Management of the Advanced LIGO Seismic Isolation System Development

Slides:



Advertisements
Similar presentations
CEMRI Director – Anil Virkar, Associate Director – Valy Vardeny IRG1 (Plasmonics) – Ajay Nahata, IRG2 (Spintronics) – Brian Saam Education/Outreach – Debra.
Advertisements

LIGO-G D Quiet Hydraulics Board: Purpose, Scope, Charter and Plans Dennis Coyne Kick-off Stanford, 16 Oct 2003.
 In t he last lesson we looked at two professional bodies: › BCS (British Computer Society - UK) › ACM (Association of Computing Machinery – USA) 
In Today’s Global Environment Larry Butz February 18, 2008 Innovation.
Title: Introduction to Engineering Data 10/16/2010 Prepared by Morgan Baron, Fellow – GK12 Program Presented at Hoboken High School Supported by: NSF Graduate.
LIGO- G W LIGO Update by Fred Raab Local Educators Network LIGO Hanford Observatory October 27, 2005.
LIGO-G M LIGO Laboratory1 Adv. LIGO Program Management (PM) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M LIGO1 Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule Dennis Coyne HEPI Installation Readiness Review Feb 11,
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M Advanced LIGO1 Finite Element Modeling Requirements Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
LIGO-G W LIGO Hanford Observatory Manpower Frederick J. Raab, LIGO Hanford Observatory.
Nov ’01, page 1 Current Work on Hydraulics for LIGO 1 and Advanced LIGO Rich Abbott, Graham Allen, Daniel DeBra, Joe Giaime, Giles Hammond, Marcel Hammond,
LIGO-G M Advanced LIGO1 Mass Limits & Balancing Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech.
LIGO-G D Advanced LIGO: Detector Organization, Responsibilities, Authority and Decision Tree: SUS and COC Dennis Coyne, Carol Wilkinson, David.
PRESENTATION OF AWARDS Stephen O. Dean, President Fusion Power Associates Annual Meeting and Symposium December 16-17, 2014.
LIGO G PLIGO Laboratory1 Change Request CR Replace LIGO Document Management System Philip Lindquist, Caltech August 5, 2005.
LIGO- GXXXXXX-XX-X Advanced LIGO Data & Computing Material for the breakout session NSF review of the Advanced LIGO proposal Albert Lazzarini Caltech,
Women and STEM (Science, Technology, Engineering and Maths) Bill Jones Executive Director Student Experience Julie Byrne Principal of Sheffield City College.
NSF SEEDS Advance Climate Survey Summary Results Hilary Cook Assessment Team Robert JohnsonNov 17, 2010 Aaron PuhrmannPresident’s Luncheon.
LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August.
The Future of US Accelerator Science – Comments from NSF Tony F. Chan Assistant Director MPS/NSF AAAS Chicago February 13, 2009.
G R Advanced LIGO Seismic Isolation R&D Dennis Coyne 8 Oct 2002.
GW Detectors noise and sensitivity
Text book page 139.  Supervisors: allocates jobs to subordinates and makes sure tasks are carried out satisfactorily  Team Leaders : facilitate the.
19 Aug 2003, LSC Hannover G Z1 State of the LSC Peter Saulson Syracuse University.
Production Engineering is the combination of Manufacturing Technology and Management Science.
LSC Meeting March 2006 LIGO-G Z 1 It’s Coming! A new DCC Document System Linda Turner Caltech.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
Career in technology By Jeff Ellerbeck Jan 16 2oo5.
LIGO-G Z 1 LSC Council Meeting Peter Saulson.
LIGO-G M Contract Plans and Strategy Irena Petrac Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference.
LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G Z.
Technical Innovation and National System Richard R. Nelson Nathan Rosenberg Innovation and Technology Transfer Perform by: Duarte Trindade; Pedro Leal.
Larry Fleischman Venture Financial Systems Group, LTD. The Operational and Technical Impacts of New Products.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
PRESENTATION OF AWARDS Stephen O. Dean, President Fusion Power Associates Annual Meeting and Symposium December 16-17, 2015.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
Lasti ISI Update March 2007 On behalf of the SEI Team LIGO-G Z.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
LIGO PAC11, Nov 2001 Syracuse proposal to NSF LIGO-G Z 1 Proposal to NSF: “Research in Gravitational Wave Detection with LIGO” Peter R.
LIGO-G Z LIGO Scientific Collaboration1 Upcoming Meetings April APS meeting, April 14-17, Jacksonville, FL L-V Meeting, May 21-25, Cascina, Italy.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
LIGO at a Distance Dale Ingram on behalf of the LIGO Laboratory Public Outreach Team LIGO Hanford Observatory, Richland, WA
What is Physical Science?
From Blueprints to Bricks: The Origins of DNA Nanotechnology
Genetics Project Tasks
Integration in the Complex Plane
Advanced Engineering Mathematics, Third Edition
Boundary-Value Problems in Rectangular Coordinates
סדר דין פלילי – חקיקה ומהות ההליך הפלילי
Stan Whitcomb LSC meeting Livingston 21 March 2005
Stan Whitcomb LSC meeting Hanford 15 August 2005
Writing Prompts 11/06/16 – 11/10/16.

The Next Generation: Advanced LIGO
Category 1 Category 2 Category 3 Category 4 Category
Engineering Mathematics, Fourth Edition
Module A: Review Setting Expectations for Student Success
You must show all steps of your working out.
Question 1.
Advanced R&D Lab Review
Software Engineering Practices
Presentation transcript:

Management of the Advanced LIGO Seismic Isolation System Development Answer to Question 8 at the NSF Review Nov 2003 Carol Wilkinson, Dennis Coyne G030656-01

8. How is the advanced seismic isolation system development being managed? SEI Roles SEI Leader (Larry Jones, acting) who manages the entire SEI project. Reports to Advanced LIGO Project Manager SEI Cognizant Scientist (Joe Giaime) who oversees the science aspects of the SEI project Reports to, and is directed by, SEI Project Leader SEI Cognizant Engineer (Larry Jones) who oversees the technical and project aspects of the SEI project ETF Leader (Brian Lantz) who leads and manages the ETF effort. G030656-01

Revised Advanced LIGO Organization