European Network of Transmission System Operators for Electricity

Slides:



Advertisements
Similar presentations
Source: Results for the European PHS potential. A GIS based study Marcos Gimeno-Gutiérrez Roberto Lacal-Arántegui.
Advertisements

Knowledge Management LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
1 Survey Data in ECA : Frequency, Coverage, Consistency and Access By Victor Sulla ECS-PE.
European integration 1www.ecb.europa.eu © Progress of European integration 1952ECSC European Coal and Steel Community 1958 EEC and EURATOM European Economic.
Knowledge Management and Transition ICM Cluj-Napoca, 24th April 2015.
European Union The Gay Perspective SCOREBOARD V 2.0.
Directive 95/50/EC TDG Checks Application of Annexes Erkki Laakso EUROPEAN COMMISSION DG ENERGY & TRANSPORT TDG Checks Riga June 2006.
ELSA Law Schools ICM Cluj-Napoca, 21st April 2015.
Date: in 12 pts Education and Culture International mobility for students and staff 2015 Call for Proposals.
THE EUROPEAN UNION. HISTORY 28 European states after the second world war in 1951 head office: Brussels 24 different languages Austria joined 1995.
Make it Smart&Creative ICM Cluj-Napoca, 21st April 2015.
ELSA as the Franchise? LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
Erasmus+ International Credit Mobility Call for Proposals 2016
ELSA Summer Law Schools IV KAM Prague, 3rd to 7th September 2014.
THE EUROPEAN UNION.
Computer Class – Summer 20092/21/2016 3:45 AM European Countries Albania Andorra Austria Belarus Belgium Bosnia and Herzegovina Bulgaria Croatia Czech.
EIE- Surveyor 1 Financial aspects ► 40 % amount 45 days after initial contract (about December2005) ► 40 % 45 days after approval of the progress report.
The European Law Students’ Association Albania ˙ Austria ˙ Azerbaijan ˙ Belgium ˙ Bosnia and Herzegovina ˙ Bulgaria ˙ Croatia ˙ Cyprus ˙ Czech Republic.
Progress of European integration
Programme for International Student Assessment
Table 1. New HIV diagnoses by country, EU/EEA, 2010–2014
TRADE CONTACT GROUP Brussels 9th June 2009 Agenda item 3a) State of play of IT systems: Import Control System (ICS); Export Control System (ECS); New.
Gas Regional Initiatives
DISTRIBUTION AUTOMATIC - GENERATION
Table 1. Cases of reported, confirmed cases of invasive meningococcal disease: number and rate per population, EU/EEA, 2010–2014 Country
Country Cases Rate National data Report type
Table 1. Reported invasive Haemophilus influenzae cases: number and rate per population, EU/EEA, 2010–2014 Country Con­firmed.
Country Cases Rate National data Report type
GTE+ Winter Outlook 2008/2009 Final Version,
Table 1. Cases of reported, confirmed cases of invasive pneumococcal disease: number and rate per population, EU/EEA, 2010–2014 Country
Point 5. Countries plans on Time Use Surveys
Country Cases Rate National data Report type
Cases Rate National data Report type
Table. Yellow fever, surveillance systems overview, 2014
The European Parliament – voice of the people
The European Parliament – voice of the people
ESF FINANCIAL EXECUTION PART 1 STATE OF PLAY END 2016
Country Cases Rate National data Report type
European survey respondents by region.
CAF Activities.
Transmission, processing and publication of the HBS 2015 data
Table 1. Number and rate of Legionnaires’ disease cases per population by country and year, EU/EEA, 2011–2015 Country
EU: First- & Second-Generation Immigrants
Table 1. Number of reported confirmed LGV cases, EU/EEA, 2010–2014
MSFD Scoreboard Status at 23 November 2012 Belgium Bulgaria Cyprus
Country Cases Rate National data Report type
Table 1. Number and rate of reported confirmed gonorrhoea cases per population, EU/EEA, 2010–2014 Country Cases Rate Austria.
Marine Strategy Framework Directive: Transposition and Implementation
Table 1. Number and rate of reported confirmed chlamydia cases per population, EU/EEA, 2010–2014 Country Cases Rate Austria.
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Country Cases Rate National data Report type
General Delegate Euro Contrôle Route
Country Cases Rate National data Report type
European Union Membership
Table. Plague, surveillance systems overview, 2014
Marine Strategy Framework Directive: Transposition and Implementation
Marine Strategy Framework Directive: Status of reporting
Country Cases Rate Austria   Belgium Bulgaria
Overall 2011 ESF Budget Execution
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
European representation of respiratory critical care HERMES participants. European representation of respiratory critical care HERMES participants. Countries.
Cross Acceptance State of play Jan 2014 RISC.
Marine Strategy Framework Directive: Status of reporting
Marine Environment and Water Industry Unit
Table 1. Locally acquired cases of West Nile fever: number and rate per population, EU/EEA, 2010–2014 Country Cases Rate.
Textile. Clothing. Leather. Shoes.
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Country Cases Rate National data Report type
Marine Strategy Framework Directive: Status of reporting
The Convention on Long-range Transboundary Air Pollution
Presentation transcript:

European Network of Transmission System Operators for Electricity By: PAVEL Gabriel

What is EnTSo-e? The European Network of Transmission System Operators for Electricity speaks for all electric TSOs in the EU and others connected to their networks, with one voice for all regions, and for all their technical and market issues.

