Designing Seismometers

Slides:



Advertisements
Similar presentations
Invention Crusade Instructional Guide.
Advertisements

Formative assessment of the Engineering Design process
Engineering Team and Functions Dr. Chuck Lockert Gwinnett School of Mathematics, Science and Technology.
The Design Process - An Overview
Study Hall: Work quietly at your seat (homework, study, draw, read, etc.) You are not up wondering around the classroom – 1. Sharpen your pencils 2. Sit.
How organization can improve creativity Robotics and Automation Copyright © Texas Education Agency, All rights reserved. 1.
Ideation and the Engineering Design Process
Science and Engineering Practices
Work Sample: Engineering Design Grades 3-5
Bellwork How are science and technology related? Explain your answer using at least three sentences and give at least one example how they are related.
Engineering Design Process
Instant Design Challenge Using the Design Process and Engineering Notebook.
Engineering Design Process
Catapult Project Mr. McLean: 8 th Grade Physical Sciences Final Project.
Somerset Berkley Regional High School Robotics Engineering with LabView.
Friday, October 15 Objective: Students will be able to present information they have found on an engineering career. Bell Ringer: Quick Write: What is.
Engineering Design Process Objective: I will be able to describe the steps engineering design process as well as what a prototype is. Teacherspayteachers.com.
Preproduction: Engineering Design
Science and Engineering Practices K–2 Condensed Practices3–5 Condensed Practices6–8 Condensed Practices9–12 Condensed Practices Developing and Using Models.
The Engineering Design Process
Technological Design VS Engineering Design. Technological design and Engineering design are very similar and sometimes the terms are often confused with.
Engineering Design Process Objective: I will be able to describe the steps engineering design process as well as what a prototype is. Teacherspayteachers.com.
What is a Pendulum?. A pendulum is loosely defined as something hanging from a fixed point which, when pulled back and released, is free to swing down.
The Scientific Method Problem Solving for Science Detectives.
A Design Process © 2012 Project Lead The Way, Inc.Introduction to Engineering Design.
The Scientific Method.
Designing Like an Engineer!
Engineering Design Process
Instant Design Challenge
Agenda We will share updates to this year’s STEM Fair.
Engineering Design Process
Thank you for not chewing gum or anything else 
Technological Design Lesson 5.
Introduction to Physical Science
Science Fair Project: Basic Outline
Marshmallow Challenge
DESIGN CONCEPTS AND PROCESSES
TURNING IDEAS INTO REALITY: ENGINEERING A BETTER WORLD
Office of Education Improvement and Innovation
Engineering.
Engineering Design Process
TURNING IDEAS INTO REALITY: ENGINEERING A BETTER WORLD
Lesson 2- Daily Agenda for Students
Instant Design Challenge
Do Now: Answer the following in your science notebook
Reducing the Urban Heat Island Effect on Rooftops
Formative assessment of the Engineering Design process
Helping Haiti: Earthquake Resistant Structures
Testing Procedures.
Mitigating the Effects of Climate Change on Reservoir Evaporation
Engineering Bio-Plastics:
WV NxGen Standards purpose Engineering Design Products
Using Straw Rockets to Launch into Engineering Design
Procedures & Collecting Data
Airbags- Not just hot air
Designing Lunar Habitats
Just Like Kidneys: Semipermeable Membrane Prototypes
Flood Protection Structures
Sandra J. Gallardo 5th Grade Science Fair Project
Building a Model House to Withstand a Hurricane
Core Competencies for Primary School Teachers in Crisis Contexts
Instant Design Challenge
Engineers develop a new type of hybrid car that can run on gasoline, ethanol, or electricity supplied by solar panels on the car’s roof. They have made.
Suitability Test Wednesday, 22 May 2019.
Unit 6.3 Lesson 5 It is not required to use all slides in this template, adjust delivery as the lesson requires. Slides.
Goldberg Lab.
Create a list of constraints that we ALL agree upon
You may use only the supplies chosen by your team
Testing Procedures Testing Procedures
Dean of Engagement Evaluation
Presentation transcript:

Designing Seismometers Nikki Moriarty Horace Mann Middle School Abstract Project Description Assessment of Project You are a group of engineers who have been given the challenge of designing a reliable seismograph to be used to record earthquake activity by villages in impoverished areas. You have noticed that the current seismometer accessible by the village is not designed correctly. Your job is to redesign a more accurate seismograph by either adjusting the current machine or building a new machine from scratch. Your machine must be able to record motion visually on a scale of your own design. The machine which is able to record the smallest disturbance will be considered the best design. In the event of a tie, the best design will be the machine that uses the least amount of material and records the smallest disturbance. Constraints: You may bring materials from home with your boss’s (Mrs. Moriarty) approval. Anything brought from home must be easily accessible by all. Remember this is for impoverished areas. You must keep track of all materials used. You may modify the existing machine. You may build a new one from scratch. Students constructed a device with the goal of being able to detect vibrations from a rubber ball being dropped onto a science table. Students were provided with materials that they could use, as well as the ability to bring in objects with prior approval. Students were required to do all work within the classroom setting and could either build from scratch, or modify a previously tested, existing model used by the entire class. Students were required to draw and describe an initial design, keep track of all materials used and changes made, and be able to explain why those changes were necessary Evaluation: Your seismometer will be tested by conducting three trials. The trials will consist of dropping a rubber ball onto the table from 3 distinct heights (0.5m, 1.0m, & 1.5m) Students were given a handout on which they were required to record all steps of their design process. WV NxGen Standards purpose Projects were assessed informally through conversations with groups during the engineering process. At the end of the project, students were assessed using a rubric and their document. Engineering Design Products S.6-8.ETS.2- evaluate competing design solutions using a systematic process to determine how well they meet the criteria and constraints of the problem. S.6-8.ETS.3- analyze data from tests to determine similarities and differences among several design solutions to identify the best characteristics of each that can be combined into a new solution to better meet the criteria for success. S.HS.ETS.2 – design a solution to a complex real-world problem by breaking it down into smaller, more manageable problems that can be solved through engineering. Left: Team Team’s initial design for their seismometer. Right: Team Team building their second design. Attempting to create a mote stable base after their initial design toppled over during testing. Project Timeline Evaluate/Reflect 45 minute class period: meets M-F Day 1: Whole class Seismometer Lab Day 2: Initial design of individual group machines Day 3 & 4: Build of initial design Day 5: Test of all designs Day 6: Redesign and rebuild Day 7: Rebuild Day 8: Re-test Day 9: Unit test Overall, I think the project exceeded expectations. I was very nervous about completing this project because neither my students nor I had much experience with engineering design. I’m not entirely sure the students consistently used scientific reasons for their designs and changes, so that is something I need to be more cognizant of in the future. Students’ scores on the post-test seismometer questions improved compared to the pre-test. For future iterations of this project, I need to either find a table that will shake easier, or a material to drop on the lab tables that will cause more vibrations. Above: Teams working on their projects. Left: Various initial designs prior to first test phase. The least successful designs tended to be those who attempted to modify the pre-existing prototype. Most successful were designs that utilized a pen hanging from a string. Right: Only modified design that successfully registered all three test vibrations. Second design. Also only group to not build their own machine in the second trial. Acknowledgements Thank you to: Earth Science Parents for donating supplies Holly Cain Megan Bradfield Samantha Blair Dr. Deb Hemler ESS Passport Cohort 2 Mrs. Shandon Tweedy, HMMS Principal Kanawha County BOE Sources Modified from: * tryengineering.org - Seismograph project * NASA TPS Design Specifications and Test Results Sheet.