptions which apply to Laytime unless specifically stated in the Charter Party. DESPATCH MONEY or DESPATCH shall mean an agreed amount payable by the owner if the Vessel completes loading or discharging before the Laytime has expired. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses DESPATCH ON ALL WORKING TIME SAVED or ON ALL LAYTIME SAVED shall mean that Despatch Money shall be payable for the time from the completion of loading or discharging until the expiry of the Laytime excluding any periods excepted from the Laytime.  DESPATCH ON ALL TIME SAVED shall mean that Despatch Money shall be payable for the time from the completion of loading or discharging to the expiry of the Laytime including periods excepted from the Laytime. 1/15/2019 Presented by: Radcliffe Spence

Charterparty Clauses Rider clauses. Standard form charterparties have been used for a very long time and their use is recommended by shipowners' P. & I. Associations because they contain clauses that have generally been tested in courts when disputes have arisen. However, some standard-form documents may contain clauses that have not kept up to date with changes in the shipping business. Both ship-owners and charterers may also want to amend standard terms and add terms, which are specific to their own needs. 1/15/2019 Presented by: Radcliffe Spence

Rider clauses The clauses in which these added terms are contained are known as "Rider clauses". The phrase means a set of additional clauses which substitute or supplement clauses in the original document. The standard form is frequently treated like a "skeleton" for basic, fundamental contractual responsibilities and rights and the Rider clauses, which are added, are like the "flesh" of the contract. If a Rider clause conflicts with a printed clause it is considered that the Rider clause prevails. The reason for this is that a typed, Rider clause expresses the intention of the parties during the negotiations more clearly than the pre-printed clauses. 1/15/2019 Presented by: Radcliffe Spence

Laytime calculator The stages of laytime calculation are: Assessing the exact commencement of laytime; Allowing for interruptions to laytime; Calculate the duration of laytime available; and Final calculation of the amount of despatch or demurrage owing. 1/15/2019 Presented by: Radcliffe Spence