Presented by: John Antanies Principal and Founder

Slides:



Advertisements
Similar presentations
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using PI for Reporting Regional Seminar Series Skye Blair and Alan.
Advertisements

What is a Good SmartSignal Model?
VALUE NOW: Using PI Data to Improve and Optimize Process Control John Cunningham The RoviSys Company.
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
Information delivery and reporting with Wonderware tools Ernst van Wyk Wonderware Southern Africa.
Event Management & ITIL V3
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Microsoft Reseach, CambridgeBrendan Murphy. Measuring System Behaviour in the field Brendan Murphy Microsoft Research Cambridge.
Building Dashboards SharePoint and Business Intelligence.
Model Based Event Detection in Sensor Networks Jayant Gupchup, Andreas Terzis, Randal Burns, Alex Szalay.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
IMPROVEMENT MODEL. THE MODEL FOR IMPROVEMENT There are three fundamental questions that can be used to guide improvement efforts. Then using Plan – Do.
Implementing eMaintenance using i SCADA technology for Wisma Persekutuan Melaka By Nurhaizan JKR Mekanikal Melaka Case Study Published by permission and.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Moderator Don Pearson Chief Strategy Officer Inductive Automation.
Performance Margins for Snowmaking
Best Practices Consortium
Striving for Operation Excellence Using CPM CX
Quality.
The Effect of the 2016 Presidential Election on Humana Stock
IL Marking Get out your CPU / Memory answers Swap with someone else
AP CSP: Cleaning Data & Creating Summary Tables
Bread Production Line Screen Images
Manufacturing Productivity Solutions
Control Charts for Attributes
Unit #6 - Basic Quality Control for the Clinical Laboratory
Cleveland SQL Saturday Catch-All or Sometimes Queries
Debugging Intermittent Issues
Connected Maintenance Solution
HW 9 Key.
Earned Value Management
Connected Maintenance Solution
Debugging Intermittent Issues
8/29/2018 The Quickest Way to Extract Trends and Alerts from Massive Amount of Text Case Study “Economic Recovery & Interest Rates Trends” Company.
Software Quality Engineering
Maintain the Reliable Performance of your Car Engine.
Simple ways to Identify, Prevent and Fix QuickBooks Corrupted File In fact, this software helps businesses in managing their finances. Even though QuickBooks.
Actuaries Climate Index™
August 23, 2000 R.N. Dubois Dow Chemical
MD Online IEP System Instructional Series – PD Activity #7
Track 2 - Wednesday, 9:00am to 10:15AM
DSQR Training Process Capability & Performance
Selling IIoT Solutions to OEMs
Eliminating the Variance
BMC TrueSight Capacity Optimization (BCO)
Process Capability.
Beginning the Driving Conversation
How to improve production efficiency
Get.
The Second One Hundred Sight Words
Breakout 1 – River Birch ABC Wednesday 1:00PM – 2:15PM KPI Reporting & Calculations Scott Dorner – Claros Product Manager, Hach.
Selling IIoT Solutions to End Users
DMAIC STANDARD WORK TEMPLATE
Hanford Performance Indicator Forum Statistical Process Control June 2005 Steven S Prevette
Hanford Performance Indicator Forum
Measuring Success How to use simple bug database queries and reports
Histograms: A Valuable Tool for Quality Evaluation
Operations Management
DMAIC STANDARD WORK TEMPLATE
data backup & system report
Expert Group on Quality of Life Indicators
Understanding How the Ranking is Calculated
Applying linear and median regression
The Life Cycle of a Trend Savannah River Nuclear Solutions, LLC
Planning a Budget Chapter 28 5/30/2019.
Quarterly Reflection Tool Workshop
Social Media Campaign Overview Matthew Fichera
Business Case Template
Presentation transcript:

Leveraging Process Data Historians: Data Analytics for Mechanical and Process Monitoring Presented by: John Antanies Principal and Founder Envoy Development, LLC

Data Historians Data historians capture data from DCS and PLC systems, saving it for periods of years. How many in the audience have a data historian such as PI, IP.21, ParcView, etc?

Reliability Reliability suffers when maintenance issues that should have been identified are not Reliability suffers when process issues that should have been identified are not Examples: Motors or bearings fail Temperatures, amps, and vibration monitors typically increase before the failure Flows suddenly become insufficient Valves start to slowly open or close and eventually cause issues Mixers, pumps and blowers fail but don’t go undetected because the motor is running Belts or couplings on pumps/agitators/blowers shear but don’t set off an alarm

Most data historian users are still using them the same way they did in the early 1990s: Looking at hundreds of trends Dumping data into Excel The result? You miss things. What if you could identify variables that are out of limits instantly, without resorting to trends and spreadsheets? Think about this…

Operational Efficiency Essentials Reliability: What issues need focus now? Metrics: What drives KPIs? Sustainability: How do we preserve benefits? Benchmarking: Are we operating within limits?

Data Collection Considerations Data must be collected continuously Data must be aggregated only when the process is running Further processing must be done by grade/product and/or production rate Limits can then be calculated: Defined moving time frame (3 or 6 months) Fixed time period (period where the process was understood to have ran well) Best in class query (days or product runs that meet defined criteria)

Data Collection Example of data collection topology Server Side dbEnvoy Microsoft SQL Database Envoy.DC Data Collection Service PI System Custom Process Database AF SDK or PI SDK Other Implementations Hourly Aggregations Daily Aggregations Limits and Targets calculations Per Work Shift Aggregations Support Backfilling

When did costs change? Defining when a Key Performance Indicator (KPI) changed is not as easy as one might think… Or here? Here? Or somewhere else?

A CUSUM Chart Tells Us… Costs actually changed twice, but most significantly on Jul 23. When the line is going down, the variable is below average; the steeper the slope, the more negative the value. When the line is going up, the variable is above average. Points where the line goes from a negative to a positive slope (or vice-versa) are called inflection points. If we calculate and index the CUSUM inflection points for historian variables, we can identify what else changed when costs changed.

Case Study: Web Breaks We detected web breaks increased substantially on May 18 Remember, when the CUSUM line has a negative slope, the value is below the long term average; for web breaks, low is good. On May 18 the line suddenly moved positive. What changed? CUSUM chart on left shows that breaks increased sharply after May 18

Statistical Analysis With CUSUM Filtering If we look at tags that were different in a statistically different manner (high web breaks vs low) we have over 700 variables. When we filter by CUSUM inflection we have less than 40 variables Redacted

Web Breaks Finding This customer removed an additive to try and save money Once we identified this, they put it back on and web breaks declined

Case Study: Chemical Mixer CLO2 MIXER CURRENT: 999-II-999 Two Sigma Limit : 50.04 to 81.29 Current Value : 35.85 D/C Mixer Residual: BPRESDL.L Two Sigma Limit : -0.2 to 1.09 Current Value : 2.81 The key takeaway from this case study: If you don’t recognize what is going on, don’t be afraid to contact the equipment manufacturer. A keyway corroded away and caused costs to increase $4,140/day Customer Comment: Good find on the mixer, I spoke with GL&V this morning and they are pretty sure the mixer came off the shaft, we  have a spare in house and plan on changing it out this Wednesday   Costs skyrocketed when these two events occurred

Case Study: Sheet Caliper We detected that caliper increased There are two distinct periods of high caliper What caused this process deviation?

Caliper Findings A roll in a stack had been taken out of service; since it was behind a door, it went unnoticed

Questions?

Joh Contact Information John Antanies Principal and Founder Envoy Development, LLC Antanies@envoydevelopment.com 602-431-0039 (office) 602-740-7511 (mobile) www.envoydevelopment.com