Manual Work & Worker-Machine Systems

Slides:



Advertisements
Similar presentations
1 Unit A: General Agricultural Machinery Lesson 4: Maintaining A Safe Environment around Agricultural Machinery.
Advertisements

Capacity Planning For Products and Services
Predetermined Motion Time Systems (PMTS)
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
Process Selection and Facility Layout
Chapter 3 Time Study.
Part IV MANUFACTURING SYSTEMS
WELDING ROBOTS. INTRODUCTION Robot Welding is a process of joining different materials. The large bulk of materials that are welded are metals and their.
Direct Time Study Sections: Direct Time Study Procedure
Design of spur gear transmission
QUALITY ASSURANCE Work Load. Workload is the sum of the work achieved or to be achieved, obtained by multiplying the raw count of each individual procedure.
Worker-Machine Systems
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 8 Human Resources in Operations Management.
Maintenance Work Measurement
WORK STUDY Week 1.
Automated Production Lines
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
Ch 3 Manufacturing Models and Metrics
Chapter 10 – Facility Layout
Part IV MANUFACTURING SYSTEMS
IE 101-Industrial Engineering Orientation
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Work Measurement Time is important in work systems because of its economic significance. Most workers are paid for the time they are on the job. For any.
Part II AUTOMATION AND CONTROL TECHNOLOGIES
Manufacturing Engineering Department Lecture 1 - Introduction
Material Transport Systems
Unit 3a Industrial Control Systems
TRAINING FOR MANAGERS Fatigue in Highway Construction.
Process Planning and Computer Aided Process Planning
INDUSTRIAL ELECTRONICS CONTROL EET425/4 Lecturers Indra Nisja School of Electrical System Engineering Northern Malaysia University College of Engineering.
Manual Assembly Lines Chapter 4 Sections:
Productivity and Quality Management Lecture 14.
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Learning Curves Chapter 19 Sections: Learning Curve Theory
Computer Aided Process Planning (CAPP). What is Process Planning? Process planning acts as a bridge between design and manufacturing by translating design.
1 8 C H A P T E R Resistance Training.
UNIT 2 WORK STUDY, INCENTIVES AND SAFETY. Work study It is the systematic examination of the methods of carrying on activities so as to improve the effective.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Operational and Production Aspects of Contemporary Business Chapter Course: BUS 101 Lecturer: NNA.
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
UNIT-III Group Technology and Computer Aided Process Planning
Motion Study and Work Design
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
1 Time Study and Work Measurement Chapters: 12.Introduction to Work Measurement 13.Direct Time Study 14.Predetermined Motion Time Systems 15.Standard Data.
Maintenance Management
1 Maintenance Management. 2 Equipment Malfunctions l Equipment malfunctions have a direct impact on: l Production capacity l Production costs l Product.
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
CHAPTER III FACTORY OVERHEAD CONCEPT AND ALLOCATION OF FACTORY OVERHEAD.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
KAASHIV INFOTECH – A SOFTWARE CUM RESEARCH COMPANY IN ELECTRONICS, ELECTRICAL, CIVIL AND MECHANICAL AREAS
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
IE 366 Chapter 24 Time/Job. IE 366 Work Measurement ● Goal: determine standard time for a task. ● Techniques – Direct Time Study – Predetermined Time.
Industrial Automation and Robotics Mr. Muhajir Ab. Rahim School of Mechatronic Engineering UniMAP.
Chapter 3: Cost Estimation Techniques
Part II AUTOMATION AND CONTROL TECHNOLOGIES
Chapter 4 Introduction to Automation
Chapter 3: Cost Estimation Techniques
Work Sampling Sections: How Work Sampling Works – part 1
Process engineering Standard times.
Chapter 4 Introduction to Automation
Work Systems and How They Work
Chapter 25 Time Study Supplementary Material from:
Automation Topics: Elements of an Automated System
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
MANUFACTURING SYSTEMS
Introduction to Work Measurement
Chapter 3: Cost Estimation Techniques
Presentation transcript:

Manual Work & Worker-Machine Systems Sections: Manual Work Systems Worker-Machine Systems Automated Work Systems Determining Worker and Machine Requirements Machine Clusters Chapter 2

Three Categories of Work Systems Manual work system Worker performing one or more tasks without the aid of powered tools Worker-machine system Human worker operates powered equipment Automated work system Process performed without the direct participation of a human worker

Manual Work System

Worker-Machine System

Automated System

Some Definitions Workpiece being machined (production work) Work unit – the object that is processed by the work system Workpiece being machined (production work) Material being moved (logistics work) Customer in a store (service work) Product being designed (knowledge work) Unit operations – tasks and processes that are treated as being independent of other work activities

