6/3/2014 IENG 471 Facilities Planning 1 IENG 471 - Lecture 04 - 3 Schedule Design: The Sequels Sequel.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
Delta Confidential 1 5/29 – 6/6, 2001 SAP R/3 V4.6c PP Module Order Change Management(OCM)
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
and 6.855J Cycle Canceling Algorithm. 2 A minimum cost flow problem , $4 20, $1 20, $2 25, $2 25, $5 20, $6 30, $
We need a common denominator to add these fractions.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
C1 Sequences and series. Write down the first 4 terms of the sequence u n+1 =u n +6, u 1 =6 6, 12, 18, 24.
ZMQS ZMQS
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
© S Haughton more than 3?
VOORBLAD.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Twenty Questions Subject: Twenty Questions
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Energy & Green Urbanism Markku Lappalainen Aalto University.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
This, that, these, those Number your paper from 1-10.
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
How Cells Obtain Energy from Food
9/10/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
10/25/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
Presentation transcript:

6/3/2014 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequels Sequel

6/3/2014IENG 471 Facilities Planning 2 Agenda Assignments Schedule Design – Part 3: Operator/Machine Assignments Ideal Assignment Total Cycle Time Operation Times Operator Idle Time Machine Idle Time Estimating Cost per Unit Questions & Issues

6/3/2014IENG 471 Facilities Planning 3 Assignments Current Assignment: HW:(HW 3) See Assignment Link required input for each of the workstations equipment necessary for each machine steady state cycle time for each machine ideal machine assignment for each machine compute the idle time unit cost at each workstation total cost per good unit square footage for each workstation and the total space required We will use class time next period to work this problem So sit with the people that you want to work with on this assignment!

6/3/2014IENG 471 Facilities Planning 4 Ex: Injection Mold Rubber Feet We obtain one set of feet per cycle Machine time is 35 s (steady state) after the operator starts the process At the start of each cycle, the operator will spend 5 s unloading moldings from the machine and spraying release agent on the mold halves before starting a machine cycle During automatic injection cycle, operator trims feet (15 s) and feeds re-grind & virgin material into machine hopper (10 s)

6/3/2014IENG 471 Facilities Planning 5 Ideal Machine Assignment Neglects idle time: Where: a = concurrent activity time (both op & mach tied up) b = independent operator activity time t = independent machine activity time

6/3/2014IENG 471 Facilities Planning 6 Cycle Time: Cycle time ( T c ): Where: a = concurrent activity time (both op & mach tied up) b = independent operator activity time t = independent machine activity time m = number of identical machines assigned to op. n = ideal number of identical machines assigned to op.

6/3/2014IENG 471 Facilities Planning 7 Idle Machine Time: Idle time for machine ( I m ): Where: a = concurrent activity time (both op & mach tied up) b = independent operator activity time t = independent machine activity time m = number of identical machines assigned to op. n = ideal number of identical machines assigned to op.

6/3/2014IENG 471 Facilities Planning 8 Idle Operator Time: Idle time for operator ( I o ): Where: a = concurrent activity time (both op & mach tied up) b = independent operator activity time t = independent machine activity time m = number of identical machines assigned to op. n = ideal number of identical machines assigned to op.

6/3/2014IENG 471 Facilities Planning 9 Total Cost per Unit: Based on assigning m machines per operator, total cost ( TC(m) ) is: Where: C o = cost per operator-hour C m = cost per machine-hour a = concurrent activity time (both operator & machine tied up) b = independent operator activity time t = independent machine activity time m = number of identical machines assigned to operator n = ideal number of identical machines assigned to operator Add this to the material cost total from the BOM!

6/3/2014IENG 471 Facilities Planning 10 Idle & Costing Example (cont.) Assume t = 35s Case A: Operator is assigned 1 machine Case B: Operator is assigned 2 machines Case C: Operator is assigned 1.3 machines

6/3/2014IENG 471 Facilities Planning 11 Example: Ideal Machine Assign. Neglecting idle time: Where: a = 5s (load/unload) b = 15s (trimming) + 10s (feeding) = 25s t = 40s (cycle time) – 5s (load/unload) = 35s

6/3/2014IENG 471 Facilities Planning 12 Cycle Time: 1 Machine/Operator Cycle time ( T c ): Where: a = 5s b = 25s t = 35s m = 1 n = 1.3 M#1

6/3/2014IENG 471 Facilities Planning 13 Cycle Time: 2 Machines/Operator Cycle time ( T c ): Where: a = 5s b = 25s t = 35s m = 2 n = 1.3 M#2 M#1

6/3/2014IENG 471 Facilities Planning 14 Cycle Time: 1.3 Machines/Operator Cycle time ( T c ): Where: a = 5s b = 25s t = 35s m = 1.3 n = machines 3 operators M#3 M#1 = 1.3

6/3/2014IENG 471 Facilities Planning 15 Idle Machine Time: 1 Mach/Op Idle time for machine ( I m ): Where: a = 5s b = 25s t = 35s m = 1 n = 1.3 M#1 Im faster than one machine, so the machine is always busy!

6/3/2014IENG 471 Facilities Planning 16 Idle Machine Time: 2 Mach/Op Idle time for machine ( I m ): Where: a = 5s b = 25s t = 35s m = 2 n = 1.3 M#2 M#1 Im slower than two machines, so now Im always busy!

6/3/2014IENG 471 Facilities Planning 17 Idle Machine Time: 1.3 Mach/Op Idle time for machine ( I m ): Where: a = 5s b = 25s t = 35s m = 1 n = machines 3 operators M#3 M#1 = of us are just as fast as 4 machines, so everything is always busy!

6/3/2014IENG 471 Facilities Planning 18 Idle & Costing Example (cont.) Assume the Following Costs: Operator Wage = $15/hr Operator Overhead = 40% Electricity Cost/Machine = $6/hr Maintenance Cost/Machine = $1/hr Computing the Cost per Unit Components: C o = Cost per Operator-Hour: $15/hr + (.40)($15/hr) = $21/hr C m = Cost per Machine-Hour: $6/hr + $1/hr = $7/hr

6/3/2014IENG 471 Facilities Planning 19 Total Cost per Unit: Based on assigning 1 machine per operator: Where: C o = cost per operator-hour C m = cost per machine-hour

6/3/2014IENG 471 Facilities Planning 20 Total Cost per Unit: Based on assigning 2 machines per operator: Where: C o = cost per operator-hour C m = cost per machine-hour

6/3/2014IENG 471 Facilities Planning 21 Total Cost per Unit: Based on assigning 1.3 machines per operator: Where: C o = cost per operator-hour C m = cost per machine-hour