HISD Educational Learning Center STAFF PARKING Yellow Tag LOT

Slides:



Advertisements
Similar presentations
Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.
Advertisements

Wendover Renovation Presentation Presentation Overview Renovation Stages Before Now After How you will be affected Questions/Concerns.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
NGA Collaboration Forum 11 December 2013 VCC Parking Lot.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
2012 Town Hall Meeting. Parish History Master Plan Phase 1 Costs Next Steps Parish Survey 2012 Town Hall Meeting Questions + Answers Agenda.
Current Project Update October 25th 2012 Good Evening!!!
KINESIOLOGY/ ATHLETICS COMPLEX PALOMAR COLLEGE. Process.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Quarterly Report September 9, I Lafayette Elementary - New flooring.
Glenvar High School Renovations School Board Presentation
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
Suisun Valley School K Classroom Addition Project.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
MASTER PLAN FEBRUARY 15,2012.
East Hall VOLUNTEERS Discovery Room Shop4Science Cafe PORTICO Rotunda Entrance Foyer Rotunda Vestibule West Hall FIRE EXIT REST ROOMS FIRE EXIT REST ROOMS.
ADDITION & REMODEL Eugene Field Elementary School.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
HIGH SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
15 April 2010 Georgian Heights Alternative Elementary School New Building and Site Plan.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
POV Renovations November 14,2014. Repairing the East Wall.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
MOORE HIGH SCHOOL.  Drills are a first and important step in keeping schools safe and secure. They are filled with teachable moments!
THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.
HBA Event: Maps & Fuqua CLICK for Complete MAP of Fuqua CLICK for Complete MAP of Fuqua.
MIDDLE SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
Facilities for a Quality Child Development Program Child Services II.
DON’T PANIC Mesa County Public Library District Evacuation Procedures These are general instructions and procedures. Every situation is different. Use.
Construction Report July 15, Projects KMS Phase I TAC Performance Contract Carroll Elementary KMS Phase II –Royalwood / Monahan Elementary –KHS.
WSMS Emergency Procedures:. Culture of Safety 1. Follow procedures when walking down the hall—Walk on the Right 2. Keep your hands to yourself 3. Cameras.
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
Facilities Focus Group
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Wilson Addition. Wilson Addition.
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
AERIAL MAP KEY GUIDE PARKING LOTS: LETTERS A-G CAMPUS GATES: NUMBERS ENTRANCES TO BUILDING: MAIN M CAFETERIA-FRONT CF THEATER.
Evacuation Route Power Point
PRINCE Of WALES First Floor Portable 4 Portable 2 To Mini School
Main entrance To the hall.
Goding Elementary Existing Conditions Presentation February 13, 2013.
From Lobby Entrance: Circulation Desk with proposed café area to left
Facilities Update November 17, 2017
Southwest State University – 2nd Floor Charter Hall (CH)
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
801 Brickell Avenue 9th Floor Miami, FL 33131
Student Drop-off / No parking area Bailey Boswell Road – 1ST Floor
Summer 2017 Projects DV Campus.
Cafeteria Entrance to media center
HISD Educational Learning Center
Welcome to the Stanford Synchrotron Radiation Laboratory (SSRL) at the Stanford Linear Accelerator Center (SLAC) * 2575 Sand Hill Road, Menlo Park, CA.
Cafeteria exit exit Entrance to media lobby 12
BY HERBER.
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.
Spectator Entrance/Exit
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

HISD Educational Learning Center STAFF PARKING Yellow Tag LOT 10725 Mesa Drive (77078) previous NF campus Cowart Football Stadium EAST PARKING LOT Visitor Lot 3 Entrance/ EXIT Little York Gate 1035 Tennis Court Loading Dock 1067 Kitchen CLOSED A 1036 1034 A 1037 1033 ACADEMIC Ctr Old Gym CLOSED 1029 CLOSED 1066 1066 1038 DMOL 1032 DMOL 1069 B C D NORTH PARK-ING LOT 1070C – Health/PE. 1070G 1065 1039 1031 DMOL A HALLWAY 8 1064 1040 1 2 3 4 K-Kitchen F - Open Space E 1063 1030 DMOL HALLWAY 4 HALLWAY 4 1058 1058A 1047 1060 1041 1027 Court yard 1028 CLOSED Behind Stage O O S/R S/R 1042 1026 1024-1025 1022-1023 1026A HALLWAY 7 1057 S/R O ROTC Building Phase 2 1070A 1070 HALLWAY 2 (Achievement) HALLWAY 2 HALLWAY 3 (Success) HALLWAY 3 No access (Wall) RR 1056 Cafetorium 1043 1015 Auditorium CLOSED Storage Room Storage Room Court yard Classroom Classroom 1071 1108 Ldrshp 1080 Ldrshp 1055 1044-1045 Grass Area 1072 Studio 1054 Plane/anchor 1109 1109-A 1110 Ldrshp 1078 Ldrshp 1079 1073 HALLWAY 5 STAFF PARKING Yellow Tag LOT HALLWAY 6 (Leadership) 1053 1046A 1077 1075-1076 1074 B 1046F H G C 1052A 1052 1051 1050 1049 1049A 1046 OSL 1021 1017B D 1020 Events 1017B 2 WINDOW E 1016 New Gym Athletics LIBRARY HALLWAY 1 HALLWAY 1 HALLWAY 1 INCLINE MAIN Office ENTRANCE/ EXIT MESA Road 1000 1001 1002 1003A 1004 1005 1006 1007 1008 PD Op B A 1009 1010 Foyer 1011 B N 1012 1013 1 5 4 1003B C 1011 A C F L M 1014 1014A D D H I ENTRANCE G ENTRANCE MESA Road Handicap and Reserved Visitor parking spaces 1st FLOOR Version 12 (10-15-18)

HISD Educational Learning Center 2nd floor HISD Educational Learning Center 10725 Mesa Drive (77078) previous NF campus Version 12 (10-15-18) 2036 Dual Lang. 2065 – 2066 2037 Elem Science . 2037A 2035 2038 2064 Elem. Math ECH 2063 2062 2039 2034 Roof HALLWAY 10 2033 2032 Common Area 2058 -A 2058 Work Room (Open to Cafetorium) 2059 2059A 2060 2040A 2040 HALLWAY 12 (Collaboration) 2031 Conference Room 2057 Secondary 2030 2067 Tech Lab 2041 HALLWAY 11 (Excellence) 2056 2042 2029 Auditorium 2068 Elem 2078 2077 2055 2043 2028 2069 CFS PD HALLWAY 13 (MENTORING) 2054 CFS PD 2044 2027 2079 Conf Rm 2076 2070 _____ 2053 ML 2045 Second Science 2026 RR 2080 2075 2074 2073 2073A 2072 Work Rm 2071 2052 2050 A B 2048 2047 C 2046 2025 2024 2022 2021 2049 2045A 2023 HALLWAY 9 HALLWAY 9 HALLWAY 9 INCLINE 2000 2001 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 - 2015 2016 2017 2018 2019 KEY Restroom Mechanical/Plant Training Room CLOSED Area A-phone &/or Keycard Storage Science Lab Large Training Area BREAK Room Fire Extinguisher