Manual Work Systems Human body accomplishing some physical task without an external source of power With or without hand tools When hand tools are used, the power to operate them is derived from the strength of a human worker Other human faculties are required, such as hand-eye coordination and mental effort

Pure Manual Work Involves the physical and mental capabilities of the human worker, and no machines, tools, or other implements are employed in performing the task. Material handler moving cartons in a warehouse Workers loading furniture into a moving van without the use of dollies Dealer at a casino table dealing cards Office worker filing documents Assembly worker snap-fitting two parts together

Manual Work with Hand Tools Manual tasks are commonly improved by the use of hand tools. A tool is a device or implement for making changes to some object (e.g., the work unit), such as cutting, grinding, striking, squeezing, or other process. A hand tool is a small tool that is operated by the strength and skill of the human user. Examples of manual tasks involving the use of hand tools include the following: Machinist filing a part Assembly worker using screwdriver Painter using paintbrush to paint door trim QC inspector using micrometer to measure a shaft diameter

Repetitive vs. Nonrepetitive Tasks Relatively short duration (usually a few minutes or less) High degree of similarity from one cycle to the next Nonrepetitive Task Takes a long time Work cycles are not similar

Cycle Time Variations A main objective in work design is to determine the one best method for a task, and then to standardize its use Once the method has been standardized, the actual time to perform the task is a variable because of: Differences in worker performance differences in hand and body motions Mistakes by worker Variations in starting work units The learning curve phenomenon Differences in the physical and cognitive attributes among workers performing the task Variations in the methods used by different workers to perform the task

Worker Performance Defined as the pace or relative speed of working As worker performance increases, cycle time decreases From the employer’s viewpoint, it is desirable for worker performance to be high What is a reasonable pace to expect from a worker?

Normal Performance A pace of working that can be maintained by a properly trained average worker throughout an entire work shift without injurious effect on the worker’s health or physical well-being The work shift is usually 8 hours, during which periodic rest breaks are allowed Normal performance = 100% performance Common benchmark of normal performance: Walking at 3 miles/hr

Normal Time The time to complete a task when working at normal performance Actual time to perform the cycle depends on worker performance Tc = Tn / Pw where Tc = cycle time, Tn = normal time, and Pw = worker performance or pace

Example: Normal Performance Given: A man walks in the early morning for health and fitness. His usual route is 1.85 miles. A typical time is 30 min. The benchmark of normal performance = 3 miles/hr. Determine: (a) how long the route would take at normal performance and (b) the man’s performance when he completes the route in 30 min.

Example: Solution (a) At 3 miles/hr, time = 1.85 miles / 3 miles/hr = 0.6167 hr = 37 min (b) Rearranging equation, Pw = Tn / Tc Pw = 37 min / 30 min = 1.233 = 123.3 % Alternative approach in (b): Using velocity = 1.85 miles / 0.5 hr = 3.7 miles/hr Pw = 3.7 miles/hr / 3.0 miles/hr = 1.233 %

Standard Performance Same as normal performance, but acknowledges that periodic rest breaks must be taken by the worker Periodic rest breaks are allowed during the work shift Federal law requires employer to pay the worker during these breaks Other interruptions and delays also occur during the shift

PFD Allowance Bathroom breaks, personal phone calls To account for the delays due to: Personal time (P) Bathroom breaks, personal phone calls Fatigue (F) Rest breaks are intended to deal with fatigue Delays (D) Interruptions, equipment breakdowns

Standard Time Defined as the normal time but with an allowance added in to account for losses due to personal time, fatigue, and delays Tstd = Tn (1 + Apfd) where Tstd = standard time, Tn = normal time, and Apfd = PFD allowance factor Also called the allowed time

Irregular Work Elements Elements that are performed with a frequency of less than once per cycle Examples: periodic changing of tools (e.g., changing a knife blade) Irregular elements are prorated into the regular cycle according to their frequency

Example: Determining Standard Time Given: The normal time to perform the regular work cycle is 3.23 min. In addition, an irregular work element with a normal time = 1.25 min is performed every 5 cycles. The PFD allowance factor is 15%. Determine (a) the standard time and (b) the number of work units produced during an 8-hr shift if the worker's pace is consistent with standard performance.

Standard Hours and Worker Efficiency Two common measures of worker productivity used in industry to assess a worker’s productivity are standard hours and worker efficiency Standard hours – represents the amount of work actually accomplished Hstd = Q Tstd Hstd = standard hours accomplished; Q = quantity of work units completed; Tstd = standard time per work unit Worker efficiency – work accomplished as a proportion of shift hours Ew = Hstd / Hsh Ew = worker efficiency; Hstd = # of standard hours of work accomplished; Hsh = # of shift hours (8 hr)

Worker efficiency Worker efficiency is commonly used to evaluate workers in industry. In many incentive wage payment plans, the worker’s earnings are based on his or her efficiency or the number of standard hours accomplished. Worker efficiency and standard hours are easily computed, because the number of hours in the shift and the standard time are known, and the number of work units produced can be readily counted.

