Team 5 Cost QDR Scott Bird Mike Downes Kelby Haase Grant Hile

Slides:



Advertisements
Similar presentations
SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 Design.
Advertisements

AAE 451 Aircraft Design Aerodynamic Preliminary Design Review #2 Team Members Oneeb Bhutta, Matthew Basiletti, Ryan Beech, Mike Van Meter.
Heavy Lift Cargo Plane Proposal Presentation February 17 th, 2005 Matthew Chin Advisor: Prof. S. Thangam Aaron Dickerson Brett J. Ulrich Tzvee Wood.
Group 3 Heavy Lift Cargo Plane William Gerboth, Jonathan Landis, Scott Munro, Harold Pahlck February 18, 2010.
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
Team USYD National Aircraft Design-Build-Fly Competition.
AAE 451 Aircraft Design Aerodynamic Preliminary Design Review #1
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
October 23, 2003Propulsion QDR1 Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson.
November 12, 2003QDR1 Team 5 Structures and Weights QDR #2 Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Structures 1 PDR Team “Canard” October 12th,
Rear spar for control surface hinges Styrene foam wing core Balsa spars carry bending load 0.25 in x 0.25 in T.E. Reinforcement Materials Employed: Balsa:
Heavy Lift Cargo Plane Group #1 Matthew Chin, Aaron Dickerson Brett J. Ulrich, Tzvee Wood Advisor: Professor Siva Thangam December 9 th, 2004.
SAE Heavy Lift Cargo Plane Advisor: Siva Thangam Group Members: Will Gerboth Jon Landis Scott Munro Harold Pahlck.
November 6, 2003QDR1 Team 5 Aerodynamics QDR #2 Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson.
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
AAE 451 – Fall 2003 Ares Team Mir Rashiduzzaman Alethea Tan Kai-Hui Leong Darwin Lisan Jung Hyun Ahn John Ko.
Model Aircraft Tools, Materials, and Techniques. Open Structure with Iron-on Film Covering.
1 AE 440 Structures Discipline Lecture 6 Eric Loth For AE 440 A/C Lecture.
[SAE Heavy Lift Cargo Plane] Joe Lojek : James Koryan : Justin Sommer : Ramy Ghaly [Ducks on a Plane] : Advisor Professor Thangam : Thursday, February.
Balsa Glider Construction
SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 Design.
Total Item Price: $ Dollars. Website: Price: $60.00.
Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”
The Lumberjacks Team /16/12 Brian Martinez.
Group 10 Dimitrios Arnaoutis Alessandro Cuomo Gustavo Krupa Jordan Taligoski David Williams 1.
AVIATION By Daniel Velare. Airplanes  An Airplane Consist of five major parts  WING  POWERPLANT  LANDING GEAR  FUSELAGE  EMPENAGE  An Airplane.
Overview Project Schedule Competition Technology Report Construction Progress Future Work Conclusion.
Aircraft Familiarization
Material and Geometric Properties of the Boeing ER Oscar Ardila Civil Engineering Purdue University.
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
December 1, 2003PDR1 Team 5 Structures and Weights PDR #2 Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson.
SAILBOT Meeting Notes 9/21/2014. GENERAL ACTION ITEMS New Fuse for controller - Sarah T-shirts – Parker Bio for Website – (Everyone to
October 2, 2003PPR1 Team 5 PPR Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson.
P16121: SAE Aero Aircraft Design & Build
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Structures Preliminary Design Review #1 October 12, 2000.
Basic Aircraft Structure
STRUCTURES & WEIGHTS PDR 1
Team 3 Structures and Weights PDR 2
Aircraft Design Process
AAE 451 Senior Design – Critical Design Review
Team “Canard” September 28th, 2006
SAE Heavy Lift Cargo Plane
Structures and Weights 1 QDR
FINAL REVIEW UAV AIRFRAME B
Team 5 Propulsion PDR Scott Bird Mike Downes Kelby Haase Grant Hile
STRUCTURES & WEIGHTS PDR 2
Team 5 D&C QDR Scott Bird Mike Downes Kelby Haase Grant Hile
Balsa Glider Construction
SAE Aero East 2017 MAE 435 Mid-Term Progress Presentation
Structures and Weights Preliminary Design Review
NİŞANTAŞI ÜNİVERSİTESİ
Basic Aircraft Structure
Structures Overview Material Properties Structures Construction
Presented by Melissa Doan and Jason Hargraves
Team 5 – Propulsion QDR #2 Scott Bird Mike Downes Kelby Haase
Cost Analysis QDR AAE451 – Team 3 December 4th, 2003
COST QDR TEAM 4 Jared Hutter, Andrew Faust, Matt Bagg, Tony Bradford,
Prototype Fabrication, Economic, & Test Plan QDR
Team 5 Aerodynamics PDR #2
Team 5 Structures and Weights QDR #1
Team 5 - Propulsion PDR #2 Scott Bird Mike Downes Kelby Haase
Propulsion QDR Scott Bird Mike Downes Kelby Haase Grant Hile
Aerodynamics PDR # 2 AAE451 – Team 3 November 18, 2003
Team 5 Aerodynamics QDR #1
Structures PDR #1 AAE451 – Team 3 October 28, 2003
Balsa Glider Construction
STRUCTURES & WEIGHTS QDR 1
Presentation transcript:

Team 5 Cost QDR Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson December 4, 2003 QDR

Preview Walk-around Airframe Costs Engineering Costs Cost Cutting December 4, 2003 QDR

Walk-around Data Boom Robust Wing Tractor Engine Detachable Pod Simple Fuselage Design December 4, 2003 QDR

Airframe Costs 391.00 total cost ($) Wing caps 42.00 front spar 25.48   total cost ($) Wing caps 42.00 front spar 25.48 rear spar 14.28 ribs 19.00 attachment 5.00 covering 54.95 Pod rods 10.99 vertical 6.20 horiz 13.99 lexan sheet 4.79 Fuselage booms 95.40 Main Gear 49.99 Tail vertical tail 23.94 tail wheel 24.99 391.00 December 4, 2003 QDR

Tower Hobbies Holiday Savings Spree! Order by December 31 and SAVE UP TO $100.00! If Your Order Totals: $300.00 - $399.99 YOU SAVE $20.00 Refer to Ad # 011MG December 4, 2003 QDR

$ 89,038 $ 109,161 Total to date Semester Prediction Engineering Costs Total to date 938 hours $ 89,038 Semester Prediction 1150 hours $ 109,161 Costs calculated based on Raymer’s Engineering rates (1999 dollars) adjusted to 2003 dollars December 4, 2003 QDR

Questions? Questions?? December 4, 2003 QDR

dimensions (in x in x in) Airframe Parts   quantity dimensions (in x in x in) material Wing caps 2 1.25x.75x168 spruce front spar 1 1.5x.75x168 rear spar 2.25x.125x168 ribs 14-16 24x.0625x24 balsa attachment 4 .75x2 covering 5 168x2.88x24 monokote Pod rods .75x.25x1.5 aluminum vertical 2.625x.25x10 horiz 2x2.625x14 lexan sheet 8x12x.30 lexan Fuselage booms 4x.5x108 Main Gear composite Tail vertical tail 30x2x36 tail wheel December 4, 2003 QDR

Chief Aircraft Inc website Aircraft Spruce website Prices Chief Aircraft Inc website Aircraft Spruce website Wicks Aircraft Supply website Tower Hobbies website December 4, 2003 QDR