Tso-definition Transmission System Operators (TSOs) are responsible for the bulk transmission of electric power on the main high voltage electric networks. TSOs provide grid access to the electricity market players (i.e. generating companies, traders, suppliers, distributors and directly connected customers) according to non-discriminatory and transparent rules. In order to ensure the security of supply, they also guarantee the safe operation and maintenance of the system. In many countries, TSOs are in charge of the development of the grid infrastructure too. TSOs in the European Union internal electricity market are entities operating independently from the other electricity market players.

History OF ENTSO-E On 27 June 2008, 36 European electricity transmission system operators (TSO) signed in Prague a declaration of intent to create the ENTSO-E. The ENTSO-E was established on 19 December 2008 in Brussels by 42 TSOs as a successor of six regional associations of the electricity transmission system operators. The ENTSO-E became operational on 1 July 2009. The former associations ETSO, ATSOI, UKTSOA, NORDEL, UCTE and BALTSO became a part of the ENTSO-E, while still offering data by their predecessors for public interest.

1. ATSOI - Association of the Transmission System Operators of Ireland On 01 July 2009 ATSOI was wound up. All operational tasks were transferred to ENTSO-E 2. BALTSO - Baltic Transmission System Operators On 01 July 2009 BALTSO was wound up. All operational tasks were transferred to ENTSO-E. 3. ETSO - European Transmission System Operators On 01 July 2009 ETSO was wound up. 4. Nordel On 01 July 2009 Nordel was wound up. 5. UCTE - Union for the Coordination of the Transmission of Electricity On 01 July 2009 UCTE was wound up. 6. UKTSOA - UK Transmission System Operators Association

Countries of the ENTSO-E member companies 17.Ireland (IE) 18.Iceland (IS) 19.Italy (IT) 20.Lithuania (LT) 21.Luxembourg (LU) 22.Latvia (LV) 23.Montenegro (ME) 24.Fyrom (MK) 25.Netherlands (NL) 26.Norway (NO) 27.Poland (PL) 28.Romania (RO) 29.Serbia (RS) 30.Sweden (SE) 31.Slovenia (SL) 32.Slovak Republic (SK) 1.Austria(AT) 2.Bosnia and Herzegovina (BA) 3.Belgium (BE) 4.Bulgaria (BG) 5.Switzerland (CH) 6.Cyprus (CY) 7.Czech Republic (CZ) 8.Germany (DE) 9.Denmark (DK) 10.Estonia (EE) 11.Spain (ES) 12.Finland (FI) 13.France (FR) 14.United Kindom (GB) 15.Croatia (HR) 16.Hungary (HU)

In conclusion Europe’s electricity consumption is almost 3000 TWh per 1 year! In Europe are near upon 500 milion consumers! The cost of electricity for 1 year is ≥ 240.000.000.000 Euro!

Main tasks Elaboration and establishment of network codes Ensure coordination of network operation by common network operation tools Develop a ten-year network development plan Publish annual work program, annual report and annual summer and winter generation adequacy outlooks Security of supply Meeting the needs of the Internal Energy Market and facilitating market integration Promotion of relevant R&D and the public acceptability of transmission infrastructure Consultation with Stakeholders and positions towards energy policy issues

Electronic data interchange Frequency In order to ensure a working European power grid, the operating frequency is defined by a standard of 50 hertz. As electric generation and consumption differs, the power transmission grid has to be balanced. There should be the same amount of input and output. Nevertheless changes in the frequency may occur if supply or demand exceeds its counterpart. In case of too much supply the frequency will increase, while in case of too much demand it will decrease. The main task is to keep the frequencies of all five synchronous areas balanced around the 50 hertz standard to ensure a safe power supply. Electronic data interchange An open European electricity market needs a considerable electronic data interchange between all market participants in order to improve the coordination between different inter-country systems. The aim of the ENTSO-E is to offer all participants the necessary information of the existing EDI standards and their specifications. In association with ebiX and EFET (European Federation of Energy Traders) ENTSO-E maintains a Harmonized role model for the European electricity market

System developement The ENTSO-E will publish a ten-year network development statement, which ought to ensure the reliability and security of electric energy supply in Europe. An adequate grid should be available for the functioning of the European electricity market. The committee will introduce technical rules and standards related to the planning of transmission systems and new technical concepts within R&D-activities. Furthermore it will focus on facilitating the exchange of information about efficient asset management, system technology and critical infrastructure protection among members. In order to fulfill its duties and tasks, the committee will investigate and develop long-term and medium-term system extension strategies, draw system studies and collect data relevant for system development.