Worker-Machine Systems When worker operates a powered equipment we refer to the arrangement as a worker-machine system. Examples: Machinist operating a milling machine Factory worker loading and unloading parts at a machine tool. Truck driver driving an 18-wheel tractor-trailer Worker crew operating a rolling mill that converts hot steel blocks into flat plates. Clerical worker entering data into a PC

Types of Powered Equipment Distinguished from hand tools by the fact that a source of power other than human strength is used to operate it. Common power sources are electric, pneumatic, hydraulic, and fossil fuel motors Portable power tools are light enough in weight portable power drills, rotary saws, chain saws, and electric hedge trimmers. Mobile powered equipment are generally heavy pieces of equipment Transportation equipment, agricultural and lawn-keeping, forklift trucks, electric power generator at construction site Stationary powered machines stand on the floor or ground and cannot be moved while they are operating Machine tools (e.g., turning, drilling, milling); office equipment (personal computers, photocopiers, telephones, fax machines); cash registers, heat treatment furnaces

Classification of Powered Machinery

Numbers of Workers and Machines Means of classifying worker-machine systems is according to whether there are one or more workers and one or more machines One worker and One machine Taxicab driver and taxi One worker & Multiple machines A worker tending several production machines Multiple workers and One machine Ship's crew Multiple workers and Multiple machines Emergency repair crew responding to machine breakdowns in a factory

One Worker and One Machine Good work design attempts to achieve the following objectives: Design the controls of the machine to be logical and easy to operate for the worker. Design the work sequence so that as much of the worker’s task as possible can be accomplished while the machine is operating, thereby minimizing worker idle time. Minimize the idle times of both the worker and the machine. Design the task and the machine to be safe for the worker.

Level of Operator Attention Full-time attention Welders performing arc welding Part-time attention during each work cycle Worker loading and unloading a production machine on semi-automatic cycle Periodic attention with regular servicing Crane operator in steel mill Periodic attention with random servicing Firefighters responding to alarms

Two welders performing arc welding on pipe - requires full-time attention of workers (photo courtesy of Lincoln Electric Co.)

Cycle Time Analysis in Worker Machine System In terms of cycle time analysis, worker-machine systems fall into two categories: systems in which the machine time depends on operator control, the task can be either repetitive or nonrepetitive systems in which the machine time is constant and independent of operator control, and the work cycle is repetitive.

Cycle Time with no Overlap between Worker and Machine If there is no overlap in work elements between the worker and the machine, then the normal time for the cycle is simply the sum of their respective normal times: Normal time for cycle Tn = Tnw + Tm Where Tnw = normal time for the worker-controlled portion of the cycle, min: and Tm = machine cycle time (assumed constant). Standard time for cycle Tstd = Tnw (1 + Apfd) + Tm (1 + Am) where Tnw = normal time of the worker, min; Tm = constant time for the machine cycle, min; Am = machine allowance factor, used in the equation as a decimal fraction

Worker-Machine Systems with Internal Work Elements In the operation of a worker-machine system, it is important to distinguish between the operator’s work elements that are performed in succession with the machine’s work elements and those that are performed simultaneously with the machine elements. Operator elements that are performed sequentially are called external work elements while those that are performed simultaneously with the machine cycle are called internal work elements.

Example 2.10 Internal Versus External Work Elements in Cycle Time Analysis The work cycle in a worker-machine system consists of the elements and associated times given in the table below. All of the operator’s work elements are external to the machine time. Can some of the worker’s elements be made internal to the machine cycle, and if so, what is the expected cycle time for the operation?  

Comment Although the total times for the worker and the machine are the same as before, element 4 in the revised cycle (which Consists of elements 1, 2, and 6 from the original work cycle) is performed simultaneously with the machine time, resulting in the following new cycle time: Tc = 0.10 + 0.12 + 0.75 = 0.97 min This represents a 34% reduction in cycle time, which translates into a 53% increase in production rate. When internal elements are present in the work cycle, it must then be determined whether the machine cycle time or the sum of the worker’s internal elements take longer.

Automated Work Systems Automation is the technology by which a process or procedure is accomplished without human assistance Implemented using a program of instructions combined with a control system that executes the instructions Power is required to drive the process and operate the control system

Levels of Automated Systems Semiautomated machine Performs a portion of the work cycle under some form of program control Human worker tends the machine for the remainder of the cycle, by loading and unloading it Operator must be present every cycle Fully automated machine Operates for extended periods of time with no human attention

Automated robotic spot welding cell (photo courtesy of Ford Motor Company)