SEM Calibration in H6 Beam Line, 20cm Cupper Target

Slides:



Advertisements
Similar presentations
Lyon 2005 DIPAC Lyon th DIPAC Lyon June 2005Ulrich Raich CERN AB/BDI Instrumentation in small, low energy machines Ulrich Raich CERN AB-BDI.
Advertisements

LHC Commissioning WG 27/03/ Commissioning of BLM system L. Ponce With the contribution of B. Dehning, E.B. Holzer, M. Sapinski, C. Zamantzas and.
Report on E-165 Steve Schnetzer MCC Meeting June 28.
Ionization. Measuring Ions A beam of charged particles will ionize gas. –Particle energy E –Chamber area A An applied field will cause ions and electrons.
Beam current4 A Beam pulse length1.5 ms Power input/structure 35 MW Ohmic losses (beam on)1.6 MW RF power to load (beam on) 0.4 MW RF-to-beam efficiency.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
Debbie Harris Sacha Kopp, Commissioning Workshop 1    Beam Monitoring Hadmon will see remnant protons Muon Monitors see whatever escapes beam.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
LPROT Experiment TE/MPE/PE EN/STI EN/MME. Objectives Create the conditions to produce hydrodynamic tunneling. Benchmarking FLUKA-BIG2 simulations. Assert.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
V.L. Kashevarov. Crystal Collaboration Meeting, Mainz, September 2008 Photoproduction of    on protons ► Introduction ► Data analysis.
Conventional SEM Specimen at high vacuum – requires sample fixation and dehydration or freezing. Charging is minimized by coating sample with metal or.
Electrons capture in the air instrumentation examples1 The subject: Medical Ionization Chambers are air filled ICs In the air, electrons are captured by.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
A search for strange tribaryonic states in the reaction Heejoong Yim Seoul National University For KEK-PS E549 collaboration.
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
Secondary Emission Monitor for very high radiation areas of LHC Daniel Kramer for the BLM team.
PPAC in ZDC for Trigger and Luminosity Edwin Norbeck University of Iowa Luminosity Workshop November 5, 2004.
Highest Q 2 Polarized Measurement of the Electric Form Factor of the Neutron – E Presented by Jonathan Miller For the Hall A E Collaboration.
Beam Loss Monitor Yoshinori Sato (KEK, IPNS) Target & Monitor Sub-Group.
BLM internal beam abort request :24:50 Bernd Dehning CERN BE-BI MPP, B. Dehning.
SEM SIC SEM SIC 2 SEMs & 2 SICs closed to the Dumps 1 SIC, 1 Faraday cup & 1 SEM SEM SIC F. cup 4 similar set-ups : Girder 6,7,11 and 13 4 th – 8 th October.
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
LHC Radiation Day, B. Dehning1 Beam Loss Monitors B. Dehning.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
The photomultiplier tubes selection for KM2A electromagnetic particle detectors (EDs) hou chao IHEP The 2nd workshop of air shower detection at high altitudes.
R. Arnold SLAC 24 June 2002 Real Photon Collaboration Conceptual Design Review Beam Monitoring Instruments.
PPAC Jonathan Olson University of Iowa HCAL November 11-13, 2004.
Sensors and Detectors - 2
Results of the 2007 BLM hardware tests in LSS5
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
BEAM LOSS MONITORING SYSTEM
From: A fast high-voltage switching multiwire proportional chamber
Sensors and Detectors - 2
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Development of the muon monitor for the T2K experiment
SEM monitors tests PSI February MeV protons
BEAM LOSS MONITORING SYSTEM
CONSOLIDATION CPS-BL SYSTEM
Secondary Emission Monitor for very high radiation areas of LHC
Monday 6th August & night
Remote setting of LHC BLM thresholds?
CONSOLIDATION CPS-BL SYSTEM
Beam loss monitoring requirements and system description
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Use of Beam Loss Monitor type detectors in CNGS muon station
Proton Beam Diagnostics
Status of the Crystal Ball
SEM monitors tests PSI February MeV protons
C.Octavio Domínguez, Humberto Maury Cuna
BLM changes HV software interlock (SIS)
Sensitivity tests of BLM_S chamber in PSB dump
Commissioning of BLM system
Status of muon monitor R&D and construction
Sunday
Why do BLMs need to know the Quench Levels?
Beam Loss Simulations LHC
Report on Beam Loss Monitors
MEG II実験 液体キセノン検出器の建設状況
Tunnel hardware installation
PS-Booster Measurements for the LHC -BLM October 2002
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

SEM Calibration in H6 Beam Line, 20cm Cupper Target May 2009, 105 detectors tested

Standard Signal with Negative Offset Current 105 SEM detectors have been tested in H6 beam line In blue: raw measured data In green: corrected data (offset current is subtracted) In red: Beam charge from PIC scaled by factor 1.32 (from Geant4) 28 out of 105 had no shrinking tube and were repaired by Bernd due to missing isolation of high voltage cable

Different (Problematic?) Behaviour of Several SEM‘s Should be installed where fast losses are important (dump line, injection line); not in collimation area Should be not installed in collimation area In total: 32 SEM‘s that should be not installed in collimation area This will be excluded

Offset Current and Position Dependency Offset current vs SEM number: 22 out of 105 detectors have a (small) positive offset current but show good performance -->these detectors are not excluded Signal increase expected for positions 13...16 due to showering from the table, but the effect is small --> due to lower beam intensity compared to 2008?

Chambers with Positive Offset Current 22 Chambers with positive offset current measured Mainly offset current < 0.3pA Good detector performance

28 SEM‘s without Shrinking Tube 28 out of 105 detectors are without shrinking tube 14 out of these 28 show higher signal (factor ~10)-->need to be repaired Can be explained with different detector architecture Offset current is negative for the 28 detectors without shrinking tube

Secondary Electrons per Protons on Target Including the 14 SEM‘s without shrinking tube but higher signal Data: mean ratio=2.44, StdDev=2.61 Geant4: mean ratio=1.36,StdDev=0.06 Excluding these 14 SEM‘s Data: mean ratio=1.48, StdDev=0.61 Geant4: mean ratio=1.36,StdDev=0.06

Iist of SEMs with higher signal (signal <=> HV electrode) there were 14 SEM's without shrinking tube that should be repaired (signal electrode exchanged with HV electrode) 192 229 292 333 338 371 372 373 374 375 376 377 379 380 Cheers Annika

3 Problematic SEM‘s Nr.84 was filled with air Nr. 146 shows constant signal increase Nr. 63 shows bad performance

SEM Nr. 81 as Spare